X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-30292

Well Details

Well ID: 37-005-30292
Loading map...
Operator Name: DANNIC ENERGY CORP
First Permit Date: 2009-03-23
Last Permit Date: 2009-03-23
Spud Date: 2010-02-25
Unconventional: No
Horizontal: No
Violations: None
Latitude: 41.013402
Longitude: -79.671563

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 739.38 304.0 0.0 0.0 79.03 304.0
2012-0 681.11 305.0 0.0 0.0 197.82 305.0
2011-0 527.18 304.0 0.0 0.0 21.0 304.0
2010-0 91.04 365.0 0.0 0.0 0.0 0.0
2009-0 0.0 0.0 0.0 0.0 0.0 0.0
2008-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-0 PRODUCED FLUID 123.0 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428 BROCKWAY TREATMENT PLANT BROCKWAY PA
2011-0 PRODUCED FLUID 42.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0028428 BROCKWAY TREATMENT PLANT BROCKWAY PA
2012-0 PRODUCED FLUID 123.0 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428 BROCKWAY TREATMENT PLANT BROCKWAY PA
2013-0 PRODUCED FLUID 86.0 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0028428 BROCKWAY AREA WASTEWATER TREATMENT PLANT BROCKWAY PA
2013-0 PRODUCED FLUID 10.0 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0020346 PUNXSUTAWNEY BORO SEWAGE TREATMENT PLANT PUNXSUTAWNEY PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
1867311 2010-02-25 No Violations Noted drilling - conductor installed/E&S ok/ID&pit ok
1868714 2010-03-02 No Violations Noted drilling - 7" cemented/E&S ok/ID&pit ok
1883735 2010-05-04 No Violations Noted drilling/E&S ok/ID&pit ok
1884353 2010-05-07 No Violations Noted drilling/E&S ok/ID&pit ok
1889922 2010-06-03 No Violations Noted Well drilled, but not equipped. Site ID sign and E&S plan located. The pit is still on-site and appears to be in sound condition. There is currently no evidence of accelerated erosion and sedimentation on the well site or the access road.

References