37-105-21848

Well Details

Well ID: 37-105-21848
Loading map...
Country: United States
State: Pennsylvania
County: Potter
Municipality: Summit Township
Operator Name: JKLM ENERGY LLC
Well Pad ID:
Farm/Lease Name: SWEDEN VALLEY 102 1HU
License Status:
Spud Date:
Permit Date: 2015-05-14
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.717162
Longitude: -77.899907

For data sources see[1][2][3]


Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2375250 Primary Facility 2015-06-02 Preoperation Inspection No Violations Noted Preop inspection at Sweden Valley 102 pad. Pad has been expanded. Construction/stabilization work nearly complete. Perimeter controls installed and majority of disturbed areas stabilized. Anticipate spudding of 3HU well on 6/2/15. TLT
2377496 Primary Facility 2015-06-09 Routine/Complete Inspection No Violations Noted
2386094 Primary Facility 2015-06-29 Incident- Response to Accident or Event No Violations Noted Incident inspection to document release of an estimated 275 gallons of phosphonic acid. Release occurred when a tote of anti-corrosion agent was punctured. Release cleanup and mitigation was initiated shortly after the release was discovered. Violations cited against the Sweden Valley 102 3HU permit (105-21850). TLT
2392192 Primary Facility 2015-07-13 Incident- Response to Accident or Event No Violations Noted Purpose of the inspection was to document a 63 gal calcium chloride release reported 7/7/15, which had been cleaned up. While on site, evidence of a new release was observed along the east side of the pad. Observed multiple damp areas on pad surface immediately adjacent to the containment. Containment nearly full with high conductivity fluid. Two samples collected. Sample results confirm pollutional substance on pad surface. Violations cited against the 3HU permit (105-21850). TLT
2442660 Primary Facility 2016-01-19 Follow-up Inspection No Violations Noted Inspection to follow up on the 6/27/15 phosphonic acid spill and the 7/13/15 brine release. Areas where soil has been excavated in association with the spills were observed. The site was snow covered and ground was frozen. No new violations were cited. The spill violations remain outstanding against the 3HU well (105-21850) and will be resolved upon receipt and review of the Remedial Action Completion Reports. TLT
2473933 Primary Facility 2016-04-08 Routine/Partial Inspection No Violations Noted Inspection to follow up on the 6/29/15 and 7/13/15 outstanding violations against the 3HU well (105-21850). These violations will be resolved upon receipt and review of the Remedial Action Completion Report. Site snow covered during inspection. A damp area was noted near some production equipment. Soil and standing water screened for conductivity. Conductivity readings were elevated. A sample was collected from the standing water. Additional violations may be cited against the 3HU well pending the sample results. TLT
2483782 Primary Facility 2016-05-10 Administrative/File Review No Violations Noted Admin inspection to review the Site Inspection and Soil Sampling Report provided by JKLM. Report summarizes JKLM's investigation of an area that exhibited elevated soil/water conductivity, as found during DEP's 4/8/16 inspection. Based upon the results of DEP's sample collected on 4/8/16, a violation is cited against the 3HU well. The violation is immediately corrected as JKLM recovered the water as soon as being made aware. The 6/29/15 and 7/13/15 violations against the 3HU remain outstanding and will be resolved upon receipt and review of the Remedial Action Completion Reports. No violations are cited against the 1HU, 2HU or ESCGP permits. TLT
2493894 Primary Facility 2016-06-10 Follow-up Inspection No Violations Noted Inspection to verify that the 6/29/15 and 7/13/15 outstanding violations against the 3HU well (102-21850) could be resolved. Inspection also to follow up on remedial actions completed in response to 4/8/16 inspection. Alternative Remediation Report for phoshonic acid and brine releases was approved by the DEP Environmental Cleanup and Brownfields Program on 5/25/16. Summary report documenting cleanup and confirmation sampling for area adjacent to glycol unit (associated with the 4/8/16 inspection) reviewed on 6/10/16 with no deficiencies noted. Outstanding violations against 3HU permit have been resolved. TLT
2545913 Primary Facility 2016-12-19 Plugging(Includes Plugged/Mined Through) No Violations Noted On December 19, 2016 at approximately 10:30 am I arrived on JKLM’s Sweden Valley 102 pad after receiving Notice of Intent from the operator last week to plug and abandon (3) wells; 1HU (105-20848), 2HU (105-21868) both on the 102 pad and the 5HU (105-21858, on the 101 pad). All (3) wells being plugged are conductors only. There was a crew on site. I met with on-site representative to discuss operations on the pad and their plugging procedure. At the time of inspection the crew was digging out the first well; the conductors were cut and buried in the cellar after being buried. All the conductors are reportedly cemented in place outside the pipe and on bottom. After the cellars are dug out they’ll fill conductors with ~50’ cement on bottom (pour ready-mix) and fill with gravel from that point to surface. There are two conductors on this pad (1HU and 2HU) both 96’, and the 5HU on the 102 pad next door, set at 80’. Today they’ll dig out all three cellars in preparation for cementing operations which will likely
2595696 Primary Facility 2017-05-15 Routine/Complete Inspection No Violations Noted