X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-121-45160

Well Details

Well ID: 37-121-45160
Loading map...
Country: United States
State: Pennsylvania
County: Venango
Municipality: Allegheny Township
Operator Name: 5M OIL LLC
Well Pad ID:
Farm/Lease Name: TIGHTPINCH 3251
License Status: Active
Spud Date: 02/10/2014
Permit Date: 2/12/2013
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.553461
Longitude: -79.568189

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 CATALYST ENERGY INC 0.00 479.04 120 0.00
2015 CATALYST ENERGY INC 0.00 15.66 30 0.00
2016 CATALYST ENERGY INC 0.00 34.06 152 0.00
2017 CATALYST ENERGY INC 0.00 55.94 365 0.00

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2014-A00 Produced Fluid (in Barrels) 1,382.26 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016-A00 Produced Fluid (in Barrels) RWC 802 395.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2016-A00 Produced Fluid (in Barrels) RWC 802 33.00 Bbl ROAD SPREADING
2017-A00 Produced Fluid (in Barrels) RWC 802 325.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2231433 Primary Facility 12/20/2013 Routine/Complete Inspection No Violations Noted
2244206 Primary Facility 02/10/2014 Routine/Complete Inspection No Violations Noted
2244211 Primary Facility 02/10/2014 Drilling/Alteration No Violations Noted
2280238 Primary Facility 06/20/2014 Routine/Complete Inspection No Violations Noted
2309726 Primary Facility 10/01/2014 Site Restoration No Violations Noted
2384622 Primary Facility 07/02/2015 Site Restoration No Violations Noted
2763656 Primary Facility 2018-08-15 Routine/Partial Inspection No Violations Noted Inspection shows well equipped for production with rods, tbg, and pump jack with an electric motor. Annulus tied in for gas production. Site restoration complete.

For data sources see[6]

References