X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-23823

Well Details

Well ID: 37-125-23823
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Amwell Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 149603
Farm/Lease Name: X-MAN 1
License Status: Active
Spud Date: 2009-09-17
Permit Date: 2009-08-05
Unconventional Well: Y
Configuration: Vertical Well
Latitude: 40.099358
Longitude: -80.179578

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 0.00 0 0.00 0 0.00 0
2010 RICE DRILLING B LLC 80,021.50 125 0.00 0 0.00 0
2011 RICE DRILLING B LLC 44,750.00 60 0.00 0 0.00 0
2012 RICE DRILLING B LLC 28,205.00 37 0.00 0 0.00 0
2013 RICE DRILLING B LLC 1,340.00 6 0.00 0 0.00 0
2014 RICE DRILLING B LLC 65,789.00 166 0.00 0 0.00 0
2015 RICE DRILLING B LLC 93,815.00 350 0.00 0 0.00 0
2016 RICE DRILLING B LLC 64,746.82 353 0.00 0 0.00 0
2017 RICE DRILLING B LLC 50,952.73 353 0.00 0 0.00 0
2018 RICE DRILLING B LLC 9,883.00 62 0.00 0 0.00 0
2019 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2009-A00 Drilling 1,691.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2010-A01 Drilling Fluid Waste (in Barrels) 2,500.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2010-A01 Fracing Fluid Waste (in Barrels) 5,250.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2010-A01 Produced Fluid (in Barrels) 4,600.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010-S01 Drilling Fluid Waste (in Barrels) 1,250.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2010-S01 Fracing Fluid Waste (in Barrels) 2,625.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 101674
2010-S01 Produced Fluid (in Barrels) 2,300.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010-S02 Basic Sediment (in Barrels) 360.40 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-S02 Drilling Fluid Waste (in Barrels) 3,776.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2010-S02 Fracing Fluid Waste (in Barrels) 12,460.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011-S01 Produced Fluid (in Barrels) 2,635.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2012-S02 Produced Fluid (in Barrels) 1,590.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Produced Fluid (in Barrels) 190.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014-S02 Produced Fluid (in Barrels) 1,413.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0254185
2014-S02 Produced Fluid (in Barrels) 18.00 Bbl INJECTION DISPOSAL WELL 34-013-20609
2014-S02 Produced Fluid (in Barrels) 747.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2014-S02 Produced Fluid (in Barrels) 32.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2015-S01 Fracturing Fluid Waste (in Tons) 2.42 Tons LANDFILL 100172
2015-S01 Fracturing Fluid Waste (in Tons) 10.94 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2015-S01 Produced Fluid (in Barrels) 4.17 Bbl INJECTION DISPOSAL WELL 34-013-20609
2015-S01 Produced Fluid (in Barrels) 73.33 Bbl INJECTION DISPOSAL WELL 34-157-25511
2015-S01 Produced Fluid (in Barrels) 887.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015-S01 Produced Fluid (in Barrels) 887.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW010
2015-S01 Produced Fluid (in Barrels) 3,165.83 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Fracing Fluid Waste (in Barrels) 87.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015-S02 Fracing Fluid Waste (in Barrels) 166.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Produced Fluid (in Barrels) 158.80 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015-S02 Produced Fluid (in Barrels) 3,652.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S02 Other Oil & Gas Wastes (in Barrels) RWC 899 77.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016-S02 Other Oil & Gas Wastes (in Barrels) RWC 899 16.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016-S02 Other Oil & Gas Wastes (in Barrels) RWC 899 241.04 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S02 Produced Fluid (in Barrels) RWC 802 76.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016-S02 Produced Fluid (in Barrels) RWC 802 207.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2016-S02 Produced Fluid (in Barrels) RWC 802 87.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016-S02 Produced Fluid (in Barrels) RWC 802 1,685.24 Bbl REUSE OTHER THAN ROAD SPREADING
2017-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 29.17 Bbl REUSE (AT WELL PAD)
2017-M01 Produced Fluid (in Barrels) RWC 802 46.46 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M01 Produced Fluid (in Barrels) RWC 802 19.42 Bbl REUSE (AT WELL PAD)
2017-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 43.89 Bbl REUSE (AT WELL PAD)
2017-M02 Produced Fluid (in Barrels) RWC 802 133.51 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017-M02 Produced Fluid (in Barrels) RWC 802 16.78 Bbl REUSE (AT WELL PAD)
2017-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 9.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 43.17 Bbl REUSE (AT WELL PAD)
2017-M03 Produced Fluid (in Barrels) RWC 802 12.37 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M03 Produced Fluid (in Barrels) RWC 802 86.12 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017-M03 Produced Fluid (in Barrels) RWC 802 231.06 Bbl REUSE (AT WELL PAD)
2017-M04 Other Oil & Gas Wastes (in Barrels) RWC 899 18.02 Bbl REUSE (AT WELL PAD)
2017-M04 Produced Fluid (in Barrels) RWC 802 33.37 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M04 Produced Fluid (in Barrels) RWC 802 162.71 Bbl REUSE (AT WELL PAD)
2017-M05 Other Oil & Gas Wastes (in Barrels) RWC 899 47.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M05 Other Oil & Gas Wastes (in Barrels) RWC 899 5.00 Bbl REUSE (AT WELL PAD)
2017-M05 Produced Fluid (in Barrels) RWC 802 221.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M05 Produced Fluid (in Barrels) RWC 802 17.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017-M05 Produced Fluid (in Barrels) RWC 802 49.59 Bbl REUSE (AT WELL PAD)
2017-M06 Other Oil & Gas Wastes (in Barrels) RWC 899 23.52 Bbl REUSE (AT WELL PAD)
2017-M06 Produced Fluid (in Barrels) RWC 802 17.45 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M06 Produced Fluid (in Barrels) RWC 802 268.63 Bbl REUSE (AT WELL PAD)
2017-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 8.70 Bbl REUSE (AT WELL PAD)
2017-M07 Produced Fluid (in Barrels) RWC 802 17.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M07 Produced Fluid (in Barrels) RWC 802 18.33 Bbl REUSE (AT WELL PAD)
2017-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 10.00 Bbl REUSE (AT WELL PAD)
2017-M08 Produced Fluid (in Barrels) RWC 802 18.33 Bbl REUSE (AT WELL PAD)
2017-M09 Produced Fluid (in Barrels) RWC 802 18.51 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M09 Produced Fluid (in Barrels) RWC 802 60.62 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017-M09 Produced Fluid (in Barrels) RWC 802 17.29 Bbl REUSE (AT WELL PAD)
2017-M11 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M11 Produced Fluid (in Barrels) RWC 802 37.31 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M11 Produced Fluid (in Barrels) RWC 802 54.38 Bbl REUSE (AT WELL PAD)
2017-M12 Produced Fluid (in Barrels) RWC 802 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M12 Produced Fluid (in Barrels) RWC 802 18.22 Bbl REUSE (AT WELL PAD)
2017-M12 Produced Fluid (in Barrels) RWC 802 18.33 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M01 Produced Fluid (in Barrels) RWC 802 7.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M01 Produced Fluid (in Barrels) RWC 802 4.83 Bbl REUSE (AT WELL PAD)
2018-M01 Produced Fluid (in Barrels) RWC 802 1.06 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 22.00 Bbl REUSE (AT WELL PAD)
2018-M02 Produced Fluid (in Barrels) RWC 802 2.89 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M02 Produced Fluid (in Barrels) RWC 802 26.00 Bbl REUSE (AT WELL PAD)
2018-M03 Produced Fluid (in Barrels) RWC 802 8.35 Bbl REUSE (AT WELL PAD)
2018-M03 Produced Fluid (in Barrels) RWC 802 2.78 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M06 Other Oil & Gas Wastes (in Barrels) RWC 899 22.00 Bbl REUSE (AT WELL PAD)
2018-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 18.33 Bbl REUSE (AT WELL PAD)
2018-M10 Other Oil & Gas Wastes (in Barrels) RWC 899 18.33 Bbl REUSE (AT WELL PAD)
2018-M11 Produced Fluid (in Barrels) RWC 802 0.01 Bbl REUSE (AT WELL PAD)
2018-M12 Other Oil & Gas Wastes (in Barrels) RWC 899 18.33 Bbl REUSE (AT WELL PAD)
2019-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 36.67 Bbl REUSE (AT WELL PAD)
2019-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 53.33 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1842248 Primary Facility 2009-09-23 Drilling/Alteration No Violations Noted TOP HOLE BY TARGET DRILLING. MARCELLUS VERTICLE.
1915510 Primary Facility 2010-09-08 Complaint Inspection Violation(s) Noted
1942034 Primary Facility 2010-10-13 Follow-up Inspection No Violations Noted
1942057 Primary Facility 2010-10-22 Follow-up Inspection No Violations Noted
2004045 Primary Facility 2011-08-09 Complaint Inspection No Violations Noted
2021917 Primary Facility 2011-10-19 Routine/Complete Inspection No Violations Noted
2063218 Primary Facility 2012-03-19 Complaint Inspection No Violations Noted
2147797 Primary Facility 2013-03-12 Routine/Complete Inspection No Violations Noted Checked paperwork and E&S controls. No violations recorded.
2165172 Primary Facility 2013-04-10 Follow-up Inspection No Violations Noted On April 10, 2013, I stopped at the X-man site for a follow-up inspection. I found the E&S controls in better condition than during my March 12th inspection; however, I still some concerns.
2178932 Primary Facility 2013-06-07 Follow-up Inspection No Violations Noted On June 7, 2013, I met with Tanya Winkler and Joe Mallow of Rice Energy at Rice’s X-Man site for a follow-up inspection.
2316842 Primary Facility 2014-10-29 Complaint Inspection No Violations Noted Drilling complete. Wells equipeed for production.
2716603 Primary Facility 2018-04-06 Routine/Complete Inspection No Violations Noted Well has been completed and is producing. Equipment on site appears to be well maintained.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1915510 595912 09/08/2010 2010-09-08 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith Administrative
1915510 595914 09/08/2010 2010-09-08 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
595912 262544 NOV - Notice of Violation Comply/Closed 2010-09-27
595912 264419 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-11-15 2010-11-15 $2,475.00 $2,475.00
595914 262544 NOV - Notice of Violation Comply/Closed 2010-09-27
595914 264419 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-11-15 2010-11-15 $2,475.00 $2,475.00

For data sources see[6]

References