X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0795222913000

Well Details

Well ID: 0795222913000
Loading map...
Location: 00/13-29-079-22W5/0
Location Alias: 00/13-29-79-22 W5M
Location Alias 2: 00/13-29-079-22 W5/00
Province: Alberta
County/Municipality: Municipal District of Smoky River No. 130
Well Name: CNRL HZ NVILLE 13-29-79-22
Operator Name: Canadian Natural Resources Limited
License Number: 0445332
License Date: 2012-04-12
License Status: Issued
Spud Date: 2012-07-10
Final Drill Date: 2012-07-21
Well Total Depth: 2813 m
Surface Hole Latitude: 55.867484
Surface Hole Longitude: -117.399491

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
10 Jul 2012 Horizon Drilling Inc. 31 N/A Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-07-10 132
2012-07-14 1163 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-23 Open Hole/Barefoot Completion 2808 2813 0
2012-09-27 Perforation 2769.4 2769.9 17
2012-09-27 Perforation 2668.4 2668.9 17
2012-09-27 Perforation 2567.8 2568.3 17
2012-09-27 Perforation 2453.4 2453.9 17
2012-09-27 Perforation 2351.3 2351.8 17
2012-09-27 Perforation 2250.4 2250.9 17
2012-09-27 Perforation 2141.7 2142.2 17
2012-09-27 Perforation 2027.5 2028 17
2012-09-27 Perforation 1913.6 1914.1 17
2012-09-27 Perforation 1799.3 1799.8 17
2012-09-27 Perforation 1697.6 1698.1 17
2012-09-27 Perforation 1583.3 1583.8 17
2012-09-27 Perforation 1483.4 1483.9 17
2012-09-27 Perforation 1382.2 1382.7 17
2012-09-27 Perforation 1294.9 1295.4 17
2012-10-25 Multi-Stage Fracture 2769.4 2769.5 0
2012-10-25 Multi-Stage Fracture 2668.4 2668.5 0
2012-10-25 Multi-Stage Fracture 2568 2568.1 0
2012-10-26 Multi-Stage Fracture 2453.4 2453.9 0
2012-10-26 Multi-Stage Fracture 2351.3 2351.8 0
2012-10-26 Multi-Stage Fracture 2250.4 2250.9 0
2012-10-26 Multi-Stage Fracture 2141.7 2142.2 0
2012-10-26 Multi-Stage Fracture 2027.5 2028 0
2012-10-26 Multi-Stage Fracture 1913.6 1914.1 0
2012-10-26 Multi-Stage Fracture 1799.3 1799.8 0
2012-10-26 Multi-Stage Fracture 1697.6 1698.1 0
2012-10-27 Multi-Stage Fracture 1583.3 1583.8 0
2012-10-27 Multi-Stage Fracture 1483.4 1483.9 0
2012-10-27 Multi-Stage Fracture 1382.2 1382.7 0
2012-10-27 Multi-Stage Fracture 1294.9 1295.4 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 5940 1019.1 0.0 5199.9
2014 8131 1254.8 0.0 7105.1
2015 8583 1109.3 0.0 9520.7
2016 8646 703.2 0.0 9569.7
2017 4432 225.7 0.0 4259.0
2018 5490 605.7 0.0 5326.3
2019 2143 268.7 0.0 1593.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-24 No Incident N/A N/A
2012-12-12 No Incident N/A N/A

For data sources see[7]

References