34-031-27212

Well Details

Well ID: 34-031-27212
Loading map...
Country: United States
State: Ohio
County: Coshocton
Municipality: Tiverton Township
Operator Name: HELMS OIL
Well Pad ID:
Farm/Lease Name: KOCIAN
License Status: Drilling
License Date: 2016-05-09
Spud Date:
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 40.447923651
Longitude: -82.17999119

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-02-25 Proposed Formations:CLINTON, Issued Date:2/25/2013, Expired Date:2/25/2015 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2017-12-14 Proposed Formations:CLINTON, Issued Date:12/14/2017, Expired Date:12/14/2019 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Record Last Modified 2017-12-21 WELL HAS BEEN IN DRILLING STATUS SINCE EARLY 2013, STATUS CHANGED TO DRILLING 05/09/16 ALE
Construction Permit Expires 2019-12-14 WELL HAS BEEN IN DRILLING STATUS SINCE EARLY 2013, STATUS CHANGED TO DRILLING 05/09/16 ALE

For data sources see[2]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 HELMS OIL 0 0 365
2017 HELMS OIL 0 0 365

For data sources see[3] [4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 HELMS OIL Brine 0 365
2017 HELMS OIL Brine 0 365

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0044837008 2017-08-17 Drill / Deepen / Reopen No Violations No changes at the drill site. The rig was idle and there were no signs of any recent activity. I called Terry Helms again, and he still maintains that his accountant is sending the completion reports and the production reports. I suggested that he be proactive and contact Steve Opritza to get the situation straightened out. I reminded Terry that the rig has been sitting here for close to 4 years and he has to do something. He said that he was driving and he would call me back to get Steves number.
0088509734 2017-10-31 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the access road looked freshly graded and the drill site was recently mowed. There was a string of lights hanging in the shanty. I could not tell by the condition of the tools if there has been any drilling recently, because they were hanging in the hole. The pit was still not re-lined and there was mostly dry drill cuttings in the bottom. There was some clear water in the pit, but there has been rain in the area recently. There are no records of a new drilling permit being issued for this well. I called Terry Helms and he didnt answer so I left a voice message.
0119255240 2016-02-09 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. There were no sags in the pit liner and there were no leaks or spills around the drill site.
0142045281 2016-07-22 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. I called and he said that he has not done any drilling. He was still at a depth of 990. I found no leaks or spills around the drill site.
0154221633 2014-10-24 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling.
0205702507 2014-07-17 Drill / Deepen / Reopen Violations Noted On the day of my inspection I found that Terry Helms was not drilling. There was conductor casing in the ground and cuttings in the pit. I found no drilling permit posted in or around the drilling rig. I found that the drilling pit was not lined. The pit must be lined and the permit must be posted before continuing with any drilling operations or well construction. Failure to comply may result in further enforcement actions.
0211304912 2016-09-23 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. There had been no apparent activity at the drill site since the last inspection. The pit liner had not been replaced. There was no fluid in the pit, and the drill cuttings were from formations above the Berea, where they would not have been exposed to brine water.
0218298638 2015-02-19 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. The ground was snow covered at the time of my inspection.
0242466865 2018-04-05 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was not drilling and there was no one working at the drilling site. I called Terry Helms and he said that his driller was sick. There were no changes at the drill site.
0341152958 2016-08-02 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. There were no sags or visible tears in the pit liner. I found no leaks or spills around the drill site. I called Terry and left a message to contact me. He returned my call and we discussed the fact that there has been no drilling activity for quite some time. Terry has claimed that he cant find help to get the well drilled, so he only drills by himself on the weekends. I asked that he make an effort to get some drilling done and start to show a little progress on the well each month. He did agree and said that he would try to get out there this weekend.
0374367730 2018-04-25 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was drilling at a depth of 2974 feet. The pit levels were good; there were no sags or visible holes in the liners, and there were no signs that the pits were leaking. The permit was posted in the rig, and I found no leaks or spills around the drill site.
0433536936 2018-10-17 Production Wells No Violations On the day of my inspection I found that the well was equipped with a pumping unit. The unit was in operation and powered with a gasoline engine. Terry Helms was at the site monitoring the well. Gene Matheny was rigged down and moving out from completing the well. Terry notified me two weeks ago that Producers was going to frack the well the week that I was out of town. Terry said that the well had only been pumping for a half hour when I arrived at the site. He had one of the drilling pits closed and he was starting to work on the other. The drilling rig and all associated materials had been moved out, and the site was graded out. There were no sags or visible holes in the liner and the fluid level was well below the top of the pit wall.
0461513606 2018-02-27 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was drilling at a depth of 2475 feet. They were bailing the hole when I left the rig. There were no sags or holes in either pit liner. The fluid level in the first pit was staying below the top of the liner and the second pit still had plenty of room for fluid. The driller said that the water got ahead of them so they were back to one shift. I found no leaks or spills around the drilling rig or water tanks.
0464716068 2015-05-15 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. There were no sags or visible tears in the pit liner and I found no leaks or spills around the drill site.
0545943216 2018-04-17 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was drilling at a depth of 2847 feet. They had just shut the rig down when I arrived to replace the clutch. The pit levels were good and there were no signs that the front pit was leaking again. The fluid level was significantly higher than my last inspection, and there were no sediment lines on the side walls that would indicate fluid loss. The permit was posted and there were no leaks or spills around the drill site.
0579802511 2017-06-22 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the drilling rig was still rigged up and sitting idle. There was no signs of any recent activity at the drill site. The 7 inch diameter casing was still on the racks, and the pit liner had not been changed out. I did get notification recently that Terry Helms got his annual production reports up to date, but he still has other documents to submit before he can re-apply for a new drilling permit.
0599527270 2018-02-23 Production Wells No Violations On the day of my inspection I found that the dike was starting to fill up with water again, but it was not yet flowing over the front wall. The front wall of the dike had not been built up with soil. I called Clayton King and he said that he was out this morning at 08:30 to drain the dike down again and he would be back this afternoon. He claimed that he did get his skid loader moved to the site but he didnt build the front dike wall up because he plans to start removing material today. I did see the skid loader parked at the site. I recommended that he get another absorbent boom to put across the front of the dike until he gets done working on removing material. He said that he will try to get one.
0611304200 2016-07-05 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. I called him and he said that he has not been able to do any drilling since my last inspection. He is still at a depth of 990. I found no leaks or spills around the drill site.
0666882845 2015-12-14 Drill / Deepen / Reopen No Violations Terry Helms contacted me to report that the bond log showed the top of the cement at 66 feet. I told him he could top the annulus off with sack cement.
0677106529 2017-04-10 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the drilling rig was idle. There were no signs of recent activity. The tools were suspended in the hole. The pit liner still needs to be replaced. The pit is starting to collect rain water. Terry has a 1600 gallon poly tank at the drill site that has cracked open at the bottom. There was only 3 inches of fluid in the bottom, but it was high enough that there was some leaking onto the ground. There was a 12 to 15 inch area of oil/brine impacted soil in front of the hole. I called Terry Helms and told him the tank needs to be removed from the site and the contaminations needs to be cleaned up right away. I also told him that he needs to get the pit re-lined as soon as possible, regardless of whether or not his permit was expired. Finally, I questioned him again on his plans for the well. He said that he plans to finish it and claimed that all of his required documents have been submitted. I called Steve Opritza to ask if he had any information.
0724283547 2018-07-27 Preliminary Restoration No Violations On the day of my inspection I found that nothing had been done at the well site since my last inspection. The drilling rig and all the associated equipment and drilling materials were still at the site. The pits were still open. I did not find any holes in the liners. The upper pit was mostly full of drill cuttings with very little fluid on top. The lower pit had two or three feet of fluid in the bottom.
0728546100 2015-01-21 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the drilling pit was lined and there was a copy of the permit in the supply trailer. The violations have been resolved. I found no leaks or spills. I contacted Terry Helms to get an update on the current depth. He reported that he had a surface hole drilled to a depth of 510.
0737289200 2018-06-26 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the drilling rig, tool trailer, 7 inch casing string, three 100 barrel steel tanks, and various drilling equipment were still on the location. The well was shut in with a swage and valve. The drilling pits were both still open. I called Terry Helms to ask what he was doing. He said that he was trying to get everything out of here and he was trying to get on the schedule for Producers to frac the well. Terry said that he planned to leave the pits open until after the frac job to flow the well back.
0758647839 2016-11-28 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. There were no signs of any recent drilling activity at the site. The pit had not been re-lined. I called Terry Helms to ask about his progress with getting a new permit. I spoke with Terry Helms, who claimed that he had applied for a re-issue permit approximately one week ago.
0775865396 2014-07-24 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. The pit was still not lined and the permit was still not posted.
0786823492 2016-09-15 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. There had been no apparent activity at the drill site since the last inspection. The pit liner had not been replaced. I called Terry Helms and he said that he was working on getting a new pit liner. He also claimed that he was trying to contract a driller to finish the well for him.
0849088421 2015-11-06 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. The pit was dry. The 8.625 casing was still on the rack. I found no leaks or spills around the drilling rig.
0913995384 2018-08-13 Preliminary Restoration No Violations On the day of my inspection I found that Terry Helms was starting to move his drilling rig and equipment off the well site. Terry had his tool shed moved out, and he said that George Camphire was supposed to have the rig moved out within the next few days. Terry was also starting to close one of the drilling pits. He said that he wanted to leave the lower pit open for the frac job. Terry estimated that he would frac the well in the next four weeks.
0939838008 2018-01-02 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not at the drill site. There were fresh vehicle tracks in the snow leading back to the rig. The new drill line was still on a spool and there were no indications that Helms had done any drilling. There was a new pit liner installed in the drilling pit. There were no leaks around the four 100 barrel steel water tanks.
0976450870 2017-04-28 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the plastic tank had been removed and the stained soil mostly cleaned up. The pit was dry and the liner had not been replaced. The 7 inch casing was still on the pipe racks. There were no signs of recent drilling activity. I called Terry Helms to ask about his production reports. He still claims that his accountant has been sending them into the State. I called Jon Austin at Central Office to ask about the production reports. He went through his records and said that he has nothing after 2012.
0978407506 2014-11-10 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. The 8.625 casing was still on the rack. The pit was still not lined and no permit was posted in the drilling rig. The pit was empty and There were no leaks or spills around the drill site. I contacted Terry Helms to remind him that he must have the pit lined and he must have a copy of the permit on location before he can run any casing. I also reminded him of his responsibility to provide adequate notification prior to running casing. I also informed him that I need proof that the casing was tested and that the casing must be centralized.
1005746190 2018-01-25 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was drilling at a depth of 1200 feet. There was a three man crew working on the rig. Steve Schultz was drilling for Terry. Steve said that he drilled an 8 inch diameter hole to a depth of 1130 feet and then reduced the hole to 6.5 inch diameter. He said that they would likely run the 7 inch diameter intermediate casing early next week. Steve said that the Berea was making some water and they were already through the black grit. There were no sags or holes in the new pit liner and there were no leaks or spills around the drill site. They had the re-issue drilling permit in the tool shed, so I asked Steve to get it posted in the shanty.
1012452220 2017-12-06 Drill / Deepen / Reopen No Violations On the day of my inspection I found that there were no changes to the drill site since my last inspection. The rig was still idle and there were no signs of recent drilling activity. The pit was not re-lined and it was dry. There was a new spool of drill line next to the rig. Terry Helms has not been granted a renewed drilling permit for this well.
1051492010 2018-03-02 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was not drilling and no one was at the drill site. The depth log showed that they were at a depth of 2530 feet and they got a hole full of water at 2500 feet. There were no leaks around the drilling rig and the pit liners were in good shape.
1078042547 2016-01-13 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. There were no sags in the pit liner and I found no leaks or spills.
1146585952 2018-06-13 Drill / Deepen / Reopen No Violations On the day of my inspection I found that most of the drilling rig floor and shanty had been moved out. The mast was down on the rig and it was ready to be moved. The tool trailer was still on site. The water tanks had been drained and moved. The drilling pits were still open. There was no one from Helms Oil working at the site.
1225185604 2018-11-05 Preliminary Restoration No Violations On the day of my inspection I found that the upper drilling pit was pushed in, and the lower drilling pit was still open. The fluid level was well below the top of the pit wall. The site still needs final grade and pit closure, but it is far to wet and muddy to bring in heavy equipment.
1233152096 2017-09-29 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the drilling rig was still in place. The pit was still open, but the liner had not been replaced. There was no fluid in the pit, only dry drill cuttings. Most of the site was grown up in weeds and there were weeds growing up through the 7 inch diameter casing on the pipe racks. There were no signs that any recent drilling has taken place. I did find a small (less than 5 inches in diameter) puddle of rusty water below the load valve on one of the steel water tanks. I tested the water with a low range Quantab and found the chloride level to be below 250 parts per million. Terry Helms claims that the water in the tanks is fresh water that he had hauled in for drilling. The low presence of chlorides is likely due to residue in the bottom of the tank. The re-issued drilling permit has not been issued yet and Terry Helms has expressed that he has no desire to plug or sell the well.
1252272664 2015-12-16 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the annulus was still open. I called Terry Helms. He claimed that he intended to top it off in the next two days. I also told him that he needs to pressure test the casing/cement job at 300 psi for 30 minutes, and I want to be present when the test is conducted. The permit was in the trailer. There were no sags or visible tears in the pit liner and I found no leaks or spills around the drill site.
1270689609 2015-03-03 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling.
1275451467 2016-01-21 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. I called him and he reported that he had drilled to approximately 600. There were no sags in the pit liner and I found no leaks or spills around the drilling rig.
1279988441 2018-03-08 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the smaller pit had been drained. There were still a couple inches of water in the bottom that the vacuum truck couldnt get, but it was starting to freeze. There was a layer of drill cuttings in the bottom of the pit so I could not actually see a hole. I will inspect the earthen bottom before Terry re-lines it. The rig was still down for repairs and there was no one working at the site.
1301085663 2016-01-14 Drill / Deepen / Reopen No Violations I visited the drill site with new inspector Jim Nicholson to give him a tour of a cable tool rig. Terry Helms was not drilling. We found no leaks or spills and there were no sags in the pit liner.
1325107587 2018-05-02 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was trying to come out of the hole with the drilling tools. They were having some mechanical problem with the rig. The depth chart sowed that they had drilled to 3116 feet. The pit liners and fluid levels were good.
1329879949 2016-01-29 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. I called him and he reported that he had drilled to approximately 640. There were no sags in the pit liner and I found no leaks or spills around the drilling rig.
1366092365 2016-03-24 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the fluid level had been drained below the source of the fluid leak. Terry Helms commented that if he could not repair the tank he would remove it.
1382648911 2016-07-14 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. I called and he said that he has not done any drilling. He was still at a depth of 990. I found no leaks or spills around the drill site.
1391859004 2016-03-17 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. The tools were secured in the top of the hole. The drilling pit fluid level was low and there were no sags or visible tears in the liner. I found a pin-hole leak in the seam of one of the 100 barrel tanks used to store drilling water. I conducted a field test for chlorides with a low range Quantab. The water tested at 644 parts per million. There was no standing water around the tank. I called Terry Helms to report the issue. He claimed that the tanks were full of fresh water. I suggested that there may have been salt water residue in the tank that was mixing with the fresh water resulting in a positive test for chlorides. He said that he would be out to repair the leak or drain the tank.
1412686951 2014-09-29 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. The pit was still not lined and the permit was still not posted.
1420826281 2015-01-05 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. There were no changes in the status of this drill site since the last inspection.
1427304908 2016-06-10 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. The tools were suspended over the well bore. There were no sags or visible tears in the pit liner and the fluid in the pit had mostly evaporated. One of the 100 barrel tanks was leaking fresh water from the load valve. I called Terry Helms and he said that he has not been out to drill in four weeks. He reported his depth at 990. He also claimed that he would be out to replace the valve on the tank.
1427481506 2015-03-27 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. There were no sags in the pit liner and I found no leaks or spills around the drill site.
1429196675 2015-04-15 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. There were no sags or tears in the pit liner and the fluid level was low enough that it was in no danger of breeching the wall. I found no leaks or spills around the drill site.
1431000822 2015-05-06 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. I contacted him and he reported that he was at a depth of 540. He claimed that he was into the shale and asked for a variance on the surface casing depth. I contacted Steve Opritza, Permitting Geologist for DOGRM, who authorized a variance based on the depth of the Big Injun sandstone.
1433162454 2015-05-29 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. There were no sags in the pit liner and the fluid level was low enough that there was no danger of breeching the pit wall. I found no leaks or spills around the drill site.
1440770160 2015-08-28 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. The pit was completely dry. The well bore was capped with a plate. The surface casing and intermediate casing was still on the pipe racks. I called Terry Helms and he said that he has not been able to do any drilling this summer.
1443809079 2015-02-05 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. The pipe was still on the rack. The pit was lined and I found no leaks or spills around the drill site. The ground was snow covered at the time of my inspection.
1444926727 2015-10-15 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. The pit was dry. The 8.625 casing was still on the rack. I found no leaks or spills around the drilling rig.
1449678926 2015-12-09 Drill / Deepen / Reopen No Violations On the day of my inspection Terry Helms ran used, tested 8.625 casing to a depth of 567. The casing was equipped with two centralizers and a guide shoe.
1449764861 2015-12-10 Casing String Witnessed No Violations On the day of my inspection Cemenco pumped 13 sacks of gel and 6 sacks of cotton seed hulls, followed by 150 sacks of class A cement. Circulation was not established throughout the job. I told Terry Helms that he must have a bond log performed to determine the cement top before resuming drilling operations.
1451498012 2015-12-30 Drill / Deepen / Reopen No Violations My inspection today was to witness Helms Oil pressure test the surface casing. When I arrived on location I was informed that the pressure testing had already taken place under inspector, Mark McCombs, supervision. Nothing more will take place today at this location. There is no pollution or contamination on this well site during my inspection.
1452005095 2016-01-05 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. There were no sags or tears in the pit liner and I found no leaks or spills around the drill site.
1454694369 2016-02-04 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. I called him and he reported being at a depth of 700. I found no leaks or spills around the drill site.
1455707708 2018-02-01 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was drilling at a depth of 1450 feet. The drilling permit was displayed in the drilling rig. There were no sags or visible holes in the pit liner, and the fluid level was approximately 10 to 12 inches below the top of the pit wall. The 7 inch casing was still on the pipe racks, and the driller said they were going to run it early next week. There were no leaks or spills around the drill site.
1455808107 2016-02-18 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. There were no sags in the pit liner and there were no leaks or spills around the drill site. I called Terry Helms and he reported that he was at a depth of 780.
1457112603 2016-03-04 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. The tools were sitting on a steel plate that was positioned over the open hole. There was a string of 7 casing staged on the pipe racks. The fluid level in the drilling pit was low enough that there was no danger of breeching the pit wall. There were no sags or visible tears in the pit liner. The ground was snow covered, but I found no signs of leaks or spills around the drilling rig. I called Terry Helms to get an update on the drilling status. He reported drilling to a depth of 830 with an 8 bit.
1458567261 2016-03-21 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the 100 barrel water tank was still leaking. It looked like there had been an attempt made to repair the leak. There was a small pin hole sized stream of water shooting out of the side of the tank. The puddle that had formed on the ground was frozen, but the water was still showing 644 parts per million chloride content. I called Terry Helms and told him that he must drain the tank to a level below the leak.
1460145416 2016-04-07 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. There were no sags in the pit liner and there were no leaks or spills around the drill site. I called Terry and he reported that he was at a depth of 890.
1462053426 2014-07-15 Drill / Deepen / Reopen Violations Noted I received a phone call from Terry Helms to inquire about surface casing requirements. When I questioned him further I found that he had already started to drill a new well without notifying the county inspector for the Division of Oil & Gas Resources Management. I informed him that he was in violation and reminded him of his responsibility to provide 24 hours notification as stated on the drilling permit.
1462730416 2016-05-16 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. The fluid level in the pit was low and there were no sags or tears in the liner. I found no leaks or spills around the drill site. I called Terry Helms and he reported being at a depth of 990.
1464702077 2016-05-31 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. The leak in the gas supply line had been addressed. I found no leaks or spills around the drill site. There were no sags or visible tears in the pit liner and the fluid level was very low.
1473341300 2016-09-08 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. The tools were suspended over the well bore. There was no evidence of recent activity. The 7 inch casing was still on the rack. The fluid in the pit had evaporated weeks ago, leaving behind a layer of drill cuttings in the bottom of the pit. On this inspection the drill cuttings were heavily tracked from deer. There were also numerous small holes in the walls of the pit liner, presumably from the deer entering and exiting the drilling pit. I found no leaks or spills around the drill site. I called Terry Helms and told him again that he needs to start showing some drilling progress. I also told him that he must re-line the pit before he does any more drilling.
1476211351 2016-10-11 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling, and there were no signs that any drilling has taken place since our last conversation. The pit was dry and had not been re-lined. I found no leaks or spills around the drill site.
1486392970 2017-02-06 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the drilling rig and all associated equipment was still set up on the location. The 7 inch casing was still on the rack. The pit liner had not been replaced. The material in the drilling pit was mostly dry. The drilling tools were suspended in the top of the hole. Terry has 1.5 inch orange plastic gas line ran from the existing tank battery to the drilling rig. I found a crack in the line that was blowing gas. I called Terry Helms, but he did not answer. I left a message reporting the gas leak, and I asked that he return my call to give an update on his intentions with the well. Terry did call me back. He claimed that he had the gas shut off to the rig, but he was having problems with Amish locals in regards to house gas, and he speculated that someone opened the valve. He said that he was just out there three days ago and everything was fine. He said that he would head out tonight after work to shut the gas off again. In regards to his plans for the drilling progress, Terry claimed that his accountant had sent in all of the production reports for past unreported years. He also claimed that he has insurance. I told him that I would call the main office to get some information.
1503668841 2017-08-25 Drill / Deepen / Reopen No Violations On the day of my inspection I found that there was still no change at the drill site. There were no indications that any work had ben done to prepare to go back to drilling. Terry Helms still has not submitted the required documentation on previously drilled wells, and he has not obtained a re-issue drilling permit. Terry also has not obtained a plugging permit, or expressed any plans to sell the well.
1513696345 2017-12-19 Drill / Deepen / Reopen No Violations On the day of my I inspection I found that the rig was still idle and there were no signs of any recent drilling activity. The pit liner had not been replaced and the new spool of drilling line was still on the ground. I received a copy of the reissued drilling permit for this well dated 12/14/17. I called Terry Helms to ask what his plans were. He said that he had some work to do on the rig and he needed to get the pit re-lined. He then showed up at the drill site while I was still there. He started the rig and started his kiln. Terry said that he was robbed of multiple drilling tools during the period when the rig was sitting idle. He said that he had to replace the tools and he planned to start drilling after the first of the year. The compliance notice for expired permit is resolved.
1516286016 2018-01-18 Drill / Deepen / Reopen No Violations On the day of m y inspection I found that Terry Helms was not drilling. The ground was snow covered and there were no fresh vehicle or foot tracks back to the drilling rig. There were no signs that of any recent drilling activity.
1517238251 2018-01-29 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was drilling at a depth of 1290 feet. The drilling permit was displayed in the drilling rig. There were no sags or visible holes in the pit liner, and the fluid level was approximately 10 to 12 inches below the top of the pit wall. The 7 inch casing was still on the pipe racks, and the driller didnt know if or when they were going to run it. There were no leaks or spills around the drill site.
1517938797 2018-02-06 Drill / Deepen / Reopen No Violations On the day of my inspection I fund that Helms Oil was running the 7 inch diameter intermediate casing. Terry Helms called me 24 hours in advance to notify me that they were running the casing. The casing will be pulled once the well is drilled to completion; it was not cemented or mudded. The 7 inch casing was ran to a depth of 1138 feet, where the hole was reduced from 8 inches to 6.5 inches in diameter. They went back to drilling once the casing was ran. The driller reported that he was at a depth of 1665 feet. There were no leaks or spills around the drill site. I found no sags or holes in the pit liner. The fluid in the pit was approximately 6 inches from the top of the pit wall. I mentioned to the driller that they need to watch the pit level because it was high. He said that he was aware, and they still had one empty 100 barrel tank on site to pump the water into.
1518027070 2018-02-07 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was not drilling. The access road has been cleared, there were fresh vehicle tracks in the snow, and the inside of the rig had been shoveled out, but there was no one at the rig. The pit level was still within 6 inches of the top of the pit wall. There were no visible leaks in the snow around the drilling rig or water tanks.
1518103880 2018-02-08 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was drilling at a depth of 1705 feet. Wilsons Water Hauling showed up while I was on location to pull a load of water out of the drill pit. The driller said that they didnt work yesterday because of the snow and they were waiting to have a load pulled out of the pit. The permit was posted in plain view in the drilling rig shante. I found no leaks around the drilling rig or water tanks. There were no sags or holes in the pit liner.
1518447858 2018-02-12 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was drilling at a depth of 1850 feet. They were in the Big Cinnamon and the driller said that the progress was slowing down. The permit was on display with the drilling chart and offset well information. There were no sags or holes in the pit liner and the fluid level was 8 to 10 inches below the top of the pit wall. I found no leaks or spills around the drilling rig or water tanks.
1518624444 2018-02-14 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was drilling at a depth of 2015 feet. The driller said that he was just getting out of the Big Cinnamon, and should be in the Lime soon. The fluid in the pit was high, it was within 4 or 5 inches of the top of the liner in one corner. I called Terry Helms to let him know t hat he needs to take a couple loads of fluid out. Terry said that he would get Wilsons Water Hauling out today. The driller also said that they have one empty 100 barrel tank on location and he has a pump there to pump a load out of the pit into the tank. I stressed the need to both Terry and Steve that they need to get it drained down today.
1519312297 2018-02-22 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was drilling at a depth of 2406 feet. The driller reported that they hit Oriskany water at a depth of 2305 feet. They are working two shifts now to carry the water. I also found that a second drill pit had been dug and lined next to the original pit. The liner overlapped to allow the first pit to drain into the second. The first pit was almost full of drill cuttings, leaving very little room for fluid. The driller said that they only got 40 barrels out when they had Wilsons Water Hauling come in on Tuesday.
1520349565 2018-03-06 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the pit fluid level was down another couple of inches from where it was 18 hours ago. I had Terry Helms walk over to inspect the pit with me again and I explained to him why I believed there was a hole in his pit liner. He agreed to have Wilson come in to drain the pit today. I requested that they pull the liner and inspect the earthen pit for sharp rocks before re-lining it. I will check back later today or tomorrow morning.
1520434497 2018-03-07 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the drilling rig was still down and there was no one at site. The pit had still not been drained and the fluid level was down another inch. I called Terry Helms and he said that he tried yesterday, but he couldnt get a water truck until noon today.
1521043442 2018-03-14 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the rig was still down and there was no one working at the drill site. The pit had not been re-lined yet. I called Terry Helms to request that he have his rig hands remove all sharp rocks from the bottom of the earthen pit before he put a new liner down. Terry said that he is still waiting on parts to arrive for his rig.
1521205622 2018-03-16 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was still working on rig repairs. The pit had not been relined yet. They predicted that they would be back to drilling next week.
1521480249 2018-03-19 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil had finished with the rig repairs, and the mast was back up. The driller was not present and they had not made any hole since the rig was down. There was one rig hand working on the drilling pits. He did find three small holes in the liner where I had suspected a leak. He tried to patch the holes, but I told him that I wanted a new liner installed. He said that he did not find any sharp rocks or roots when he was in the pit to put the patches on. He did not know what caused the holes. Terry Helms was away for a funeral, so I did not personally call him, but I did tell the rig hand multiple times that they need to put a new liner in rather than trying to patch holes.
1521553504 2018-03-20 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms had installed a new liner in the drilling pit. The crew was back to drilling. They had just started back up this morning and were still around 2530 feet. The driller said that he had a hole full of water. The permit was posted in the rig and there were no leaks or spills around the drill site.
1521819019 2018-03-23 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was not drilling and there was no one working at the drill site. The drilling log in the rig showed that they were at a depth of 2554 feet. The new pit liner only had a little snow melt in the bottom. I did not see any indications of new holes forming.
1522071933 2018-03-26 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was not drilling and there was no one working at the site. There were no signs of any drilling activity over the weekend, and the drilling log still showed 2554 feet. I called Terry Helms to ask if there were any problems. He didnt answer, so I left a message.
1522423677 2018-03-30 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was not drilling and there was no one working at the site. There were no signs of any drilling activity since my previous inspection, and the drilling log still showed 2554 feet. I called Terry Helms to ask if there were any problems, and his phone went straight to voice mail. He never returned my call from Monday. I also called Steve Schultz, the driller, and he didnt answer either. I did leave a message with Steve, but he never returned my call. I walked through the drill site and the equipment with Belmont County inspector Andrew Corder to familiarize him with a cable tool drilling rig.
1522438606 2018-03-30 Drill / Deepen / Reopen No Violations I was on site accompanied by Inspector Chris Grimm. During our visit we inspected the rig and the pits on location. The rig was not active on the day of our inspection. Although the rig was not current operating on this day they were currently in the Lime section of the well bore.
1523541663 2018-04-12 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was back to drilling. They were at a depth of 2715 feet. The smaller pit, which I had them re-line last month was half full of crystal clear water. Terry lined the pit with the white side of the liner facing out, so I could clearly see the bottom of the pit liner to scan for holes. There was a very thin layer of sediment that had gathered in a few spots, but most of the liner was highly visible. I did not find any holes in the liner; however, I did notice that the water level was down approximately one foot from the upper most dried sediment line on the side walls. The driller said that this was his first day drilling in almost a month, and Terry has been out maybe three or four days since he has been out sick. It is very windy where the drill site is located, on top of a crest in an open agricultural field. I asked the driller to keep an eye on the pit level and I will do the same. I warned him that if I see an unreasonable amount of perceived evaporation, now that they are back to drilling, they will need to drain the pit again.
1524839331 2018-04-27 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was performing a bit change. The drilling log showed that they were at a depth of 3012 feet. The fluid level in the drilling pits was good and I did not find any holes or sags in the liners. There were no leaks around the drill site and the permit was posted in the drilling rig. The crew started drilling again as I was leaving the site.
1525974281 2018-05-10 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was drilling at a depth of 3200 feet. The driller reported that he should be out of the Packer Shell by the end of the day. He said that they were going to shut down once they got to the top of the Clinton sand because they do not have the production casing tested yet. There were no sags or holes in the pit liners. The permit was posted in the rig.
1526996012 2018-05-21 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was not drilling. The depth chart showed that they had drilled to 3259 feet. Terry Helms was making repairs to the rig and waiting on new drilling line to be delivered. He showed me some cuttings samples where he was in the top of the Clinton sand. He predicted that he has about 80 more feet to go before he reached his total depth. Terry also said that his production casing was at Buckeye to be pressure tested and drifted. The pit levels wee good, there were no sags in the liners and there were no leaks or spills around the drill site.
1527171914 2018-05-24 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oi had the new drilling line on and they were drilling at a depth of 3267 feet. They predicted that they would be running production casing by the middle of next week. There were no sags in the pit liner and there were no leaks or spills around the drill site.
1527602093 2018-05-29 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was drilling at a depth of 3303 feet. The driller reported that he probably had one more run left until they hit their total depth. George Camphire delivered a string of used 4.5 inch diameter casing to the drill site. I did not see any pitting or excessive rust scale on the pipe. George said that Terry Helms had the pressure test paperwork. There were no sags in the pit liners and I found no leaks or spills around the drill site.
1527776571 2018-05-31 Casing String Witnessed No Violations On the day of my inspection I found that Helms Oil had drilled a 6.5 inch hole to a total depth of 3320 feet. They had used, tested and drifted 4.5 inch casing set at a depth of 3308 feet. Terry Helms said that the casing was equipped with 4 centralizers and a latch-down casing shoe. Cemenco loaded the casing and pumped 65 sacks of class A cement. Circulation was established once the latch-down plug was released and Cemenco started their displacement. They landed the plug, pressured up to 500 pounds and held it for 5 minutes.
1528123344 2018-06-04 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Hems Oil was pulling the 7 inch diameter casing from the well. Terry Helms said that they will be rigging down and moving the drilling rig out. Then they will bring in a service rig to complete the well.
1528379301 2018-06-07 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was rigging down and moving out. The shanty was disassembled and they were breaking down the drilling rig.
1531319387 2018-07-11 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the drilling rig, tool trailer, 7 inch casing string, and all of the associated materials and equipment were still on the drilling location. The pits were still open, but the liners were in good shape and the fluid level was low.
1535597825 2017-07-19 Drill / Deepen / Reopen No Violations On the day of my inspection I found that there were no signs of recent activity at the drill site. The pit liner had not been replaced and the 7 inch casing was still on the rack. I called Terry Helms to ask what his plans were. He blamed me and the State for giving him the run-around and taking his permit. He said that he will not sell the well and he will not plug it. I went over the documents that he still needs to submit before he can re-apply for a drilling permit to finish the well. He didnt give me much of a response. He said that he had to go and he would call me back in a couple days.
1542663500 2015-12-30 Drill / Deepen / Reopen No Violations George Camphire was on site today to pressure test the surface casing that was set. The well was pressured to 300 psi and set for a period of 45 minutes. With a loss of 5 lbs. pressure over the period of time it was shut in. The test meets the requirements to pass.
1545123312 2016-10-17 Drill / Deepen / Reopen Violations Noted On the day of my inspection I found that Terry Helms was not drilling. There was no evidence that any drilling activity had taken place since the previous inspection. There has been no reported drilling activity at this well since 5/16/16. The first notification that I received from Mr. Helms on this well was on 7/14/14, where I found that the well had already been spudded with conductor casing in the ground. The well is currently drilled to a depth of 990 feet, with 8.625 inch surface casing cemented in place at a depth of 567 feet. I have spoken to Mr. Helms on multiple occasions regarding his failure to show continued progress in well construction. Ohio Administrative Code 1501:9-1-02(I) states: Once a permit to drill has been issued pursuant to this rule, actual drilling of the well authorized by the permit shall be commenced within twelve* months of the date of issuance of such permit or the permit shall expire; if drilling is commenced but not completed within said twelve* month period, drilling shall be continued with due diligence following the twelve* month period or the permit shall expire. The current permit expired on 2/25/15, and drilling has not continued with due diligence. All drilling activity shall cease until a new/renewed drilling permit is issued. Mr. Helms has 30 days to apply for and obtain a new/renewed drilling permit for this well. If a new/renewed permit to drill is not obtained within the 30 day period, Helms Oil is required to plug and abandon the well.
  • Senate Bill 165, effective June 30, 2010: In non-urban areas, permits are valid once issued for 24 months.
1550589796 2019-02-19 Preliminary Restoration No Violations On the day of my inspection I found that Terry Helms had closed the last drilling pit. The site was still very rough in some places and still needs a final grade. There were still two trucks, one dozer, three 100 barrel tanks and three joints of tubing left at the well site. Terry still had the well plumbed directly to a 100 barrel tank that was less than 50 feet from the wellhead. There was a newer tank staged down at the existing tank battery at the lease road entrance. And there was a 2 inch diameter line buried from the wellhead in the direction of the tank battery. There was no identification posted yet. I found no leaks or spills around the well site or equipment.
1550822216 2018-02-20 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was drilling at a depth of 2280 feet. The driller reported the top of the Big Lime at a depth of 2155 feet. The pit level was high again. The water on to was clear and I could see that the pit was mostly full of cuttings rather than fluid. I talked to Terry Helms about it and he said that he was going to dig another pit next to the existing pit and allow the two to communicate.
1553261257 2019-03-22 Preliminary Restoration No Violations On the day of my inspection I found that the well site was 90% graded out and ready for planting. There was still a mound of soil and rock left from where the drilling pits were constructed. Helm Oil also still had the well plumbed to a 100 barrel tank that was set within 20 feet of the wellhead. I called Terry Helms and he said that he has been trying to get it done, but the ground has been too muddy. He said that he will try to get in here next week to move the tank and do some more grading of the site.
1557150142 2019-05-06 Preliminary Restoration No Violations On the day of my inspection I found that the preliminary restoration was not complete at this site. There were still tanks, trucks and a bulldozer at the site. The pit area was still very rough and needed to be graded. I called Terry Helms and he blamed the wet weather for not having it done yet. I went over the things he still needs to do.
1574847990 2014-09-10 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. The pit was not lined and there was no permit posted. There was a string of used 8.625 casing on the pipe racks. The casing was stamped with testing information and dated 7/21/14.
1578997227 2017-03-09 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the rig was still sitting idle. There were no signs of any recent drilling activity. Terry Helms has not received a renewed drilling permit yet.
1605708288 2017-01-24 Drill / Deepen / Reopen No Violations On the day of my inspection I found that there had been no changes at the drill site. There was no indication that any drilling activity had taken place since Mr. Helms was notified that his permit had expired.
1667271531 2017-02-24 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the rig was sitting idle. There was no one at the location and there were no signs of any recent drilling activity. The gas supply to the rig had been shut off, eliminating the leak from the plastic line. There were no leaks around the water tanks. The pit liner had not been replaced.
1683199190 2015-12-17 Drill / Deepen / Reopen No Violations On the day of my inspection Terry Helms topped off 66 of the surface casing annular space with 22 bags of sack cement.
1698530652 2015-11-30 Drill / Deepen / Reopen No Violations I was contacted by Terry Helms in regards to running the surface casing. I told him that he needs to get the casing cemented in the well as soon as possible. I gave him a verbal warning that I would cite him with a violation to plug the well if the surface casing was not ran in a timely manner. I requested that he provide documentation of the casing being tested, and I instructed him to use a minimum of two centralizers on the casing.
1715045252 2016-05-24 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. The tools were positioned over the well bore. The drilling pit fluid level was low and there were no sags in the liner. There was a gas leak in the 1 plastic line used to supply the drilling rig with gas from an existing tank battery. I called Terry to report the gas leak and to get an update on his current depth. He said that he hasnt been out to drill recently and he was still at 990. He also said that he would be out today to take care of the gas leak in the 1 plastic line.
1716247762 2016-06-17 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. I called and he said that he was still at a depth of 990. There were no sags in the pit liner and there were no leaks or spills around the drill site.
1746549231 2016-11-17 Drill / Deepen / Reopen No Violations On the day of my inspection I found that there had been no changes at the drill site. The pit had not been re-lined yet, and the 7 inch casing was still on the rack. I have not received notification of a renewed permit, and there was no indication in RBDMS that a new permit application had been filed.
1780200426 2014-08-13 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling.
1810727005 2016-08-19 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. There were no leaks or spills around the drill site. There were no sags or visible tears in the pit liner. The 7 casing was still on the rack. I was not able to make contact with Terry Helms.
1859319438 2018-03-05 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Helms Oil was not drilling. The rig mast was laid down and they were rebuilding the top end. The depth log showed that they were still at 2530 feet. Terry said that they have been down since Friday. The fluid level in the new pit was lower than what I had observed during my inspection on Friday. There was more fluid gone that what I would attribute to evaporation. The pit was lines with a white liner and the fluid was clear enough to see to bottom. I did not see any holes, but I still suspected an issue due to the amount of fluid loss from the pit. I asked Terry when the last time he had Wilsons out to take a load out of the pit. He said that Wilson hasnt been out for a while. I expressed my concerns to him and we walked over to look at the pit area. I noticed several sharp pieces of shale rock in the dirt pile from the pit excavation. I pointed the rocks out and Terry claimed that he did not see any sharp rocks sticking up when he lined the pit. I asked him to keep an eye on the fluid level. Terry maintained that it was from evaporation and wind. I made a mental note of where the level was and I will return first thing in the morning.
2016646193 2016-12-06 Drill / Deepen / Reopen No Violations I contacted Steve Opritza to verify Terry Helms claim that he had already submitted his application for a renewed drilling permit. Steve said that they did submit the application, but he was recommending the application be denied in lieu of unrelated compliance issues with Helms Oils other production wells. On the day of my inspection I found that Terry Helms was not drilling, and there were no signs that any activity has taken place at the site since the issuance of the compliance notice. The pit was still not re-lines and the 7 inch casing was still on the rack. There were no leaks or spills around the drill site.
2054818147 2015-06-23 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Terry Helms was not drilling. There were no sags or tears in the pit liner and the fluid level was down approximately four feet from the top of the pit walls. I found no leaks or spills around the drill site. I called him and found that he was still at a depth of 540. I told him that I could grant him a variance on the depth of the surface casing based on the bottom depth of the Big Injun. He claimed that he hit the top of the formation at 180 and he was out of the Big Injun sand at 270. He claims that he has been drilling in shale for at least 150 feet.
2077940098 2018-11-27 Preliminary Restoration No Violations On the day of my inspection I found that the primary drilling pit was completely closed. The secondary pit was still open. There were no issues with the pit liner or fluid level. The pumping unit was in operation while I was inspecting the site. Terry Helms had a 100 barrel steel tank set near the well. He did not have the flow line ran down to the main tanks yet. There were still two 100 barrel tanks staged along the access road, and three trucks left at the site. All other equipment and materials had been moved out. There were no leaks around the wellhead or tank.

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0205702507 US-OH-120952 2015-01-26 Dike or pit not able to prevent escape of Brine or other wastes
0205702507 US-OH-120953 2015-01-26 Failure to post permit
1462053426 US-OH-113379 2014-08-05 Failure to notify inspector; failure to submit cement tickets
1545123312 US-OH-114980 2017-12-29 Failure to drill in accordance with plans