If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-105-21995 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.0624269,"lon":-82.08161561,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Meigs | |
Municipality: Salisbury Township | |
Operator Name: J D DRILLING COMPANY | |
Well Pad ID: | |
Farm/Lease Name: FEENEY-BENNETT POST #128 {ERP#7} | |
License Status: Final Restoration | |
License Date: 2014-04-11 | |
Spud Date: 1984-02-01 | |
Spud Drilling Contractor: CO TOOLS | |
Final Drill Date: 1984-02-17 | |
Well Total Depth: 1865 ft | |
Configuration: Vertical | |
Latitude: 39.062426900 | |
Longitude: -82.08161561 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1980-10-16 | 116 J D DRILLING CO GeoDate 10/16/80 |
CO | 1984-01-30 | 116 J D DRILLING CO GeoDate 1/30/84 |
Enhanced Recovery | 1984-01-30 | Issued Date 1/30/84 Expired Date 7/28/84 Acres 0121250 Tool Type NT Proposed Formation BEREA Proposed Depth 01865 Proposed Drill Depth 01865 |
Original Spud | 1984-02-01 | |
Completed | 1984-02-17 | |
Reached Total Depth | 1984-02-17 | |
First Injection | 1984-03-03 | |
Completion Report Received | 1984-06-08 | |
CO | 1985-12-17 | 116 J D DRILLING CO GeoDate 12/17/85 |
Unknown | 1985-12-17 | Issued Date 12/17/85 Expired Date 12/17/86 Proposed Purpose OG Was Plug Supervised Who Superivsed Plug and Abandon Date |
Annulus Pressure Monitoring Approved | 1989-06-06 | |
CO | 1994-05-02 | 4807 OHIO BEAR INC GeoDate 12/17/85 |
CO | 1996-07-05 | 116 J D DRILLING CO GeoDate 12/17/85 |
Last Compliance Report | 2012-10-24 | |
APP | 2014-04-11 | Proposed Formations:BEREA, Issued Date:4/11/2014, Expired Date:4/10/2016 12:00:00 PM, Drilling unit acres:121.25, Proposed Well Type:OIL, Proposed Well Class:ERP |
Plugged/Abandoned | 2014-04-24 | |
Construction Permit Expires | 2016-04-10 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2000-05-25 | 1704 | 1712 | 1 |
2000-05-25 | 1773 | 1777 | 1 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1700 Bbl | 0 | FRAC;H2O | ||
0 | 0 | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | J D DRILLING COMPANY | 171 | 0 | 365 |
2016 | J D DRILLING COMPANY | 0 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | J D DRILLING COMPANY | Brine | 0 | 365 |
2016 | J D DRILLING COMPANY | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
000UIC1802 | 1999-10-20 | Salt Water Injection Well | No Violations | 1501:9-9-05 (A) (9) DIKE MAINTAINENCE |
000UIC1803 | 1999-10-20 | Salt Water Injection Well | No Violations | 1501:9-3-04 DIKE NEEDS EMPTY |
0016800175 | 2004-02-05 | Enhanced Recovery Project | No Violations | Pressures were measured, while the pump was off. |
0017872069 | 2013-07-23 | Salt Water Injection Well | No Violations | Follow up to -2075986878. Roughly 30 gallons of fresh water used to fill the annular space. Multiple MIT tests were performed, the well was unable to hold the required pressures for the allowed times. Further remedial actions will be taken and well will remain shut in untill mechanical integrity is proven. |
0043002956 | 2015-11-05 | Final Restoration | Violations Noted | The containment dike, injection pump and tank have not been removed from the location. Remove the containment dike materials and take to an EPA approved landfill. Remove all equipment associated with the injection facility. Fill in excavation area. Grade and establish vegetative cover to bind the soil and prevent substantial erosion and sedimentation. |
0065299480 | 2005-07-18 | Enhanced Recovery Project | No Violations | Witnessed the packer installation. |
0071815089 | 2006-01-10 | Enhanced Recovery Project | No Violations | No violations at the time. |
0073686839 | 2011-10-25 | Salt Water Injection Well | No Violations | Accompanied J. Scott on SWIW inspection. No violations. |
0089580750 | 2016-08-31 | Final Restoration | No Violations | Compliance Notice # 43002956 follow up inspection. The concrete containment dike has not been removed from the location. The electric service pole and electric line are on site. There are two 2 inch plastic lines out side of the dike wall. |
0093731866 | 2018-08-23 | Final Restoration | No Violations | Compliance Notice # 43002956 follow up inspection. Collected a sample of the containment water and field tested the sample with Low Range Quantab. The Quantab showed no Cl. |
0101730823 | 2013-07-23 | Enhanced Recovery Project | No Violations | Mechanical integrity test of the annulus. Filled annulus with 30 gallons fresh water. Test was attempted multiple times. Unable to pass the test. Each time annulus leaked off more than 5 % in 15 minutes. Well master valve on the injection tubing is closed. Electric to the injection pump has been shut off. A random brine sample was collected and sent to the lab. Injection tubing was on vacuum during the testing of the annulus. |
0107393345 | 2007-10-22 | Enhanced Recovery Project | No Violations | There were no violations at the time. |
0116357224 | 2008-08-22 | Enhanced Recovery Project | No Violations | No violations were found at the time of inspection. |
0116772739 | 2009-03-17 | Enhanced Recovery Project | No Violations | Unable to gauge the annulus pressure. There were no violations at the time of inspection. |
0125958640 | 2016-12-20 | Final Restoration | No Violations | Compliance Notice # 43002956 follow up inspection. The concrete containment dike remains in place. The containment dike has no equipment or tanks in it. The electric service lines and poles are still in place. There are two 2 black plastic lines located outside of the containment dike. |
0171915957 | 2014-11-12 | Plug / Plug Back | No Violations | Site visit with UIC section Deputy Chief, Supervisor, and Geologist. Met with Jeff Harper to review plans for converting the containment dike into a brine transfer station. |
0217052405 | 2007-04-12 | Surface Facility Construction | No Violations | Flow lines were plumbed and buried. |
0297114270 | 2008-04-21 | Enhanced Recovery Project | No Violations | There were no violations at the time. |
0329792946 | 2014-12-03 | Plug / Plug Back | No Violations | Well has been plugged. Dike on site being used to contain tanks from other wells on lease. |
0333909462 | 2014-07-24 | Final Restoration | No Violations | Follow up to -2075986878. Final restoration requirements met. The tanks, lines, and dike are to be left and used as a transfer tank for two other wells on the lease. |
0404719357 | 2010-09-27 | Enhanced Recovery Project | Violations Noted | Brine in dike. 12 inches deep. 100 bbl tank overflowing. Pump has broken belts. Electric lines at the dike are a hazard. Yellow romex # 12 wires are ran through the air and spliced with tape. Power lines run into dike and are exposed to water. Wiring needs to be redone by an licensed Electrician. Swedge is leaking brine and has been covered with a rag. Replace all leaking fittings and pump out dike into tank. Identification is not legible. Well must have identification: Well owner, lease name, well number, permit number, county, emergency telephone number. |
0466558000 | 2011-03-08 | Enhanced Recovery Project | No Violations | 1.5 water in dike. Water level is over the lower portion of the pump wheel. Pumper was on site pumping out water into tank when I arrived on location. Pump failed and allowed rain event to fill dike. I was unable to test well due to water level in dike. I called Jonathan Reese and talked to him about the pump. |
0482192148 | 2010-03-18 | Enhanced Recovery Project | No Violations | Id on tank. Water in dike. 10 I called pumper and he came to site and turned on the sump pump to drain the dike. |
0508593066 | 2011-03-30 | Enhanced Recovery Project | No Violations | Dike is free of water. |
0573965713 | 2004-08-17 | Enhanced Recovery Project | No Violations | No violations. |
0598432561 | 2004-04-08 | Enhanced Recovery Project | No Violations | Bad valve on tubing. |
0614040655 | 2006-10-17 | Salt Water Injection Well | No Violations | No violations. Accompanied by Jon Scott. |
0621678957 | 2008-09-11 | Enhanced Recovery Project | No Violations | There were no violations found at the time of inspection. |
0628429454 | 2003-08-14 | Salt Water Injection Well | No Violations | No violations at the time of inspection. |
0657333446 | 2007-06-04 | Enhanced Recovery Project | No Violations | There were no violations at the time of inspection. |
0673232016 | 2012-05-07 | Enhanced Recovery Project | No Violations | Administered Mechanical Integrity Test with Jon Scott. 15-18 Barrels of fresh water run down annulus. Unable to pressure up on annular space. Test Failed. |
0706649979 | 2013-12-19 | Enhanced Recovery Project | No Violations | Well is shut in. Rebuilding packer. |
0715095397 | 2012-08-31 | Salt Water Injection Well | No Violations | 10-12 gallons of fresh water were used to fill the annular space. A fresh water mechanical integrity test was administered to attempt to prove mechanical integrity. The test was administered three times, each time the annular space was unable to hold pressure for the required times. The well was shut in. |
0756312217 | 2006-03-29 | Enhanced Recovery Project | No Violations | Pressures were measured while the pump was off. |
0762638953 | 2003-02-26 | Enhanced Recovery Project | No Violations | |
0776235991 | 2012-08-22 | Enhanced Recovery Project | Violations Noted | Upon inspection it was noted the injection tubing and the annular space were both on vacuum. Injection operations shall cease immediately and a mechanical integrity test shall be performed. |
0778393604 | 2009-08-18 | Enhanced Recovery Project | No Violations | Good id. Concrete dike needs patched. I informed Spence Carpenter. |
0787117375 | 2007-04-04 | Surface Facility Construction | No Violations | Concrete dike was completed. Dimensions were measured at 43 by 24 feet.
Both tanks (400 and 100 bbl.) were set. All was according to the approved plan. |
0791723429 | 2004-10-08 | Enhanced Recovery Project | No Violations | There were no violations at the time of inspection. |
0840121334 | 2012-08-29 | Administrative Inspection | No Violations | I spoke with Spence Carpenter about the companies plans to make corrective actions to the well. he has asked to perform the actions 8/31/12. An extension was granted because the company is currently drilling a new well. |
0882914956 | 2010-11-24 | Enhanced Recovery Project | No Violations | Good identification on tank. Rewired pumps and electric box. Removed yellow # 12 Romex wire and replaced with Grey # 12 AWG Type UFB Sunlight Resistant wire. Brine leak is fixed. Dike is free of water. |
0883836568 | 2016-03-09 | Administrative Inspection | No Violations | Found tank, electric and concrete pit still at site. Will call Jon Scott and discuss the current situation of the resoration. |
0944743234 | 2006-05-17 | Enhanced Recovery Project | No Violations | There were no violations. |
0965405149 | 2004-03-09 | Enhanced Recovery Project | No Violations | Dike full of water. Notified operator. |
1005487630 | 2012-09-04 | Salt Water Injection Well | No Violations | Arrived on location with Josh Garland and Jake Glascock. JD Drillings Service rig and water truck were on location. They were rigged up waiting on a tool to lift the production tubing packer, R4, to reseat it before the mechanical integrity test was performed. According to Josh they have already tried once on an earlier date to conduct this test and it did not pass. Annular space was already loaded with fresh water on top of the packer before we arrived. Josh put his 1000 psi gauge on the annular space and they used air pressure to raise pressure on the water column to 505 psi to start the 15-minute integrity test. At the end of the test, the well pressure measured 481 psi and met compliance by 1.25 psi ( 505 X .95 = 479.75 psi & 481 - 479.75= 1.25 psi). Josh then measured the injection pressure at 0 psi. |
1005578184 | 2007-07-17 | Enhanced Recovery Project | No Violations | No violations were found at the time of inspection. |
1014963371 | 2009-05-05 | Enhanced Recovery Project | No Violations | There were no violations. |
1038319112 | 2017-12-27 | Final Restoration | No Violations | I met with JD Drilling field superintendent Johnathon Reece concerning the remaining items that are left on site. The concrete vault remains along with 5 telephone poles with wire attached to the poles. Johnathon claimed they have a signed landowner waiver. I asked to see the waiver and I was told it would be emailed to me. I told Johnathon I need to see what was waved before the well could be written off for final restoration. |
1113347954 | 2005-05-13 | Enhanced Recovery Project | Violations Noted | |
1116345462 | 2016-06-08 | Final Restoration | No Violations | Compliance Notice # 43002956 follow up inspection. The steel tank has been removed from the concrete containment dike. No effort has been made to remove the containment dike. Electric service lines are connected to the pole outside of the dike. Two 2 black plastic lines have been cut off outside of the dike. |
1131384446 | 2005-10-26 | Enhanced Recovery Project | No Violations | Overall findings were acceptable. |
1140019584 | 2012-05-04 | Enhanced Recovery Project | Violations Noted | Injection tubing and Annulus were both on vacuum. Mechanical Integrity Test Shall be performed. Well shall cease injection operations immediately. |
1172314155 | 2007-04-18 | Enhanced Recovery Project | No Violations | Facility construction was completed. The area around the well site will require seed and mulch. |
1189433151 | 2007-09-10 | Enhanced Recovery Project | No Violations | No violations were found. |
1202734941 | 2008-06-02 | Enhanced Recovery Project | No Violations | No violations were found at the time of inspection. |
1209101016 | 2012-10-04 | Salt Water Injection Well | No Violations | Inspector Jon Scott had cited JD Drilling for cracks in the dike needing to be sealed on 8/5/11. The cracks have been sealed. I also checked the pressures on the injection tubing and the annulus. |
1212214396 | 2009-11-24 | Enhanced Recovery Project | No Violations | Good identification. Well is in compliance. |
1272795915 | 2019-03-07 | Final Restoration | No Violations | Compliance Notice # 43002956 follow up inspection. The concrete containment dike has not been removed. The dike is full of fresh water and ice. The electric lines are still attached to a pole next to the dike. |
1311950937 | 2012-06-11 | Enhanced Recovery Project | No Violations | Injection tubing and annulus have communication. Company attempting to reset packer with service rig. Was unable to fill annulus with fresh water and inhibitor. Pulled tubing and packer. 20th tubing joint had holes in side of tubing. Pulled packer out. |
1319554638 | 2011-10-25 | Enhanced Recovery Project | No Violations | Concrete dike cracks have been sealed. No violations observed during inspection. |
1330542990 | 2004-05-03 | Enhanced Recovery Project | Violations Noted | Unable to measure the pressure on the tubing, because the valve is corroded shut. |
1339444875 | 2012-06-11 | Salt Water Injection Well | No Violations | Packer was released and then reset two feet higher. Freshwater and corrosion inhibitor was placed in the annular space above the packer. When pressurized water flowed out of the tubing. Tubing was pulled and a large hole was found in one of the joints. |
1386926567 | 2012-09-04 | Enhanced Recovery Project | No Violations | Administered fresh water Mechanical Integrity Test. Less than 5 gallons fresh water used to fill the annular space. Annular space was able to hold the required pressure with the allowed decrease in psi for the test period. |
1387301668 | 2013-12-17 | Salt Water Injection Well | No Violations | Follow up to -2075986878. Well has been shut in since last inspection 7/17/13. Haliburton R4 packer is currently set under tension at 1629 feet on 2 3/8 tubing inside 4 1/2 casing. 17.1 Barrels (Bbl) required to fill annular space. 1.3 gallons corrosion inhibitor mixed with 3 Bbl fresh water was used to top off annulus. Company pulled up to 10,500 lbs on packer and tested annulus three times, each test resulted in a failure to demonstrat Mechanical Integrity. Company pulled up to 19,000 lbs on packer and tested a fourth time, resulting in failure. Company unseated packer and reset at 1628 then tested a fifth time. The company was unable to pass the test. |
1387386870 | 2013-12-18 | Salt Water Injection Well | No Violations | Follow up to -2075986878. Testing yesterday indicated possible lek in tubing high in hole. Pulled 5 joints of 2 3/8 tubing and reset packer. The annular space was filled with fresh water and a Mechanical Integrity Test was performed. Annular space unable to hold pressure. Company will pull another 5 joints and test again. |
1387544517 | 2013-12-17 | Enhanced Recovery Project | No Violations | Mechanical Integrity Test. Added 1 gallon inhibitor and 3 barrels of fresh water to annulus. Pulled additional 3,000 lbs on tubing tension. Tested 3 times each test lost more than 5% in 15 minutes. Pulled more tension for a total of 19,000 lbs. Retest annulus, test lost more than 5% in 15 minutes. Released packer and pulled up 18 and reset the packer with 21,000 lbs. filled annulus with fresh water and inhibitor. Tested the annulus, test failed. Lost more than 5% in 15 minutes. |
1387817951 | 2013-12-23 | Salt Water Injection Well | No Violations | Follow up to -2075986878. A rebuilt Haliburton R-4 packer was installed and set under tension at 11,000 pounds using the same tubing at 1626 feet. The annular space was tested three times and the well was unable to pass any of the MIT tests. |
1387824519 | 2013-12-23 | Annular Disposal | No Violations | I accompanied Josh Garland to witness JD Drilling reset packer and perform an annular test. |
1390339643 | 2013-01-18 | Enhanced Recovery Project | No Violations | No violations. |
1392754897 | 2014-02-18 | Enhanced Recovery Project | No Violations | Witnessed new 2 3/8 tubing and a rebuilt Halliburton R-4 packer being installed in the well. Set packer at 1665 and filled annulus with fresh water and inhibitor. Tested annulus 4 times. All lost more than 5% in 15 minutes. Released packer and pulled 2 joints tubing and set packer at 1607 and filled annulus with fresh water and inhibitor. Tested 2 times both lost more than 5% in 15 minutes. Rig pulled more tension on tubing and sheared the pins in the packer. Pulled tubing and packer back out of the well. Company plans to rebuild the packer and also expose the top of the 7 well head to look for any signs of leaks. |
1392917453 | 2014-02-20 | Salt Water Injection Well | No Violations | Follow up to -2075986878. Packer was set on tubing inside 4 1/2 last night and 570 psi was placed in side annulus according to company. This morning I tested the annulus and recorded 575 psi. Today 10 more joints of tubing ran and packer reset at 1212 feet. A MIT was administered with 550 psi on the anulus. The well was not able to hold pressure and the MIT failed. |
1396323234 | 2013-12-18 | Enhanced Recovery Project | No Violations | Released packer and pulled 5 joints of tubing out of the well. Set packer filled annulus and tested annulus to determine cause of leak. Test failed. Pulled additional 10 joints (15 total) and set packer , filled annulus with fresh water and tested. Test failed. Pulled all tubing and packer out of well. |
1398371181 | 2014-04-24 | Plug / Plug Back | No Violations | Plug Job. JD Drilling service rig and water trucks. Formation Cementing. Ran tubing to 1727. Berea perfs are from 1704 to 1712. Pumped 25 sacks class A cement with 2% gel and 4% Cacl. Mixed in Cotton seed hulls as lost circulation material. Tag top of 1st plug at 1318. Attempted to rip 4.5 casing at 1298 and again at 1264 there was no telegraph at surface (holes were cut in 4.5) Pulled up 100 and attempted to find free point, continued at 100 intervals with no success. Free point was established at 272. Fluid level at approximately 400. Attempted to circulate water around 4.5 casing to surface. Pumped 50 barrels fresh water with no returns to surface (air could be felt flowing around 4.5 while pumping water). Bullheaded a 500 cement plug down 4.5 from 1298 to 798. Displaced 13 barrels inside 4.5. Locked in and waited for cement to set. Ripped 4.5 at 375. Circulate fresh water to surface. Circulated a large amount of sand and small gravel water was a red brown color. Conditioned the well with Super Mud and was able to circulate and free the 4.5 casing. Pump cement plug from 375 to surface (in two stages 1st 200 then 175 to surface). Water circulated and stayed at the surface during the entire process. Cement returns to surface. |
1439178196 | 2016-04-13 | Final Restoration | No Violations | Compliance Notice # 43002956 follow up inspection. The concrete containment dike has one 100 barrel steel tank that is connected on top of the tank by two 2 plastic lines. The electric service is still connected to the poles at the containment dike. The brine pump has been removed from the location. |
1454907603 | 2014-06-17 | Final Restoration | No Violations | Lease road has been graded and gravel has been applied to 3/4 of the road. The lease road is still in use for production wells on the lease. The concrete containment dike, one 100 barrel steel tank, injection pump, lines, and electric service has not been removed. I called Spence Carpenter and Spence told me that they are not sure if they are going to remove the containment dike or reuse the dike and tank for production on the lease. I told Spence that He needs to remove the dike and equipment or submit a waiver form to the UIC section. |
1534361534 | 2018-08-13 | Final Restoration | No Violations | Compliance Notice # 43002956 follow up inspection. The concrete containment dike is intact and 3/4 full of water. The electric service is still in place and a 2 inch plastic line is cut off just outside the containment. |
1555336820 | 2007-04-10 | Surface Facility Construction | No Violations | No action has taken place since the last inspection. |
1558623071 | 2019-05-23 | Final Restoration | No Violations | Compliance Notice # 43002956 follow up inspection. The landowner waiver form for the concrete dike to remain on site has been approved. The concrete dike is full of fresh water. The site has good vegetative cover. Pictures were taken of the dike. |
1595126566 | 2014-01-02 | Administrative Inspection | No Violations | Meeting at JD Drilling office with Spence Carpenter (JD Drilling), and Inspector Josh Garland. We discussed the plans for getting the well in compliance. Spence told us that the plan is to rebuild the R4 packer and install it with a string of new tubing some time next week between 6th and 10th of January 2014. Weather permitting. |
1683044888 | 2004-07-20 | Enhanced Recovery Project | No Violations | The previous violation of tubing/fitting requirements has been remedied. A new valve and gauge have been installed on the tubing. Unable to remove pressure gauge, on the tubing, with an adjustable wrench. This gauge is showing a pressure of 0 psi., however this may actually be a vacuum. |
1687047299 | 2007-02-16 | Enhanced Recovery Project | No Violations | Liner will need replaced. |
1722711926 | 2008-02-25 | Enhanced Recovery Project | No Violations | There were no violations at the time of inspection. |
1770751467 | 2012-05-07 | Enhanced Recovery Project | No Violations | Annulus is on vacuum. Filled annulus with 15 barrels fresh water and inhibitor, and attempted to test. Unable to pressure up on annulus. Spence Carpenter said it could be up to two months before they could get a rig on the well to pull the tubing and packer. Injection is shut down. |
1841817771 | 2011-08-05 | Enhanced Recovery Project | Violations Noted | Good Identification. Concrete dike has cracks that need to be filled. Photos were taken. I called Jonathan Reese and he will have the cracks filled next week then call me for re-inspection. |
1848304136 | 2006-12-18 | Enhanced Recovery Project | No Violations | No violations were found at the time. |
1863526457 | 2005-07-19 | Enhanced Recovery Project | No Violations | Performed a mechanical integrity test on the well. |
1866627840 | 2005-01-14 | Salt Water Injection Well | No Violations | Could not remove the gauge on the tubing. |
1879729485 | 2013-06-06 | Salt Water Injection Well | No Violations | No violations. |
1897236552 | 2005-06-16 | Enhanced Recovery Project | No Violations | Upon arrival, the pump was not operating and there was no pressure on the tubing.
Attempted to increase the annular pressure. However, the pressure would not exceed 80 psi.. Instructed the well owners representative (Spencer Carpenter) to shut down the operation and requested a suspension order. |
1898392404 | 2005-08-02 | Enhanced Recovery Project | No Violations | Making repairs to the pump and dike. |
1989582395 | 2016-09-28 | Final Restoration | No Violations | Compliance Notice # 43002956 follow up inspection. On location with Jonathan Reese (JD Drilling field supervisor). Jonathan collected two soil samples from the down slope side of the containment dike. Sample # 1 GPS N39.06289/ W082.08139. Sample # 2 GPS N39.06289/ W082.08145. Sample # 3 Control sample was collected at GPS 39.06284/ W082.08069. The containment dike is free of fluids. JD Drilling has requested to use the dike for production operations for the two production wells on the lease. |
2016226726 | 2012-06-12 | Enhanced Recovery Project | No Violations | Install new Halliburton R-4 packer on a different string of used tubing. 3 shear pins were installed on packer (19,000 and 20,000). Packer set at 1629 pulled 7500 lbs over string weight to set packer. Fill annulus with fresh water and inhibitor. Test at 495 psi for 15 minutes. Lost 10 psi. Passed test. |
2070615580 | 2006-07-11 | Enhanced Recovery Project | No Violations | There were no violations at the time of inspection. |
2075986878 | 2013-07-17 | Salt Water Injection Well | Violations Noted | The injection tubing was on vacuum. Gauges read no pressure on the annular space, but after opening the needle valve it was noticed the annular space was full of pressurized gas, not fluid. Pressure differential exists between injection tubing and annular space, mechanical integrity is still intact. However annular space should be full of fluid. An MIT mini test shall be performed and the well must remain shut in until mechanical integrity is proven. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0043002956 | US-OH-124599 | 2019-06-05 | NONE3 | Failure to complete final restoration within six months |
0404719357 | US-OH-124310 | 2010-09-28 | Mechanical failure/contamination | |
0404719357 | US-OH-124311 | 2010-09-28 | Insufficient/No identification | |
0776235991 | US-OH-128815 | 2012-09-21 | Mechanical failure/contamination | |
1113347954 | US-OH-102855 | 2005-05-16 | Violation of injection tubing/fitting requirements | |
1113347954 | US-OH-102856 | 2005-05-16 | Failure to perform Mechanical Integrity Test | |
1140019584 | US-OH-103536 | 2012-05-04 | Mechanical failure/contamination | |
1330542990 | US-OH-109467 | 2004-05-11 | Violation of injection tubing/fitting requirements | |
1841817771 | US-OH-118399 | 2011-08-13 | Pits not liquid tight/Improper construction or use | |
2075986878 | US-OH-121184 | 2014-12-09 | Mechanical failure/contamination |
For data sources see[9]