If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0886090612020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":56.608778,"lon":-119.441971,"icon":""}]} |
Location: 02/12-06-088-09W6/0 | |
Location Alias: 02/12-06-88-09 W6M | |
Location Alias 2: 02/12-06-088-09 W6/00 | |
Province: Alberta | |
County/Municipality: Clear Hills County | |
Well Name: BIRCHCLIFF 102 HZ WORSLEY 12-6-88-9 | |
Operator Name: Enercapita Energy Ltd. | |
License Number: 0436623 | |
License Date: 2011-09-08 | |
License Status: Amended | |
Spud Date: 2011-09-30 | |
Final Drill Date: 2011-10-07 | |
Well Total Depth: 1878 m | |
Surface Hole Latitude: 56.608778 | |
Surface Hole Longitude: -119.441971 |
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-03 | 1034 | Horizontal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-17 | Open Hole/Barefoot Completion | 1875 | 1878 | 0 |
2011-10-17 | Multi-Stage Fracture | 1870 | 1870.8 | 0 |
2011-10-17 | Multi-Stage Fracture | 1766.7 | 1767.5 | 0 |
2011-10-17 | Multi-Stage Fracture | 1676.1 | 1676.9 | 0 |
2011-10-17 | Multi-Stage Fracture | 1573.1 | 1573.9 | 0 |
2011-10-17 | Multi-Stage Fracture | 1470.2 | 1471 | 0 |
2011-10-17 | Multi-Stage Fracture | 1367.9 | 1368.7 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 216 | 9.0 | 0.0 | 0.0 |
2012 | 8291 | 1945.8 | 0.0 | 3377.2 |
2013 | 8284 | 151.8 | 0.0 | 2259.5 |
2014 | 8554 | 359.0 | 0.0 | 3563.4 |
2015 | 8361 | 193.8 | 0.0 | 3537.6 |
2016 | 6609 | 101.2 | 0.0 | 3125.7 |
2017 | 4748 | 83.8 | 0.0 | 3105.4 |
2018 | 8667 | 163.5 | 0.0 | 4958.8 |
2019 | 2123 | 32.7 | 0.0 | 1152.1 |
For data sources see[5]