If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22449 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.615084736,"lon":-81.19480732,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Harrison Township | |
Operator Name: ENERVEST OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: SYLER-MAGEE UNIT | |
License Status: Producing | |
License Date: 2013-06-11 | |
Spud Date: 2013-09-17 | |
Spud Drilling Contractor: HIGHLAND DRLG | |
Final Drill Date: 2013-10-17 | |
Well Total Depth: 6679 ft | |
Configuration: Horizontal | |
Latitude: 40.615084736 | |
Longitude: -81.19480732 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-06-11 | Proposed Formations:BEREA THRU CLINTON, Issued Date:6/11/2013, Expired Date:6/11/2015 12:00:00 PM, Drilling unit acres:68.09, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2013-10-17 | |
Correction to Well | 2013-12-20 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2014-10-23 | |
Construction Permit Expires | 2015-06-11 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-11-07 | H2O | 15 | 2511 Bbl | 0 | Universal Well Services Inc. | STAGE 1/9
STAGES 2-8 SEE IMAGES |
2013-11-08 | H2O | 0 | 2253 Bbl | 0 | Universal Well Services Inc. | STAGE 9/9 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | ENERVEST OPERATING LLC | 83 | 711 | 13 |
2014 | ENERVEST OPERATING LLC | 7718 | 5262 | 365 |
2015 | ENERVEST OPERATING LLC | 6212 | 2246 | 365 |
2016 | ENERVEST OPERATING LLC | 4513 | 1651 | 366 |
2017 | ENERVEST OPERATING LLC | 3249 | 1053 | 365 |
2018 | ENERVEST OPERATING LLC | 2652 | 999 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | ENERVEST OPERATING LLC | Brine | 1029 | 13 |
2014 | ENERVEST OPERATING LLC | Brine | 15971 | 365 |
2015 | ENERVEST OPERATING LLC | Brine | 8304 | 365 |
2016 | ENERVEST OPERATING LLC | Brine | 6339 | 366 |
2017 | ENERVEST OPERATING LLC | Brine | 5756 | 365 |
2018 | ENERVEST OPERATING LLC | Brine | 5100 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0302324737 | 2013-09-17 | Drill / Deepen / Reopen | No Violations | I was on site to check the status of Highland Drilling. My inspection revealed that Highland Drilling Rig #2 was rigged up and getting ready to spud later this afternoon. I spoke with Jeff Foley (Enervest) and we discussed the casing program for this well, the installation of centralizers on the casing string, and we discussed the lateral section of this well. I walked around the well site and found no violations at this time. |
0650071380 | 2018-06-21 | Preliminary Restoration | No Violations | |
0859110412 | 2013-09-18 | Drill / Deepen / Reopen | No Violations | I was on site to witness the cementing of the 16 inch conductor casing. My inspection revealed that Highlands Drilling Rig #2 has drilled a 22 inch hole to a total depth of 94 feet and ran 77 feet of 16 inch conductor casing into the well bore. Universal cemented the casing with 150 sacks of Type 1 (3% CaCl and 1/4 pound per sack flake. The cement had a density of 15.6 pounds per gallon, a yield of 1.18 cubic feet per sack, and they used 5.2 gallons of mix water per sack. Universal pumped 31.5 barrels of cement slurry, 14 barrels of displacement, and there was 12 barrels of cement returns to surface. Universal finished displacement at 06:54 am and the cement stayed at ground level. My inspection revealed no violations at this time. |
1585154191 | 2018-12-28 | Production Wells | No Violations | The well was equipped with a pumping unit. No violations were observed at the time of inspection. |
1640175133 | 2013-09-20 | Drill / Deepen / Reopen | No Violations | I was on site to witness the cementing of the 11.75 inch diameter surface casing. I arrived on location at 8:30pm (09/19/13) and my inspection revealed that Highlands Drilling Rig #2 has drilled a 14.75 inch hole to a total depth of 742 feet. They ran 717 feet of 11.75 inch surface casing into the well bore. Universal cemented the casing with 410 sacks of Type 1 cement with 3% CaCl and 1/4 pound per sack flake as additives. The cement had a density of 15.6, a yield of 1.18 cubic feet per sack, and they used 5.2 gallons of mix water per sack. Universal pumped 86 barrels of cement slurry, 83 barrels of freshwater displacement, and there was 25 barrels of cement returns to surface. Universal landed the plug at 2:00am (09/20/13) with 323 PSI. My inspection revealed no violations at this time. NOTE: Highlands rig had a couple of mechanical issues and Universal had trouble with the pump truck during the job. |
For data sources see[8]