37-105-21883

Well Details

Well ID: 37-105-21883
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Sweden Township
Operator Name: JKLM ENERGY LLC
Well Pad ID: 154232
Farm/Lease Name: SWEDEN VALLEY 107-1HU
License Status: Active
Spud Date: 2017-10-10
Permit Date: 2017-06-15
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.739441
Longitude: -77.899933

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-05-18 2018-05-26 11369.7 8,868,040.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water JKLM Carrier/Base Fluid Water 7732-18-5 100 85.3161 74,003,800.0
KFEAC-30 Keane Iron Control Citric acid 77-92-9 30 0.000528086 458.065
Acetic acid 64-19-7 5 0.00008801 76.344
Hydrochloric Acid (7.5%) Keane Acid Inhibitor Hydrochloric Acid 7647-01-0 7.5 0.0644647 55917.1
Water 7732-18-5 92.5 0.795064 689644
KFR-20 Keane Friction Reducer Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0170121 14756.4
copolymer of 2-propenamide 69418-26-4 30 0.0255181 22134.6
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00170121 1475.64
Water 7732-18-5 45 0.0382772 33201.9
oleic acid diethanolamide 93-83-4 2 0.00170121 1475.64
ammonium chloride 12125-02-9 1 0.000850604 737.82
KAI-12 Keane Acid Inhibitor Fatty imidazoline 61790-69-0 5 0.000182609 158.396
xylene 1330-20-7 5 0.000182609 158.396
ethylbenzene 100-41-4 1 0.00003652 31.679
isoproyl alcohol 67-63-0 5 0.000182609 158.396
Methanol 67-56-1 90 0.00328697 2851.14
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.000182609 158.396
prop-2-yn-1-ol 107-19-7 5 0.000182609 158.396
KFR-23 Keane Friction Reducer copolymer of 2-propenamide 69418-26-4 20 0.000280826 243.591
Water 7732-18-5 50 0.000702066 608.976
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00002808 24.359
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.000280826 243.591
oleic acid diethanolamide 93-83-4 2 0.00002808 24.359
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 13.7325 11,911,600.0
Other Chemical(s) Listed Above See Trade Name(s) List Citric acid 77-92-9 30 0.000528086 458.065
xylene 1330-20-7 5 0.000182609 158.396
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.000280826 243.591
copolymer of 2-propenamide 69418-26-4 30 0.0255181 22134.6
Water 7732-18-5 92.5 0.795064 689644
ethylbenzene 100-41-4 1 0.00003652 31.679
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.000182609 158.396
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00002808 24.359
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0170121 14756.4
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00170121 1475.64
oleic acid diethanolamide 93-83-4 2 0.00170121 1475.64
ammonium chloride 12125-02-9 1 0.000850604 737.82
copolymer of 2-propenamide 69418-26-4 20 0.000280826 243.591
oleic acid diethanolamide 93-83-4 2 0.00002808 24.359
prop-2-yn-1-ol 107-19-7 5 0.000182609 158.396
isoproyl alcohol 67-63-0 5 0.000182609 158.396
Fatty imidazoline 61790-69-0 5 0.000182609 158.396

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 JKLM ENERGY LLC 0.00 0 0.00 0 0.00 0
2018 JKLM ENERGY LLC 908,154.00 113 0.00 0 0.00 0
2019 JKLM ENERGY LLC 273,404.00 82 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2017-M12 Drill Cuttings (in Tons) RWC 810 200.69 Tons LANDFILL 301358
2017-M12 Produced Fluid (in Barrels) RWC 802 65.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2017-M12 Produced Fluid (in Barrels) RWC 802 292.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-M01 Drill Cuttings (in Tons) RWC 810 332.00 Tons LANDFILL 301358
2018-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 8.00 Bbl REUSE (AT WELL PAD)
2018-M01 Produced Fluid (in Barrels) RWC 802 98.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-M01 Synthetic Liner Materials (in Tons) RWC 806 3.00 Tons LANDFILL 301358
2018-M02 Drill Cuttings (in Tons) RWC 810 294.20 Tons LANDFILL 301358
2018-M02 Produced Fluid (in Barrels) RWC 802 90.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-M02 Produced Fluid (in Barrels) RWC 802 135.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-M03 Drill Cuttings (in Tons) RWC 810 574.70 Tons LANDFILL 301358
2018-M03 Produced Fluid (in Barrels) RWC 802 307.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-M04 Drill Cuttings (in Tons) RWC 810 353.15 Tons LANDFILL 301358
2018-M04 Produced Fluid (in Barrels) RWC 802 705.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-M04 Synthetic Liner Materials (in Tons) RWC 806 1.48 Tons LANDFILL 301358
2018-M05 Synthetic Liner Materials (in Tons) RWC 806 0.77 Tons LANDFILL 301358
2018-M06 Synthetic Liner Materials (in Tons) RWC 806 0.75 Tons LANDFILL 301358
2018-M07 Produced Fluid (in Barrels) RWC 802 55.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-M07 Synthetic Liner Materials (in Tons) RWC 806 20.48 Tons LANDFILL 301358
2018-M08 Produced Fluid (in Barrels) RWC 802 412.50 Bbl REUSE (AT WELL PAD)
2018-M08 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 5.49 Tons LANDFILL 301358
2018-M08 Waste Water Treatment Sludge (in Tons) RWC 804 32.53 Tons LANDFILL 301358
2018-M09 Other Oil & Gas Wastes (in Barrels) RWC 899 32.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018-M09 Other Oil & Gas Wastes (in Barrels) RWC 899 88.98 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-M09 Produced Fluid (in Barrels) RWC 802 66.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018-M09 Produced Fluid (in Barrels) RWC 802 92.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-M09 Produced Fluid (in Barrels) RWC 802 653.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-M09 Produced Fluid (in Barrels) RWC 802 6,900.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-M10 Produced Fluid (in Barrels) RWC 802 521.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018-M10 Produced Fluid (in Barrels) RWC 802 330.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-M10 Produced Fluid (in Barrels) RWC 802 20,537.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-M11 Produced Fluid (in Barrels) RWC 802 2,757.72 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018-M11 Produced Fluid (in Barrels) RWC 802 890.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-M11 Produced Fluid (in Barrels) RWC 802 6,560.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-M11 Produced Fluid (in Barrels) RWC 802 522.50 Bbl REUSE (AT WELL PAD)
2018-M11 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 46.82 Tons LANDFILL 301358
2018-M12 Produced Fluid (in Barrels) RWC 802 3,874.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-M12 Produced Fluid (in Barrels) RWC 802 3,187.50 Bbl REUSE (AT WELL PAD)
2019-M01 Produced Fluid (in Barrels) RWC 802 142.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2019-M01 Produced Fluid (in Barrels) RWC 802 357.50 Bbl REUSE (AT WELL PAD)
2019-M01 Produced Fluid (in Tons) RWC 802 1.80 Tons LANDFILL 301358
2019-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 32.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 150.00 Bbl REUSE (AT WELL PAD)
2019-M02 Produced Fluid (in Barrels) RWC 802 220.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019-M02 Produced Fluid (in Barrels) RWC 802 3,287.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019-M02 Produced Fluid (in Barrels) RWC 802 5,912.50 Bbl REUSE (AT WELL PAD)
2019-M02 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 2.65 Tons LANDFILL 301358
2019-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 515.00 Bbl REUSE (AT WELL PAD)
2019-M03 Produced Fluid (in Barrels) RWC 802 31.25 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019-M03 Produced Fluid (in Barrels) RWC 802 27.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019-M03 Produced Fluid (in Barrels) RWC 802 787.97 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019-M03 Produced Fluid (in Barrels) RWC 802 140.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2019-M03 Produced Fluid (in Barrels) RWC 802 2,075.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019-M03 Produced Fluid (in Barrels) RWC 802 262.50 Bbl REUSE (AT WELL PAD)
2019-M03 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 11.17 Tons LANDFILL 301358

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2617046 Primary Facility 2017-07-18 Routine/Partial Inspection No Violations Noted On 7/18/17 at 1323 hrs I attended a preconstruction meeting for the Sweden Valley 107 well site. JKLM representatives, Jeff Long and John Manuel, and J.L. Watts representative, John Watts, were present. CB&I developed the Erosion and Sediment (E&S) control plan and J.L. Watts is the construction contractor.

We reviewed the E&S drawing. Site drainage is to an unnamed tributary to Nelson Run, which is designated as a High Quality stream. A majority of the access road was constructed under the Sweden Valley 106 ESCGP. The access road for the 107 pad will come off the existing access road and is 200 feet in length. The site will consist of a well pad (350 feet x 500 feet) and a sediment basin located off the northwest corner of the pad. The pad will be soil cemented for stability. The E&S drawing shows that a wash rack is to be installed on the access road. JKLM would prefer to install an additional 50 feet of rock constructed entrance in lieu of the wash rack; this is an acceptable alternative when a sediment

2633715 Primary Facility 2017-09-06 Preoperation Inspection No Violations Noted On 9/6/17 at 0938 hrs I conducted a preoperational inspection at the Sweden Valley 107 well site. It was mostly cloudy and 61 degrees F.

I observed the site and the routine Erosion and Sediment (E&S) control inspection log. Earth disturbance is complete. The pad surface and access road will be soil cemented and rocked within the next week or so. E&S controls are installed and disturbed areas have been stabilized with seed and mulch or erosion control blanket; seed has germinated in some areas.

Cellars have not yet been installed. Well permits for the Sweden Valley 107 1HU, 2HU, 3HM and 4HB have been issued.

The last routine E&S inspection was conducted on 8/30/17. No violations are cited during this inspection. I concluded the inspection at 1052 hrs. TLT

2650322 Primary Facility 2017-10-19 Routine/Complete Inspection No Violations Noted Well was drilled and cemented on 10-13-17. Well is conductor only. This well as well as 105-21896 are utica formation wells. The producing formation choice in this inspection format did not allow me to make that choice when submitting this or the inspection for 105-21896.
2695944 Primary Facility 2018-02-15 Routine/Complete Inspection No Violations Noted The Department of Environmental Protection (DEP) inspected the JKLM Sweden Valley 107 well pad located in Sweden Twp., Potter Co. on 2/15/2018 @1300 hours. The weather was 48 degrees and sunny causing accumulated snow to melt and the pad surface and access road to be very wet/muddy. JKLM representatives Jon Manuel and Ron Hall were present for my inspection. The H&P 500 flex rig is onsite and is currently drilling the 1HU well. The rig was at a depth of 11,474’ feet at the time of my inspection. Mr. Hall stated no issues have been encountered. The rig will be drilling 4 wells while onsite the 1HU, 2HU, 3HM and 4HB. Fluid was observed accumulating along the eastern side of the pad-wide containment. Fluid in containment had a field measured conductivity of between 6.82 mS/cm and 8.28 mS/cm. A puddle on the ground surface approximately 1-2 feet off the edge of containment had an elevated conductivity of 7.23 mS/cm. Additional screening of the surrounding area showed the elevated area to be isolated. A vac truck
2719485 Primary Facility 2018-04-17 Routine/Complete Inspection No Violations Noted At the time of this inspection the drilling of this well was complete and the drilling rig was rigging down and being moved.
2730072 Primary Facility 2018-05-15 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of the JKLM-Sweden Valley 107 well pad located in Sweden Township, Potter County. The weather was 77° mostly cloudy with severe thunderstorms in the area, winds W 12 mph, 61% humidity. Chris Wiley, JKLM was present onsite.

JKLM was preparing to frack the 1HU, 2HU, 3HU and 4 HB with contractor Keane Frack. Mr. Wiley stated they were hoping to begin fracking later this afternoon. The onsite AST, containment and E&S controls were observed. No puddles or staining was observed around the AST. All duckponds observed appeared dry. All observed puddles, on the pads surface, were measured for field conductivity and found to be within normal range. Rain water was accumulating inside the northern edge of the primary containment. Mr. Wiley was informed of the finding. Due to severe thunderstorms and the potential for heavy precipitation, storage capacity of primary containment should be monitored.

A sheen and bubbles/foam were observed in water standing in the E&S channels in th

2735222 Primary Facility 2018-05-30 Routine/Complete Inspection No Violations Noted At the time of this inspection the 1 HU was complete and the 4 HB was being fractured
2738165 Primary Facility 2018-06-06 Routine/Complete Inspection No Violations Noted The 1HU had completed all 26 stages at the time of this inspection.
2740709 Primary Facility 2018-06-06 Routine/Complete Inspection No Violations Noted The DEP conducted an INCDENT inspection of the JKLM – Sweden Valley 107 well pad located in Sweden Twp., Potter Co. @ 1045 hours on 6/6/2018 in response to spill#334721 reported to the DEP on 6/5/2018 @1534 hours. The weather was 58 degrees and overcast.

A representative from JKLM contractor Whipper Hill Consulting was onsite conducting a grid screening of the impacted area. The following information was provided.

On 6/5/2018, sometime between 1000 – 1330 hours, a contractor punctured the pad-wide containment beneath the sand boxes located along the northern edge of containment. An unknown volume of fluid exhibiting an elevated conductivity flowed to the northern edge of containment, thought to be the “low spot”, where it exited the puncture causing a puddle to form outside of containment. The representative stated the puddle had a field measured conductivity of >20mS/cm. A vacuum truck was dispatched to remove the standing liquid from the pad surface.

The initial soil conductivity of the saturated pad s

2745354 Primary Facility 2018-06-25 Routine/Complete Inspection No Violations Noted At the time of this inspection the hydraulic fracturing of this well was complete.
2782160 Primary Facility 2018-10-01 Routine/Complete Inspection Pending The DEP conducted a routine inspection of the JKLM - Sweden Valley 107 well pad located in Sweden Twp., Potter Co. on 10/1/2018 @1240 hours. DEP Env Trainee, was present onsite for the inspection. The weather was 73 degrees, partly sunny.

Company personnel onsite appeared to be repairing a dehydration unit that had sprayed glycol onto the pad surface on 9/28/2018. The glycol release was below the reportable limit (but had been reported to the DEP), and appeared remediated by the time of this inspection.

The pad surface appeared very wet and muddy around the well heads, AST and main traffic areas. Puddles on the pad surface, near the production tanks, tested for field conductivity with an Oakton Multi-Parameter PCTestr and a Groline soil conductivity meter measured ~1000 uS/cm.

A number of flowback tanks were arranged, on secondary containment, along the eastern side of the pad. Standing fluid in the secondary containment had a field measured conductivity of "Over Range" or >20.00mS/cm. A large wet/damp

2795447 Primary Facility 2018-10-29 Administrative/File Review Violation(s) Noted An Administrative inspection was conducted 10/29/2018 in response to receipt of results from sample 4427-170 dated 10/1/2018, referenced in IR#2783174.

The sample was collected from high conductivity fluid located on the pad surface, outside of containment. The sample results show elevated levels of barium, strontium and chlorides. These results are consistent with the release of a pollutional substance to the pad surface.

Please reference IR#2783174, dated 10/1/2018 for addtional information. Violations of the following regulations are cited against the 1HU, API#105-21883 permit at this time. 35 PS 691.402 Potential to pollute water of the Commonwealth, 25 Pa Code 78a.56(a) Temporary Storage 35 PS SWMA 301

2802122 Primary Facility 2018-11-13 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was drilled,stimulated, flow-backed and was in production status. Flow-back is done before well is put into production as part of production preparation. The pressure reading on a mechanical gauge on this well at this inspection was 1700 pounds per square inch. Flow- back was started on 9/12/18 and completed on 10/23/18. No violations were noted at this inspection.
2820215 Primary Facility 2018-12-20 Routine/Complete Inspection Outstanding Violations - Viols Req'd The DEP conducted a routine inspection of the JKLM Sweden Valley 107 well pad located in Sweden Twp, Potter Co on 12/20/2018 @1230 hours. The weather was overcast, 34 degrees.

The well pad is currently setup for flowback/production. Personnel were present onsite to monitor transfers from/to the Aboveground Storage Tank (AST). A temporary fluid line was observed connecting the production tanks to the AST, but did not appear to be in use. Fluid with a field measured conductivity of "Over Range" or >19.99 mS/cm was observed in the production tank containment. Puddles screened on the pad surface measured <1000uS/cm.

Violations from an inspection dated 10/29/2018, remain outstanding at this site from a previous release. Site remediation has been performed and a Remediation Action Completion Report has been submitted to DEP’s Environmental Cleanups and Brownfields program for review. The outstanding violations will be closed once attainment with Act 2 standards has be confirmed.

2820525 Primary Facility 2018-12-31 Administrative/File Review No Violations Noted On December 26, 2018 the Department of Environmental Protection's Environmental Cleanup in Brownfields program issued a state wide health final report approval letter. All violations and subsequent outstanding violations associated with this release or considered closed
2846822 Primary Facility 2019-02-28 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of the JKLM - Sweden Valley 107 Well Pad located in Sweden Twp, Potter Co. on 2/282019 @1230 hours. The weather was 23 degrees, sunny, winds N 4mph,63% humidity, 2-3" of snow deposited over the previous 24 hrs. The well pad appears to be setup for flowback/production. 4 wells were observed connected to sand traps and a gas buster. 17 orange roll-off tanks were observed on containment on the along the south side of the well pad.
2848027 Primary Facility 2019-03-05 Routine/Complete Inspection No Violations Noted At the time of this inspection this well was in production. There are three (3) annulus vents that are vented to surface. These annulus vents were checked for combustible gas on each annulus vent. Results of this testing were 0 LEL ( lower explosion limit) and 0 Methane on vent 18 x 13 and 0 LEL and 0 Methane on vent 13 x 9 and 0 LEL and 0 Methane on the 9 x 5. A gauge on the well showed a pressure of 1500 psi ( pounds per square inch ) . No violations were noted at this inspection.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2795447 831816 2018-10-29 2018-12-26 CSL 402(b) Environmental Health & Safety
2795447 831817 2018-10-29 2018-12-26 78.56(a) Environmental Health & Safety
2795447 831818 2018-10-29 2018-12-26 SWMA 301 Environmental Health & Safety
2820215 837515 2018-12-20 2018-12-26 CSL 402(b) Environmental Health & Safety
2820215 837516 2018-12-20 2018-12-26 78.56(a) Environmental Health & Safety
2820215 837517 2018-12-20 2018-12-26 SWMA 301 Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
831816 368769 NOV - Notice of Violation 2018-12-26
831817 368769 NOV - Notice of Violation 2018-12-26
831818 368769 NOV - Notice of Violation 2018-12-26

For data sources see[7]

References