37-063-36053

Well Details

Well ID: 37-063-36053
Loading map...
Operator Name: CNX GAS CO LLC
First Permit Date: 2008-06-03
Last Permit Date: 2009-06-05
Spud Date: 2009-09-22
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.855422
Longitude: -79.05896

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 4782.65 365.0 0.0 0.0 0.0 0.0
2012-0 5758.0 366.0 0.0 0.0 0.0 0.0
2011-0 0.0 0.0 0.0 0.0 0.0 0.0
2011-0 7280.24 365.0 0.0 0.0 0.0 0.0
2010-0 12257.0 365.0 0.0 0.0 0.0 0.0
2009-0 5480.69 365.0 0.0 0.0 0.0 0.0
2008-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 60.0 Bbl INJECTION DISPOSAL WELL 34-007-22038 PAROBEK #2 (SWIW #12) OH
2009-0 FRACKING FLUID 1250.0 Bbl OTHER DOMINION EXP. & PROD. - WPA15657
2009-0 FRACKING FLUID 1250.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT HART RESOURCE TECH PLT
2009-0 BRINE 2.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT PA BRINE TRT - JOSEPHINE PLT -INDIANA CO
2009-0 FRACKING FLUID 1250.0 Bbl BRINE OR INDUSTRIAL WASTE TREATMENT PLT TUNNELTON LIQUIDS COMPANY
2010-0 PRODUCED FLUID 81.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0020346 PUNXSUTAWNEY BORO STP PUNXSUTAWNEY PA
2011-0 PRODUCED FLUID 38.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-099-23127 NORTH STAR BRINE DISPOSAL YOUNGSTOWN OH
2012-0 PRODUCED FLUID 60.0 Bbl INJECTION DISPOSAL WELL 34-007-22038 PAROBEK #2 (SWIW #12) OH
2013-0 PRODUCED FLUID 28.0 Bbl INJECTION DISPOSAL WELL 34-155-22403 ANNAROCK D-1 FOWLER OH

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1899925 2010-07-02 No Violations Noted Well tag in place. Well is equipped for production.

Tank sound. Vegetated dirt dike installed around tank. Access road stabilized with no signs of accelerated erosion.

  • Site is fairly well stabilized with vegetation, but some areas of the site require additional seed/mulch to ensure 70% vegetative cover, and
   final stabilization is achieved.  The steep slopes present on this site elevates this need for maximum stability.  No signs of accelerated 
   erosion on site at time of inspection.  Spoke to operator representative Mike Gatsky about this concern.

Please address the above and contact this office upon completion. Restoration complete pending completion of the above.