X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-27023

Well Details

Well ID: 37-125-27023
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Amwell Township
Operator Name: EQT PROD CO
Well Pad ID: 145547
Farm/Lease Name: GALLAGHER 592053
License Status: Active
Spud Date: 2013-08-02
Permit Date: 2013-05-10
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.010939
Longitude: -80.217044

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-12-10 2013-12-13 7597 4,304,110.0 199556

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 28% HCL Halliburton Dissolves cement & minerals in perforations Hydrochloric Acid 7647-01-0 28 0.02255 0
MC MX 5 Halliburton Eliminates bacteria in water sources Sodium Nitrate 7631-99-4 60 0.05812 0
SP Breaker Halliburton Reduces viscosity of the fluid Sodium Persulfate 7775-27-1 100 0.00006000 0
Water Halliburton Carrier Water 7732-18-5 100 89.2454 0
LP-65 Halliburton Prevents scale deposits Ammonium chloride 12125-02-9 10 0.0026 0
Sand Halliburton Proppant Crystalline Silica 14808-60-7 100 10.5063 0
BA-40L Halliburton Adjusts pH of the fluid Potassium Carbonate 584-08-7 60 0.00714 0
LGC-36 Halliburton Adds viscosity to fluid Guar Gum 9000-30-0 30 0.00002000 0
Naptha, hydrotreated heavy 67742-48-9 30 0.00002000 0
HAI-OS Halliburton Protects Casing Methanol 65-56-1 60 0.00017 0
Propargyl Alcohol 107-19-7 10 0.00003000 0
FR-66 Halliburton Reduces friction between pipe and fluid Hydrotreated light petroleum distillate
(non-diesel, BTEX free)
64742-47-8 30 0.02568 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 EQT PROD CO 0.00 0 0.00 0 0.00 0
2014 EQT PROD CO 1,384,444.00 248 0.00 0 0.00 0
2015 EQT PROD CO 759,744.00 336 0.00 0 0.00 0
2016 EQT PROD CO 459,489.00 366 0.00 0 0.00 0
2017 EQT PROD CO 341,254.00 365 0.00 0 0.00 0
2018 EQT PROD CO 252,014.00 351 0.00 0 0.00 0
2019 EQT PROD CO 42,473.00 85 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2013-S02 Drilling Fluid Waste (in Barrels) 1,850.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Fracing Fluid Waste (in Barrels) 32,220.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Fracing Fluid Waste (in Barrels) 350.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Fracturing Fluid Waste (in Tons) 18.36 Tons LANDFILL 100419
2014-S01 Fracturing Fluid Waste (in Tons) 36.66 Tons LANDFILL SWF 1032-WV0109
2014-S01 Produced Fluid (in Barrels) 369.00 Bbl INJECTION DISPOSAL WELL 34-059-24202
2014-S01 Produced Fluid (in Barrels) 6,370.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Produced Fluid (in Barrels) 771.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2014-S02 Produced Fluid (in Barrels) 280.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2014-S02 Produced Fluid (in Barrels) 220.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014-S02 Produced Fluid (in Barrels) 7,362.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Produced Fluid (in Barrels) 64.00 Bbl INJECTION DISPOSAL WELL 34-031-27177
2015-S01 Produced Fluid (in Barrels) 180.00 Bbl INJECTION DISPOSAL WELL 34-157-25511
2015-S01 Produced Fluid (in Barrels) 2,266.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Produced Fluid (in Barrels) 4,950.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Produced Fluid (in Barrels) RWC 802 110.00 Bbl INJECTION DISPOSAL WELL 34-167-2-9543
2016-S01 Produced Fluid (in Barrels) RWC 802 160.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-S01 Produced Fluid (in Barrels) RWC 802 4,219.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S02 Produced Fluid (in Barrels) RWC 802 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016-S02 Produced Fluid (in Barrels) RWC 802 100.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2016-S02 Produced Fluid (in Barrels) RWC 802 3,768.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 100.00 Bbl REUSE (AT WELL PAD)
2017-M01 Produced Fluid (in Barrels) RWC 802 220.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M01 Produced Fluid (in Barrels) RWC 802 110.00 Bbl REUSE (AT WELL PAD)
2017-M02 Produced Fluid (in Barrels) RWC 802 310.00 Bbl REUSE (AT WELL PAD)
2017-M03 Produced Fluid (in Barrels) RWC 802 110.00 Bbl REUSE (AT WELL PAD)
2017-M04 Produced Fluid (in Barrels) RWC 802 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M04 Produced Fluid (in Barrels) RWC 802 770.00 Bbl REUSE (AT WELL PAD)
2017-M05 Produced Fluid (in Barrels) RWC 802 65.00 Bbl REUSE (AT WELL PAD)
2017-M06 Produced Fluid (in Barrels) RWC 802 130.00 Bbl REUSE (AT WELL PAD)
2017-M07 Produced Fluid (in Barrels) RWC 802 390.00 Bbl REUSE (AT WELL PAD)
2017-M08 Produced Fluid (in Barrels) RWC 802 65.00 Bbl REUSE (AT WELL PAD)
2017-M09 Produced Fluid (in Barrels) RWC 802 65.00 Bbl REUSE (AT WELL PAD)
2017-M10 Produced Fluid (in Barrels) RWC 802 260.00 Bbl REUSE (AT WELL PAD)
2017-M11 Produced Fluid (in Barrels) RWC 802 65.00 Bbl REUSE (AT WELL PAD)
2017-M12 Produced Fluid (in Barrels) RWC 802 130.00 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M01 Produced Fluid (in Barrels) RWC 802 260.00 Bbl REUSE (AT WELL PAD)
2018-M02 Produced Fluid (in Barrels) RWC 802 4.13 Bbl INJECTION DISPOSAL WELL 34-009-23823
2018-M02 Produced Fluid (in Barrels) RWC 802 16.53 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M02 Produced Fluid (in Barrels) RWC 802 24.80 Bbl REUSE (AT WELL PAD)
2018-M03 Produced Fluid (in Barrels) RWC 802 4.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M03 Produced Fluid (in Barrels) RWC 802 8.08 Bbl REUSE (AT WELL PAD)
2018-M04 Produced Fluid (in Barrels) RWC 802 3.49 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M04 Produced Fluid (in Barrels) RWC 802 9.08 Bbl REUSE (AT WELL PAD)
2018-M05 Produced Fluid (in Barrels) RWC 802 6.09 Bbl REUSE (AT WELL PAD)
2018-M06 Other Oil & Gas Wastes (in Barrels) RWC 899 6.88 Bbl REUSE (AT WELL PAD)
2018-M06 Produced Fluid (in Barrels) RWC 802 11.53 Bbl REUSE (AT WELL PAD)
2018-M07 Produced Fluid (in Barrels) RWC 802 8.08 Bbl REUSE (AT WELL PAD)
2018-M08 Produced Fluid (in Barrels) RWC 802 8.75 Bbl REUSE (AT WELL PAD)
2018-M09 Produced Fluid (in Barrels) RWC 802 20.29 Bbl REUSE (AT WELL PAD)
2018-M10 Other Oil & Gas Wastes (in Barrels) RWC 899 8.13 Bbl REUSE (AT WELL PAD)
2018-M10 Produced Fluid (in Barrels) RWC 802 3.88 Bbl REUSE (AT WELL PAD)
2018-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 8.13 Bbl REUSE (AT WELL PAD)
2018-M11 Produced Fluid (in Barrels) RWC 802 24.67 Bbl REUSE (AT WELL PAD)
2018-M12 Other Oil & Gas Wastes (in Barrels) RWC 899 8.13 Bbl REUSE (AT WELL PAD)
2018-M12 Produced Fluid (in Barrels) RWC 802 8.34 Bbl REUSE (AT WELL PAD)
2019-M01 Produced Fluid (in Barrels) RWC 802 122.85 Bbl REUSE (AT WELL PAD)
2019-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 6.88 Bbl INJECTION DISPOSAL WELL 34-105-23619
2019-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 7.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 6.88 Bbl REUSE (AT WELL PAD)
2019-M02 Produced Fluid (in Barrels) RWC 802 21.20 Bbl INJECTION DISPOSAL WELL 34-105-23619
2019-M02 Produced Fluid (in Barrels) RWC 802 31.80 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 34.38 Bbl REUSE (AT WELL PAD)
2019-M03 Produced Fluid (in Barrels) RWC 802 30.73 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2196445 Primary Facility 2013-08-08 Drilling/Alteration No Violations Noted
2199735 Primary Facility 2013-08-01 Routine/Complete Inspection No Violations Noted On August 1, 2013 I stopped at EQT’s Gallagher site for a perimeter BMP inspection; I met with Rex Nelson the Construction Supervisor.
2286962 Primary Facility 2014-05-19 Routine/Complete Inspection No Violations Noted
2562943 Primary Facility 2017-02-10 Routine/Complete Inspection No Violations Noted Routine/complete inspection

For data sources see[7]

References