If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0635122710000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.482589,"lon":-115.722873,"icon":""}]} |
Location: 00/10-27-063-12W5/0 | |
Location Alias: 00/10-27-63-12 W5M | |
Location Alias 2: 00/10-27-063-12 W5/00 | |
Province: Alberta | |
County/Municipality: Woodlands County | |
Well Name: NORTHROCK JUDY CREEK 10-27-63-12 | |
Operator Name: | |
License Number: 0037284 | |
License Date: 1969-11-28 | |
License Status: Abandoned | |
Spud Date: 1969-11-30 | |
Final Drill Date: 1969-12-08 | |
Well Total Depth: 1501.7 m | |
Surface Hole Latitude: 54.482589 | |
Surface Hole Longitude: -115.722873 |
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1972-03-08 | Perforation | 1463.6 | 1465.5 | 7 |
1972-03-08 | Perforation | 1478.6 | 1481.9 | 7 |
1972-03-09 | Acid Treatment | 1463.6 | 1481.9 | 0 |
2007-08-09 | Packing Device Capped w/Cement | 1312 | 1320 | 0 |
2007-08-09 | Perforation | 1289 | 1290 | 13 |
2007-08-11 | Remedial Casing Cementing | 1289 | 1290 | 0 |
2007-09-10 | Perforation | 617 | 618 | 13 |
2007-09-11 | Remedial Casing Cementing | 617 | 618 | 0 |
2007-09-13 | Perforation | 478 | 479 | 13 |
2007-09-13 | Remedial Casing Cementing | 478 | 479 | 0 |
2007-09-15 | Perforation | 300 | 301 | 13 |
2007-09-16 | Remedial Casing Cementing | 300 | 301 | 0 |
2007-09-18 | Perforation | 175 | 176 | 13 |
2007-09-18 | Remedial Casing Cementing | 175 | 176 | 0 |
For data sources see[3]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1977 | 4223 | 9667.4 | 0.0 | 21.6 |
1978 | 6918 | 18185.6 | 0.0 | 21.9 |
1979 | 2713 | 3364.1 | 0.0 | 1.4 |
1980 | 1880 | 2620.0 | 0.0 | 0.0 |
1981 | 3119 | 4577.5 | 0.0 | 26.9 |
1982 | 5194 | 7448.6 | 0.0 | 63.6 |
1983 | 4311 | 4292.1 | 0.0 | 19.4 |
1984 | 3880 | 4897.1 | 0.0 | 26.0 |
1985 | 4142 | 4823.4 | 0.0 | 8.9 |
1986 | 4739 | 4652.5 | 0.0 | 67.1 |
1987 | 5700 | 4651.5 | 0.0 | 214.7 |
1988 | 5107 | 3047.8 | 0.0 | 286.1 |
1989 | 6248 | 3275.7 | 0.0 | 522.6 |
1990 | 5479 | 2144.5 | 0.0 | 334.1 |
1991 | 5363 | 1770.8 | 0.0 | 470.5 |
1992 | 6499 | 1700.7 | 0.0 | 808.3 |
1993 | 6860 | 1327.5 | 0.0 | 564.7 |
1994 | 8320 | 1745.3 | 0.0 | 1002.2 |
1995 | 7388 | 1472.0 | 0.0 | 1136.0 |
1996 | 6262 | 1020.0 | 0.0 | 1876.5 |
1997 | 7763 | 1360.6 | 0.0 | 2139.0 |
1998 | 6890 | 612.4 | 0.0 | 1043.5 |
1999 | 24 | 0.0 | 0.0 | 20.5 |
For data sources see[4]