If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-27712 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.920896,"lon":-80.450211,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Richhill Township | |
Operator Name: CNX GAS CO LLC | |
Well Pad ID: 155376 | |
Farm/Lease Name: BRADDOCK RHL99EHSM | |
License Status: Active | |
Spud Date: 2019-01-11 | |
Permit Date: 2018-08-01 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 39.920896 | |
Longitude: -80.450211 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | CNX GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2019-M01 | Drilling Fluid Waste (in Barrels) RWC 803 | 32.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2019-M01 | Drilling Fluid Waste (in Barrels) RWC 803 | 1.40 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019-M02 | Drilling Fluid Waste (in Barrels) RWC 803 | 23.13 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2019-M02 | Drilling Fluid Waste (in Barrels) RWC 803 | 11.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-29 |
2019-M02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 5.63 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2019-M02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 1.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-29 |
2019-M02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 3.13 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ORDER 2016-29 |
2019-M02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 9.79 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019-M03 | Drilling Fluid Waste (in Barrels) RWC 803 | 19.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2019-M03 | Drilling Fluid Waste (in Barrels) RWC 803 | 6.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | ODNR 2015-29 |
2019-M03 | Drilling Fluid Waste (in Barrels) RWC 803 | 42.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2019-M03 | Drilling Fluid Waste (in Barrels) RWC 803 | 387.25 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019-M03 | Drilling Fluid Waste (in Barrels) RWC 803 | 8.25 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2019-M03 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 6.25 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2019-M03 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 10.83 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019-M03 | Produced Fluid (in Barrels) RWC 802 | 105.63 Bbl | REUSE (AT WELL PAD) |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2826108 | Primary Facility | 2019-01-09 | Preoperation Inspection | No Violations Noted | On January 9, 2019, the Department performed an inspection of the CNX, RHL99 well pad site. The site is located in Richhill Twp., Greene Co. The inspection was related to a request by the operator for pre-operational inspection prior to the commencement of drilling operations on the well site.
The operator has completed construction of the access road and well pad. The operator has installed all the E&S BMPs which appear in good condition and functional. The operator has finalized the permanent stabilization on the well pad fill slopes. The operator had begin hydro seeding the site the previous day, which has been impacted to a rainfall event. The operator has indicated that areas on the well pad fill slopes will be hydro seeded a second time. The operator has installed and stabilized the PCSM structures. 8 cellars have been set on the pad for conductor set for the start of drilling operations, after the pre-operational inspection. 5 wells have been permitted on the site at time of inspection and 3 new |
2830003 | Primary Facility | 2019-01-22 | Drilling/Alteration | No Violations Noted | The well was spud on 1/16/2019. The operator augered a 32" borehole to 100 feet. 100 feet of 26" welded conductor pipe was set at 100 feet and cemented to the surface through tubing. A cylindrical steel well cellar has been installed. The operator is currently on site drilling mouseholes. |
For data sources see[6]