If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36058 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.749892,"lon":-79.00582,"icon":""}]} |
Operator Name: CNX GAS CO LLC | |
First Permit Date: 2008-06-04 | |
Last Permit Date: 2008-06-04 | |
Spud Date: 2009-04-28 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.749892 | |
Longitude: -79.00582 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 1481.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 2176.0 | 366.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 2825.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 4364.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 4672.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2008-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-0 | PRODUCED FLUID | 53.17 | Bbl | INJECTION DISPOSAL WELL | 34-013-20609 | BUCKEYE UIC BARNESVILLE #1 (SWIW#2) - CNX GAS CO | BARNESVILLE | OH |
2012-0 | PRODUCED FLUID | 50.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23584 | KOONTZ #1 DISPOSAL WELL | WARREN | OH |
2012-0 | PRODUCED FLUID | 66.0 | Bbl | INJECTION DISPOSAL WELL | 34-007-22038 | PAROBEK #2 (SWIW #12) | OH | |
2009-0 | FRACKING FLUID | 2130.0 | Bbl | OTHER | DOMINION EXP. & PROD. - WPA15689 | |||
2009-0 | BRINE | 785.0 | Bbl | INJECTION DISPOSAL WELL | DOMINION TRANSMISSION DISPOSAL-BIG RUN | |||
2009-0 | FRACKING FLUID | 2130.0 | Bbl | BRINE OR INDUSTRIAL WASTE TREATMENT PLT | HART RESOURCE TECH PLT | |||
2009-0 | BRINE | 785.0 | Bbl | BRINE OR INDUSTRIAL WASTE TREATMENT PLT | PA BRINE TRT - JOSEPHINE PLT -INDIANA CO | |||
2009-0 | BRINE | 785.0 | Bbl | INJECTION DISPOSAL WELL | SPENCER LAND #2 - NORTH COAST | |||
2009-0 | FRACKING FLUID | 2130.0 | Bbl | BRINE OR INDUSTRIAL WASTE TREATMENT PLT | TUNNELTON LIQUIDS COMPANY | |||
2010-0 | PRODUCED FLUID | 89.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | FRAC WATER REUSE | PA | ||
2010-0 | PRODUCED FLUID | 90.0 | Bbl | INJECTION DISPOSAL WELL | PAS2D902BCLE | SPENCER LAND CO #2 DISP WELL (033-22059) | CURWENSVILLE | PA |
2010-0 | PRODUCED FLUID | 445.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2011-0 | PRODUCED FLUID | 130.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-099-23127 | NORTH STAR BRINE DISPOSAL | YOUNGSTOWN | OH |
2011-0 | PRODUCED FLUID | 89.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2011-0 | PRODUCED FLUID | 46.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
2012-0 | PRODUCED FLUID | 53.17 | Bbl | INJECTION DISPOSAL WELL | 34-013-20609 | BUCKEYE UIC BARNESVILLE #1 (SWIW#2) - CNX GAS CO | BARNESVILLE | OH |
2012-0 | PRODUCED FLUID | 50.0 | Bbl | INJECTION DISPOSAL WELL | 34-155-23584 | KOONTZ #1 DISPOSAL WELL | WARREN | OH |
2012-0 | PRODUCED FLUID | 66.0 | Bbl | INJECTION DISPOSAL WELL | 34-007-22038 | PAROBEK #2 (SWIW #12) | OH | |
2013-0 | PRODUCED FLUID | 101.3 | Bbl | INJECTION DISPOSAL WELL | 34-013-20609 | BUCKEYE UIC BARNESVILLE #1 (SWIW#2) | BARNESVILLE | OH |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1795817 | 2009-05-01 | No Violations Noted | rigging-up/E&S ok/ID&pit ok | |
1797774 | 2009-05-13 | No Violations Noted | Site ID sign in place. E&S plan on site. Well being fraced at time of inspection.
BMP's are installed in accordance with E&S plan and are properly maintained. Access road ok. Site ok. No signs of accelerated erosion on site or access road. Lined pit appeared sound and had adequate freeboard. No erosion/sedimentation issues found. No violations found. |
|
1809210 | 2009-06-23 | No Violations Noted | equipped/E&S ok/tag ok | |
1925229 | 2010-10-27 | No Violations Noted | Drilling completed 5/6/09. Well tag in place. Well is equipped for production. Pump-jack installed.
Tank sound. Vegetated dirt dike installed around tank. Access road was stable.
the embankment. Adjacent to, and directly below this area is stabilized with vegetation, and there were no signs of erosion leaving the site. This area needs to be stabilized and the site properly restored. Spoke to operator representative Mike Gatsky about this concern. Scheduled meeting on site for the following day. Final stabilization and restoration complete pending completion of the above. |
|
1925233 | 2010-10-28 | No Violations Noted | Drilling completed 5/6/09. Well tag in place. Well equipped for production. Pump-jack installed. Tank sound. Access road ok.
Inspection conducted with operator representative Mike Gatsky to discuss compliance assistance inspection of 10/27/10. Mike will wait until after next spring to regrade the portion of the embankment that has slightly slipped down the site. Conditions will be more appropriate for additional earth disturbance at that time, as the site is currently stabilized around and below the area that has slipped, and no immediate E&S issues or further slipping is foreseen in the near future. Will perform follow-up inspection at a later date to ensure stabilization/restoration is achieved. Final stabilization and restoration complete pending completion of the above. |
|
2156551 | 2013-04-10 | Indiana | East Mahoning Twp | No Violations Noted |