If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-26109 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.886372,"lon":-80.335842,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Center Township | |
Operator Name: EQT PROD CO | |
Well Pad ID: 144796 | |
Farm/Lease Name: CARPENTER 590609 | |
License Status: Regulatory Inactive Status | |
Spud Date: 2016-11-05 | |
Permit Date: 2013-02-05 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 39.886372 | |
Longitude: -80.335842 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | EQT PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | EQT PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | EQT PROD CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2016 | EQT PROD CO | Drilling Fluid Waste (in Barrels) RWC 803 | 1,300.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016 | EQT PROD CO | Drill Cuttings (in Tons) RWC 810 | 842.75 Tons | LANDFILL | 100419 |
2016 | EQT PROD CO | Drilling Fluid Waste (in Barrels) RWC 803 | 1,820.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016 | EQT PROD CO | Other Oil & Gas Wastes (in Barrels) RWC 899 | 260.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | EQT PROD CO | Other Oil & Gas Wastes (in Barrels) RWC 899 | 230.00 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Produced Fluid (in Tons) RWC 802 | 7.72 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2018 | EQT PROD CO | Other Oil & Gas Wastes (in Barrels) RWC 899 | 372.00 Bbl | REUSE (AT WELL PAD) | |
2018 | EQT PROD CO | Other Oil & Gas Wastes (in Barrels) RWC 899 | 125.50 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | EQT PROD CO | Other Oil & Gas Wastes (in Barrels) RWC 899 | 8.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2019 | EQT PROD CO | Other Oil & Gas Wastes (in Barrels) RWC 899 | 680.50 Bbl | REUSE (AT WELL PAD) |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2505865 | Primary Facility | 2016-07-12 | Preoperation Inspection | No Violations Noted | Preoperational inspection conducted at the request of the operator. No violations noted. |
2536039 | Primary Facility | 2016-11-10 | Drilling/Alteration | No Violations Noted | Well spud on 11/5/2016. Operator augered a 30-inch borehole and set 26-inch conductor pipe at 40 ft. Conductor pipe cemented in place. Well cellar installed. |
2550664 | Primary Facility | 2017-01-04 | Drilling/Alteration | No Violations Noted | Surface and intermediate casings have been set and cemented to the surface by the displacement method. Pilot hole drilled to 7,137’ measured depth on 12/28/16. Rig of well. Well capped. |
2550672 | Primary Facility | 2016-12-28 | Drilling/Alteration | No Violations Noted | Operator has set and cemented surface and intermediate casings. Surface and intermediate casings were cemented to the surface by the displacement method. Operator drilling ahead @ 6,381’. |
For data sources see[6]