If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-125-23823 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.099358,"lon":-80.179578,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Amwell Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 149603 | |
Farm/Lease Name: X-MAN 1 | |
License Status: Active | |
Spud Date: 2009-09-17 | |
Permit Date: 2009-08-05 | |
Unconventional Well: Y | |
Configuration: Vertical Well | |
Latitude: 40.099358 | |
Longitude: -80.179578 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | |
2010 | RICE DRILLING B LLC | 80,021.50 | 125 | 0.00 | 0 | 0.00 | 0 |
2011 | RICE DRILLING B LLC | 44,750.00 | 60 | 0.00 | 0 | 0.00 | 0 |
2012 | RICE DRILLING B LLC | 28,205.00 | 37 | 0.00 | 0 | 0.00 | 0 |
2013 | RICE DRILLING B LLC | 1,340.00 | 6 | 0.00 | 0 | 0.00 | 0 |
2014 | RICE DRILLING B LLC | 65,789.00 | 166 | 0.00 | 0 | 0.00 | 0 |
2015 | RICE DRILLING B LLC | 93,815.00 | 350 | 0.00 | 0 | 0.00 | 0 |
2016 | RICE DRILLING B LLC | 64,746.82 | 353 | 0.00 | 0 | 0.00 | 0 |
2017 | RICE DRILLING B LLC | 50,952.73 | 353 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 9,883.00 | 62 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2009-A00 | Drilling | 1,691.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0101508 |
2010-A01 | Drilling Fluid Waste (in Barrels) | 2,500.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2010-A01 | Fracing Fluid Waste (in Barrels) | 5,250.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2010-A01 | Produced Fluid (in Barrels) | 4,600.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010-S01 | Drilling Fluid Waste (in Barrels) | 1,250.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2010-S01 | Fracing Fluid Waste (in Barrels) | 2,625.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 101674 |
2010-S01 | Produced Fluid (in Barrels) | 2,300.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2010-S02 | Basic Sediment (in Barrels) | 360.40 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010-S02 | Drilling Fluid Waste (in Barrels) | 3,776.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2010-S02 | Fracing Fluid Waste (in Barrels) | 12,460.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011-S01 | Produced Fluid (in Barrels) | 2,635.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095443 |
2012-S02 | Produced Fluid (in Barrels) | 1,590.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S02 | Produced Fluid (in Barrels) | 190.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014-S02 | Produced Fluid (in Barrels) | 1,413.00 Bbl | CENT WASTE TRT FAC NPDES DISCHARGE | PA0254185 |
2014-S02 | Produced Fluid (in Barrels) | 18.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2014-S02 | Produced Fluid (in Barrels) | 747.00 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2014-S02 | Produced Fluid (in Barrels) | 32.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2015-S01 | Fracturing Fluid Waste (in Tons) | 2.42 Tons | LANDFILL | 100172 |
2015-S01 | Fracturing Fluid Waste (in Tons) | 10.94 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2015-S01 | Produced Fluid (in Barrels) | 4.17 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2015-S01 | Produced Fluid (in Barrels) | 73.33 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2015-S01 | Produced Fluid (in Barrels) | 887.67 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015-S01 | Produced Fluid (in Barrels) | 887.50 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW010 |
2015-S01 | Produced Fluid (in Barrels) | 3,165.83 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S02 | Fracing Fluid Waste (in Barrels) | 87.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015-S02 | Fracing Fluid Waste (in Barrels) | 166.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S02 | Produced Fluid (in Barrels) | 158.80 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW005 |
2015-S02 | Produced Fluid (in Barrels) | 3,652.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-S02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 77.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016-S02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 16.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016-S02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 241.04 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-S02 | Produced Fluid (in Barrels) RWC 802 | 76.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016-S02 | Produced Fluid (in Barrels) RWC 802 | 207.11 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2016-S02 | Produced Fluid (in Barrels) RWC 802 | 87.10 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2016-S02 | Produced Fluid (in Barrels) RWC 802 | 1,685.24 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017-M01 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 29.17 Bbl | REUSE (AT WELL PAD) | |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 46.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 19.42 Bbl | REUSE (AT WELL PAD) | |
2017-M02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 43.89 Bbl | REUSE (AT WELL PAD) | |
2017-M02 | Produced Fluid (in Barrels) RWC 802 | 133.51 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017-M02 | Produced Fluid (in Barrels) RWC 802 | 16.78 Bbl | REUSE (AT WELL PAD) | |
2017-M03 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 9.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M03 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 43.17 Bbl | REUSE (AT WELL PAD) | |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 12.37 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 86.12 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 231.06 Bbl | REUSE (AT WELL PAD) | |
2017-M04 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 18.02 Bbl | REUSE (AT WELL PAD) | |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 33.37 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 162.71 Bbl | REUSE (AT WELL PAD) | |
2017-M05 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 47.92 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M05 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 5.00 Bbl | REUSE (AT WELL PAD) | |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 221.91 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 17.59 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 49.59 Bbl | REUSE (AT WELL PAD) | |
2017-M06 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 23.52 Bbl | REUSE (AT WELL PAD) | |
2017-M06 | Produced Fluid (in Barrels) RWC 802 | 17.45 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M06 | Produced Fluid (in Barrels) RWC 802 | 268.63 Bbl | REUSE (AT WELL PAD) | |
2017-M07 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 8.70 Bbl | REUSE (AT WELL PAD) | |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 17.03 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 18.33 Bbl | REUSE (AT WELL PAD) | |
2017-M08 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 10.00 Bbl | REUSE (AT WELL PAD) | |
2017-M08 | Produced Fluid (in Barrels) RWC 802 | 18.33 Bbl | REUSE (AT WELL PAD) | |
2017-M09 | Produced Fluid (in Barrels) RWC 802 | 18.51 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M09 | Produced Fluid (in Barrels) RWC 802 | 60.62 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017-M09 | Produced Fluid (in Barrels) RWC 802 | 17.29 Bbl | REUSE (AT WELL PAD) | |
2017-M11 | Produced Fluid (in Barrels) RWC 802 | 36.67 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M11 | Produced Fluid (in Barrels) RWC 802 | 37.31 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M11 | Produced Fluid (in Barrels) RWC 802 | 54.38 Bbl | REUSE (AT WELL PAD) | |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 18.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 18.22 Bbl | REUSE (AT WELL PAD) | |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 18.33 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M01 | Produced Fluid (in Barrels) RWC 802 | 7.15 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-M01 | Produced Fluid (in Barrels) RWC 802 | 4.83 Bbl | REUSE (AT WELL PAD) | |
2018-M01 | Produced Fluid (in Barrels) RWC 802 | 1.06 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 22.00 Bbl | REUSE (AT WELL PAD) | |
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 2.89 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 26.00 Bbl | REUSE (AT WELL PAD) | |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 8.35 Bbl | REUSE (AT WELL PAD) | |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 2.78 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M06 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 22.00 Bbl | REUSE (AT WELL PAD) | |
2018-M08 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 18.33 Bbl | REUSE (AT WELL PAD) | |
2018-M10 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 18.33 Bbl | REUSE (AT WELL PAD) | |
2018-M11 | Produced Fluid (in Barrels) RWC 802 | 0.01 Bbl | REUSE (AT WELL PAD) | |
2018-M12 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 18.33 Bbl | REUSE (AT WELL PAD) | |
2019-M02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 36.67 Bbl | REUSE (AT WELL PAD) | |
2019-M03 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 53.33 Bbl | REUSE (AT WELL PAD) |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1842248 | Primary Facility | 2009-09-23 | Drilling/Alteration | No Violations Noted | TOP HOLE BY TARGET DRILLING. MARCELLUS VERTICLE. |
1915510 | Primary Facility | 2010-09-08 | Complaint Inspection | Violation(s) Noted | |
1942034 | Primary Facility | 2010-10-13 | Follow-up Inspection | No Violations Noted | |
1942057 | Primary Facility | 2010-10-22 | Follow-up Inspection | No Violations Noted | |
2004045 | Primary Facility | 2011-08-09 | Complaint Inspection | No Violations Noted | |
2021917 | Primary Facility | 2011-10-19 | Routine/Complete Inspection | No Violations Noted | |
2063218 | Primary Facility | 2012-03-19 | Complaint Inspection | No Violations Noted | |
2147797 | Primary Facility | 2013-03-12 | Routine/Complete Inspection | No Violations Noted | Checked paperwork and E&S controls. No violations recorded. |
2165172 | Primary Facility | 2013-04-10 | Follow-up Inspection | No Violations Noted | On April 10, 2013, I stopped at the X-man site for a follow-up inspection. I found the E&S controls in better condition than during my March 12th inspection; however, I still some concerns. |
2178932 | Primary Facility | 2013-06-07 | Follow-up Inspection | No Violations Noted | On June 7, 2013, I met with Tanya Winkler and Joe Mallow of Rice Energy at Rice’s X-Man site for a follow-up inspection. |
2316842 | Primary Facility | 2014-10-29 | Complaint Inspection | No Violations Noted | Drilling complete. Wells equipeed for production. |
2716603 | Primary Facility | 2018-04-06 | Routine/Complete Inspection | No Violations Noted | Well has been completed and is producing. Equipment on site appears to be well maintained. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1915510 | 595912 | 09/08/2010 | 2010-09-08 | 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith | Administrative | |
1915510 | 595914 | 09/08/2010 | 2010-09-08 | 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
595912 | 262544 | NOV - Notice of Violation | Comply/Closed | 2010-09-27 | |||
595912 | 264419 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-11-15 | 2010-11-15 | $2,475.00 | $2,475.00 |
595914 | 262544 | NOV - Notice of Violation | Comply/Closed | 2010-09-27 | |||
595914 | 264419 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2010-11-15 | 2010-11-15 | $2,475.00 | $2,475.00 |
For data sources see[6]