If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-063-36874 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.707411,"lon":-79.153352,"icon":""}]} |
Operator Name: ACTAGON CORP | |
First Permit Date: 2010-07-13 | |
Last Permit Date: 2011-07-08 | |
Spud Date: 2012-07-10 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.707411 | |
Longitude: -79.153352 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2083141 | 2012-07-10 | No Violations Noted | SPUD NOTIFICATION FOR 7/10/12. Drilling permit renewed and valid till July 13, 2012.
At the time of this inspection, Well staked not yet drilled. Site ID sign and ES plan present. Conductor rig currently moving off Love Joy #2 on to [this] location. One unlined below grade pit located onsite. Bmp's installed down gradient according to plan. No accelerated erosion or sedimentation issues noted. Site previously built; therefore, most disturbed areas have been vegetated and temporarily stabilized. Operator informed that drilling must proceed with "due diligence" - defined by the department as well must be drilled to total depth within 16 months of issuance of permit or 4mnths after expiration of permit. If operator does not proceeded with due diligence site shall be stabilized (pits removed) and disturbed areas seeded mulched; otherwise operator is responsible for restoring well site 9 months from drilling completion date. |
|
2083192 | 2012-07-10 | No Violations Noted | ||
2236025 | 2014-01-13 | Violation(s) Noted | 686703 | |
2240644 | 2014-01-16 | Violation(s) Noted | 687792 | |
2240644 | 2014-01-16 | Violation(s) Noted | 687793 |