Well ID: 37-003-22131 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.359444,"lon":-79.802861,"icon":""}]} |
Operator Name: PENNECO OIL CO INC | |
First Permit Date: 2010-09-22 | |
Last Permit Date: 2010-09-22 | |
Spud Date: 2010-11-03 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.359444 | |
Longitude: -79.802861 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 738.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 12312.0 | 366.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 15473.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 141.0 | 31.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2010-0 | DRILLING FLUID WASTE | 4730.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2013-0 | PRODUCED FLUID | 33.0 | Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0095443 | CREEKSIDE TREATMENT FACILITY | CREEKSIDE | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1930553 | 2010-11-03 | No Violations Noted | SITE IS BUILT. NO RIG. NO LINER IN PIT. PIT IS PROTECTED BY A CHAIN LINK FENCE. E&S, AND ACCESS, OK. | |
1930556 | 2010-11-04 | No Violations Noted | USE RIG 5. RIG DOWN FOR MEINTENANCE. DEPTH 335'. | |
1930574 | 2010-11-08 | No Violations Noted | USE RIG 5 @ 690'.HOME OWNER NEXT TO PAD SAID HIS WATER HAS TURNED BROWN. CONTRACTOR IS HOOKING UP A WATER BUFFALO TO TWO EFFECTED HOMES.
SITE, PIT, E&S, AND ACCESS, OK. |
|
1931207 | 2010-11-12 | No Violations Noted | On November 12th, 2010 I conducted an inspection of the above site in response to a water supply complaint. Drilling was taking place. The access road was in good condition. A Site ID and E&S Plan were posted on site. E&S controls were in place according to the plan. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of the inspection. Drinking water samples were collected from the well at the complainant¿s residence. | |
1933536 | 2010-12-01 | No Violations Noted | On Decmber 1st, 2010 I conducted a routine inspection of the above site. Drilling was completed. The well was not yet in production. The access road was in good condition. A Site ID and E&S Plan were posted on site. E&S controls were in place according to the plan. The drilling pits were closed. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of the inspection. | |
1939734 | 2010-12-14 | No Violations Noted | On Decmber 14th, 2010 I conducted a routine inspection of the above site. Drilling was completed. The well was not yet in production. The access road was in good condition. A Site ID and E&S Plan were posted on site. E&S controls were in place according to the plan. The drilling pits were closed. The site was rough graded. A crew was on site installing the pipeline. There was no evidence of spills or leaks and no accelerated erosion was observed at the time of the inspection. The operator was contacted to submit a schedule and plan for replacing the water supply impacted at 201 Will Court Rd, | |
1957796 | 2011-02-01 | No Violations Noted | On February 1st, 2011 I visited this site in response to the water supply investigation at 201 Will Court Rd. Drilling operations were completed. The water suppply was first impacted on 11/04/2010. Peneco representatives were onsite and water samples were split between Penneco and DEP. Results of the samples will determine what further actions the operator will need to take to replace or repair the water supply. | |
1961853 | 2011-03-08 | No Violations Noted | On March 8th, 2011 I visited this site in response to the water supply investigation at 201 Will Court Rd. Drilling operations were completed. The water suppply was first impacted on 11/04/2010. Peneco representatives were onsite and water samples were split between Penneco and DEP. Results of the samples will determine what further actions the operator will need to take to replace or repair the water supply. | |
2027549 | 2011-12-15 | No Violations Noted | Split sample with consultant. Awaiting results. | |
2077185 | 2012-06-19 | No Violations Noted | 06-19-2012 This was a follow up inspection to the orginal complaint #275486. John Ley, WQS SWRO met with Jim and Linda Wetzler at their house. A meeting with the Wetzlers, Penneco and the Department was going to be held on 06-20-2012. This meeting was held to give the Wetzlers a chance to document their concerns.
The first issue was the drainage water line extending across the property from the water buffalo, making it difficult to cut their lawn. Second, they found the area around the water well to be unsightly and wanted it cleaned up and the materials surrounding the well removed. They also requested that the old tire tracks in the yard be repaired. Lastly, they wanted the gas well site cleaned up and the bank below the pad/access road restored/removed to prevent water runoff from coming onto their yard. They mentioned a request made to Penneco that a drainage ditch be dug to channel the water away from their property. |
|
2081918 | 2012-07-10 | No Violations Noted | John Ley WQS and John Carson WQS SWRO were on site to conduct a split water sample with the Penneco vendor. Samples were collected and shipped for analysis. | |
2109086 | 2012-10-18 | No Violations Noted | John Ley WQS SWRO was on site to conduct a split water sample with the Penneco vendor. Samples were collected and shipped to the lab for analysis. | |
2115422 | 2012-11-14 | No Violations Noted | John Ley WQS SWRO was on site to conduct a split water sample with the Penneco vendor. Samples were collected and shipped to the lab for analysis. A copy of the water test results from the 10-18-12 split sample was handed to the Mrs. Wetzler while on site today. | |
2124677 | 2012-12-19 | No Violations Noted | John Ley WQS SWRO was on site to conduct a split water sample with the Penneco vendor. Samples were collected and shipped to the lab for analysis. A copy of the Department's water test results from the 11-14-12 sample was handed to the Mrs. Wetzler while on site today. The Glumac #1 well was inspected while on site. No violations were apparent. | |
2153483 | 2013-03-21 | Allegheny | White Oak Boro | No Violations Noted |