X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-123-46556

Well Details

Well ID: 37-123-46556
Loading map...
Country: United States
State: Pennsylvania
County: Warren
Municipality: Brokenstraw Township
Operator Name: MCCOOL JOHN E
Well Pad ID: 146687
Farm/Lease Name: FOREST BROKENSTRAW PAD A 2526
License Status: Regulatory Inactive Status
Spud Date: 12/17/2011
Permit Date: 10/21/2011
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.844431
Longitude: -79.283394

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 PA GEN ENERGY CO LLC 0.00 0 0.00 0 0.00 0
2012 PA GEN ENERGY CO LLC 0.00 0 0.00 0 0.00 0
2013 PA GEN ENERGY CO LLC 0.00 0 0.00 0 0.00 0
2014 PA GEN ENERGY CO LLC 0.00 0 0.00 0 0.00 0
2015 PA GEN ENERGY CO LLC 0.00 0 0.00 0 0.00 0
2016 PA GEN ENERGY CO LLC 0.00 0 0.00 0 0.00 0
2017 PA GEN ENERGY CO LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-2 Drilling Fluid Waste (in Barrels) 129.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2012-1 Drill Cuttings (in Tons) 918.19 Tons LANDFILL SWF 1032-WV0109
2012-1 Drilling Fluid Waste (in Barrels) 129.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2012-2 Fracing Fluid Waste (in Barrels) 14,879.62 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2012-2 Fracing Fluid Waste (in Barrels) 110.00 Bbl INJECTION DISPOSAL WELL 34-133-20525
2012-2 Fracing Fluid Waste (in Barrels) 76.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2012-2 Fracing Fluid Waste (in Barrels) 77.00 Bbl INJECTION DISPOSAL WELL 34-155-21894
2012-2 Fracing Fluid Waste (in Barrels) 77.00 Bbl INJECTION DISPOSAL WELL 34-155-23203
2012-2 Fracing Fluid Waste (in Barrels) 13,319.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-2 Fracturing Fluid Waste (in Tons) 10.77 Tons LANDFILL 100329
2012-2 Produced Fluid (in Barrels) 1,350.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-1 Fracing Fluid Waste (in Barrels) 938.81 Bbl REUSE OTHER THAN ROAD SPREADING

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2024819 Primary Facility 12/06/2011 Construction No Violations Noted
2029516 Primary Facility 12/20/2011 Drilling/Alteration No Violations Noted
2029519 Primary Facility 12/27/2011 Drilling/Alteration No Violations Noted
2061426 Primary Facility 04/11/2012 Routine/Complete Inspection No Violations Noted
2061548 Primary Facility 04/17/2012 Drilling/Alteration No Violations Noted
2087144 Primary Facility 07/18/2012 Routine/Partial Inspection No Violations Noted
2103574 Primary Facility 08/29/2012 Routine/Complete Inspection No Violations Noted
2214401 Primary Facility 10/18/2013 Routine/Complete Inspection Violation(s) Noted
2230102 Primary Facility 12/18/2013 Compliance Evaluation No Violations Noted
2774530 Primary Facility 2018-09-13 Administrative/File Review No Violations Noted Operator called with an updated start date on plugging procedures. Plugging was originally scheduled to begin on 10/01/2018. Date has been moved up to 09/24/2018, tentatively. An updated NOI will be submitted to Department.
2777243 Primary Facility 2018-09-20 Plugging(Includes Plugged/Mined Through) No Violations Noted Blowing well down prior to plugging procedures. Flowback operation began Tuesday morning and is still in progress. Gas is being flared. Tank on site and located within containment for fluid returns. Service rig will be on site tomorrow to remove 2 3/8" tubing from well. First cement plug is expected to be set Monday.
2779188 Primary Facility 2018-09-25 Routine/Partial Inspection No Violations Noted Well has been acquired by a new operator. Current operator was in the process of plugging well. Kill fluid was pumped into the tubing and casing. There was no pipe removed from well. Well remains on inactive status. New operator will have 30 days from date of sale to transfer the permit through the Department. This information was received Monday, September 24.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2214401 680694 10/18/2013 11/04/2013 210UNPLUG - Failure to plug a well upon abandonment Administrative inactive status

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
680694 303991 NOV - Notice of Violation Comply/Closed 12/10/2013

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/23/2012 07/23/2012 2790.00 4,626,006.0
2 07/23/2012 07/23/2012 2805.00 4,816,896.0

For data sources see[7]

References