If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24615 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.912750768,"lon":-81.37131887,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Wayne Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-001429 | |
Farm/Lease Name: QUINN UNIT | |
License Status: Producing | |
License Date: 2017-04-03 | |
Spud Date: 2017-04-20 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2017-07-01 | |
Well Total Depth: 17582 ft | |
Configuration: Horizontal | |
Latitude: 39.912750768 | |
Longitude: -81.37131887 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-01-17 | Proposed Formations:POINT PLEASANT, Issued Date:1/17/2017, Expired Date:1/17/2019 12:00:00 PM, Drilling unit acres:996.253, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2017-04-03 | Proposed Formations:POINT PLEASANT, Issued Date:4/3/2017, Expired Date:4/3/2019 12:00:00 PM, Drilling unit acres:973.346, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-07-01 | OP REQUEST ONE YEAR CONF REQUEST ALL LOGS-ALE |
Correction to Well | 2017-10-20 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
Completion Report Received | 2018-06-14 | OP REQUEST ONE YEAR CONF REQUEST ALL LOGS-ALE |
Record Last Modified | 2018-06-21 | OP REQUEST ONE YEAR CONF REQUEST ALL LOGS-ALE |
Construction Permit Expires | 2019-04-03 | OP REQUEST ONE YEAR CONF REQUEST ALL LOGS-ALE |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-06-20 | 7901 | 8071 | 5 |
2018-06-20 | 17377 | 17480 | 5 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 12/14/2017 | 12/29/2017 | 7658 | 14,793,700.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HCL Acid (12.6%-17.5%) | U.S. Well Services, LLC | Bulk Acid | Water | 7732-18-5 | 87.4 | 0.142509 | 203892 |
Hydrogen Chloride | 7647-01-0 | 17.5 | 0.033133 | 47404.6 | ||||
SI-1200 | U.S. Well Services, LLC | Scale Inhibitor | Proprietary Scale Inhibitor | Proprietary | 10 | 0.001796 | 2569.9 | |
Ethylene Glycol | 107-21-1 | 40 | 0.006715 | 9607.75 | ||||
LGC-15 | U.S. Well Services, LLC | Gelling Agents | Surfactant | 68439-51-0 | 3 | 0.002951 | 4222.09 | |
Petroleum Distillates | 64742-47-8 | 60 | 0.04658 | 66642.9 | ||||
Guar Gum | 9000-30-0 | 50 | 0.049183 | 70368.2 | ||||
Suspending agent (solid) | 14808-60-7 | 3 | 0.007522 | 10762.2 | ||||
AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.001841 | 2634 | |
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 13.4253 | 19,208,100.0 | |
WFRA-405 | U.S. Well Services, LLC | Friction Reducer | 2-Propenoic acid, polymer with 2 propenamide | 9003-06-9 | 30 | 0.022522 | 32223.3 | |
Hydrated light distillate (petroleum) | 64742-47-8 | 30 | 0.01813 | 25939.7 | ||||
Bioclear 2000 | U.S. Well Services, LLC | Anti-Bacterial Agent | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.004118 | 5891.19 | |
Deionized Water | 7732-18-5 | 28 | 0.002352 | 3365.02 | ||||
Water | Antero Resources | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.2352 | 123,379,000.0 | |
AI-303 | U.S. Well Services, LLC | Acid Corrosion Inhibitors | Acetophenone,thiourea,formaldehyde polymer | 68527-49-1 | 5 | 0.00000400 | 5.838 | |
Polyether | 60828-78-6 | 10 | 0.00000800 | 11.676 | ||||
Butyl cellosolve | 111-76-2 | 20 | 0.00001500 | 21.0402 | ||||
Cinnamaldehyde | 104-55-2 | 20 | 0.00001700 | 24.146 | ||||
Ethylene glycol | 107-21-1 | 40 | 0.00004700 | 66.7867 | ||||
Formic acid | 64-18-6 | 20 | 0.00001600 | 23.352 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2017-12-29 | H2O | 15 | 6892 Bbl | 40074 | US Well Services Inc | STAGE 48/48
STAGES 2-47 SEE IMAGES |
2017-12-14 | H2O | 15 | 4289 Bbl | 249684 | US Well Services Inc | STAGE 1/48
STAGES 2-47 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ANTERO RESOURCES CORPORATION | 1597266 | 105507 | 245 |
2019 | ANTERO RESOURCES CORPORATION | 411497 | 13860 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | ANTERO RESOURCES CORPORATION | Brine | 29306 | 245 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 7786 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1497775009 | 2017-06-18 | Drill / Deepen / Reopen | No Violations | On site inspection at 4:00 am on 06/18/2017 to witness the surface casing cement job with H&P Drilling rig 519 and Schlumberger Cement Service. The rig has drilled a 24 diameter surface borehole to a measured depth of 403 off of a rig Kelly bushing height of 30. The rig has inserted 18.625 diameter casing into the well bore to a measured depth of 391 with a casing guide shoe and float collar ran along with 5 casing centralizers. The casing was ran to bottom dry. Schlumberger Cement Service cemented the casing by first pumping 220 barrels of fresh water to establish circulation followed by 30 barrels of 6% fresh water gel spacer proceeded by a 130 barrel cement mix consisting of 610 sacks of class A cement mix. The cement slurry weight was confirmed by weight of scale. The cement was displaced with 106 barrels of fresh water with cement returns witnessed to surface at 75 barrels into displacement and the casing pressure tested to 850 psi upon the landing of the cement plug. The casing floats held. |
1497878235 | 2017-06-19 | Drill / Deepen / Reopen | No Violations | |
1508499004 | 2017-10-19 | Preliminary Restoration | No Violations | The purpose of my inspection was a status check on a preliminary restoration. The pad is named Andes and it consists of 5 wells. During my inspection the lease road was paved with an asphalt surface and the well pad had a gravel surface surrounded by a berm. There were not any erosion issues within the wellsite boundary. Contactors were on location setting up the production equipment. Location has met Preliminary Restoration Requirements listed within 1509.072 (A). |
1513261710 | 2017-12-11 | Completion Testing | No Violations | The purpose of my inspection was a status check on hydraulic stimulation operations. During my inspection I witnessed US Well Services setting up on location. The well was equipped with a frac stack and goat head flange style wellhead. I received an email from the Antero stating that they will be finishing rigging up this week. |
1522011974 | 2018-03-25 | Completion Testing | No Violations | Status check inspection on the well completion process found the well drilling -stimulation and completion process is now complete. A service rig is on location owned by Fortis Energy and is working on the Quinn 2-H well. The said well has 2.375 N-80 production tubing set to a depth of 7,825. The well was stimulated between the depths of 17,357 and 7900. Falcon Flow back service company is on location and is monitoring the annular pressure on the said well every 2 hours while completion operations are being conducted on all 5 wells that are present on the well pad. The said well has no reported annular pressure. |
1631550396 | 2017-04-20 | Casing String Witnessed | No Violations | The purpose of my inspection was to witness 100 feet of the 26 inch diameter conductor being cemented in a 30 inch diameter hole that is 100 feet in depth. Express Energy Services drilled the conductor with a rotary rig and auger bit. No water was encountered during the drilling process. During my inspection Express Energy Services was on location to complete the cement operations. Job calculations were discussed with Express and Antero Company Man. A pre job safety meeting was held with all personnel on location. I witnessed Express pump fresh water and gel ahead of 330 sacks of class A cement with 2% gel, displaced with 55.74 barrels of fresh water, and cement returns were established. The cellar floor was cemented making the depth of the cellar 6 feet. |
1697566943 | 2018-05-23 | Production Wells | No Violations | Status check inspection found a total of 5 wells on the well pad. Each well has had the drilling and completion process complete and is in the initial production stages. The wells are being produced through choke manifolds and sand traps with a 3rd party flow back contractor on site monitoring the initial production process. All well bore annulis were monitored through the completion stages and the wells do have flow lines valves and monitoring points on the 13.375 and 9.625 well head sections. There is a total of 5 glycol heaters on site. Also present on the East side of the well pad is a production fluid tank farm consisting of a total of 14 steel tanks of 400 barrels fluid capacity each, the tanks are situated inside a polymer lined steel containment dike area with the well ad perimeter berm serving as the primary containment with the perimeter drain valves closed. Multiple tank trucks were on site hauling both production fluid and water. |
For data sources see[10]