X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-20223

Well Details

Well ID: 37-115-20223
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Dimock Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 148440
Farm/Lease Name: GREENWOOD 6
License Status:
Spud Date:
Permit Date: 2009-11-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.751094
Longitude: -75.868028

For data sources see[1][2][3]

Well History

Date Event
2009-11-12 New Permit Application
2009-11-22 Performed Spud Operation
2010-04-14 Drilling Completion
2010-06-11 Perforation
2010-08-15 Performed Stimulation
2011-01-25 DEVIATED

For data sources see[4]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2010-08-15 0 0 0

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2010 CABOT OIL & GAS CORP 1,498,604.00 122 0.00 0 0.00 0
2011 CABOT OIL & GAS CORP 3,077,902.06 350 0.00 0 0.00 0
2012 CABOT OIL & GAS CORP 1,485,147.39 363 0.00 0 0.00 0
2013 CABOT OIL & GAS CORP 1,379,070.44 365 0.00 0 0.00 0
2014 CABOT OIL & GAS CORP 1,068,003.58 355 0.00 0 0.00 0
2015 CABOT OIL & GAS CORP 454,496.87 365 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 876,041.28 366 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 673,808.33 365 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 604,122.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 520,765.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CABOT OIL & GAS CORP Basic Sediment 2.96 Bbl LANDFILL 101534
2010 CABOT OIL & GAS CORP Drill Cuttings 75.40 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 101247
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 248.90 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 CABOT OIL & GAS CORP Produced Fluid 1,213.10 Bbl REUSE OTHER THAN ROAD SPREADING
2010 CABOT OIL & GAS CORP Drill Cuttings 21.30 Tons LANDFILL NY # 50S08
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 119.05 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0026034
2010 CABOT OIL & GAS CORP Drill Cuttings 122.60 Tons LANDFILL NY # 02S17
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 149.80 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 CABOT OIL & GAS CORP Drill Cuttings 1.60 Tons LANDFILL 100955
2010 CABOT OIL & GAS CORP Fracing Fluid Waste 9,503.00 Bbl REUSE OTHER THAN ROAD SPREADING
2010 CABOT OIL & GAS CORP Drill Cuttings 122.60 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 8-4630-00010/00
2010 CABOT OIL & GAS CORP Drilling Fluid Waste 4,595.24 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0008451
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 524.98 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 4.03 Tons LANDFILL 101247
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 11.67 Bbl LANDFILL 100955
2011 CABOT OIL & GAS CORP Basic Sediment 3.49 Bbl LANDFILL 101534
2011 CABOT OIL & GAS CORP Drill Cuttings 11.64 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD014286009
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 9.42 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Produced Fluid 730.27 Bbl REUSE OTHER THAN ROAD SPREADING
2011 CABOT OIL & GAS CORP Drill Cuttings 0.64 Tons LANDFILL 101534
2011 CABOT OIL & GAS CORP Drill Cuttings 54.57 Tons LANDFILL THR029
2011 CABOT OIL & GAS CORP Drill Cuttings 0.82 Tons LANDFILL 100081
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 5.04 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011 CABOT OIL & GAS CORP Fracing Fluid Waste 1.32 Bbl LANDFILL 301626
2011 CABOT OIL & GAS CORP Basic Sediment 1.04 Bbl LANDFILL 100081
2011 CABOT OIL & GAS CORP Drilling Fluid Waste 6.87 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PAD014286009
2011 CABOT OIL & GAS CORP Drill Cuttings 4.35 Tons LANDFILL 132310
2012 CABOT OIL & GAS CORP Basic Sediment 1.27 Bbl LANDFILL THR029
2012 CABOT OIL & GAS CORP Basic Sediment 1.66 Bbl LANDFILL 100081
2012 CABOT OIL & GAS CORP Basic Sediment 2.43 Bbl LANDFILL 101534
2012 CABOT OIL & GAS CORP Produced Fluid 14.84 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE001
2012 CABOT OIL & GAS CORP Produced Fluid 493.14 Bbl REUSE OTHER THAN ROAD SPREADING
2013 CABOT OIL & GAS CORP Produced Fluid 219.24 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2013 CABOT OIL & GAS CORP Produced Fluid 102.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 87.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2014 CABOT OIL & GAS CORP Produced Fluid 57.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2015 CABOT OIL & GAS CORP Produced Fluid 113.47 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015 CABOT OIL & GAS CORP Produced Fluid 4.25 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE001
2016 CABOT OIL & GAS CORP Produced Fluid 178.09 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2016 CABOT OIL & GAS CORP Produced Fluid 43.62 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 158.22 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017 CABOT OIL & GAS CORP Produced Fluid 113.18 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 CABOT OIL & GAS CORP Produced Fluid 115.87 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018 CABOT OIL & GAS CORP Produced Fluid 68.82 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019 CABOT OIL & GAS CORP Produced Fluid 206.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1852453 Primary Facility 2009-12-18 Compliance Evaluation Viol(s) Noted & Immediately Corrected
1852651 Primary Facility 2009-12-10 Routine/Complete Inspection No Violations Noted
1852657 Primary Facility 2009-12-15 Routine/Complete Inspection No Violations Noted
1879571 Primary Facility 2010-03-30 Drilling/Alteration No Violations Noted Patterson 252. Closed loop system. Haliburton on site cementing surface casing. Floats held. Pumped 460 sks Class A with 40 bbls return to surface. Site lined with plastic. No violations observed.
1947248 Primary Facility 2011-01-05 Routine/Partial Inspection Violation(s) Noted SW-defective cement job, 78.86(a) & 78.81(a)(2)&(3), 0.1 psi at 9 5/8 annulus & 0.2 psi at 5 1/2 annulus, 25% gas at 9 5/8 annulus & 90% gas at 5 1/2 annulus, 10 day response requested.
1956785 Primary Facility 2011-03-05 Routine/Complete Inspection No Violations Noted
1980743 Primary Facility 2011-06-13 Follow-up Inspection Violation(s) Noted
2007719 Primary Facility 2011-09-02 Routine/Complete Inspection No Violations Noted
2028183 Primary Facility 2011-10-08 Routine/Complete Inspection No Violations Noted Well online. Cellar full of water. No bubbling observed. Pipeline crews working on site. Vents are open and vented to Brine tanks. Gauge on well reading @ 300 psi. Inspecting wells as part of ongoing gas migration investigation.
2033533 Primary Facility 2011-12-05 Incident- Response to Accident or Event No Violations Noted
2139935 Primary Facility 2013-02-14 Follow-up Inspection No Violations Noted On site to collect pressure reading and isotopic gas samples from annulus of well. DEP reps on site = Steve Watson, Eric Rooney, and Gene Rickard. DEP met with John Smelko of Cabot. Selman reps on site to assist with collection of gas readings and gas sampling. Cabot shut in annuli on well @9am this morning. A digital pressure gauge was installed by Cabot on 16" x 9 5/8" annulus. Pressure indicated was 0 psi. Gauge was removed and open vent flow was screened using Model 60 gas meter. Model 60 reading = 0% combustible gas. The pressure gauge was installed on the 9 5/8" x 5 1/2" annulus. Pressure reading was 0 psi. Model 60 reading was 0% combustible gas. No samples were collected. After completion of testing, Cabot re-connected vent lines and locked vents open.
2481920 Primary Facility 2016-04-27 Routine/Partial Inspection No Violations Noted The Department was on site at the Greenwood, R. Pad 1 to conduct a Routine Partial Inspection. The E&S Inspection Log indicated that Mike Brilla (TEC) conducted a Post Rain Event Inspection on 4/27/16. It appears as though the landowner has made a road to the left of the access road gate to circumvent said gate. Also, it seems as if the landowner has been working areas on the well site. There is a large area within the well pad surface that looks like wood chips have been strewn across it and sections of plastic packaging are intermixed.

The perimeter ditch does not appear to meet temporary stabilization requirements. The Department requests that the operator investigate the area and deploy a method of erosion control that is consistent with your plan. The production tanks were stained during the inspection. One of the tanks has more staining than the other. The Department requests that the operator inspect the tanks to find the origin of the staining.

2528905 Primary Facility 2016-10-17 Follow-up Inspection No Violations Noted
2642435 Primary Facility 2017-10-02 Site Restoration No Violations Noted I inspected the site for notice of termination (NOT) on October 2, 2017. The site was surrounded by active agriculture (field corn). The access road leading in was in good shape with no rutting and the site was well vegetated on the cut and fill slopes. The pad surface was solid and stable as well. There were no erosional issues noted.

I recommend APPROVAL of this NOT.

There were no violations observed.

2774795 Primary Facility 2018-09-11 Routine/Complete Inspection No Violations Noted Arrived on location at 09:00. Weather: ~ 65 degs., light rain, slight breeze. Onsite to initiate 72 hr. pressure build up test "PBUT" on the annuli of the Greenwood 1V, 6H, 7H & 8H wells. All wells, back side of production casing annuli have been isolated and were venting to onsite poly vent tanks. The 6H, 7H & 8H wells (16"x 9 5/8") cemented annuli had open top 16" casings in cellar *. The 1V wells (9 5/8"x 7") cemented annulus was beneath water level in cellar, no bubbling was noted at time of inspection.

- Upon arrival I met with Cabot O&G Reps. Jeremy Rapp and Sully Rutledge. Prior to shutting in wells annuli, initial gas screenings and flow checks were performed at the 1V (7"x 4 1/2") and 6H, 7H & 8H (9 5/8"x 5 1/2") annuli using the Depts. Altair 5X gas meter, calibrated this morning, and Cabots' RS-484 Alicat "Whisper" flow meter. Pre-shut in screenings showed: - 1V: (7"x 4 1/2") = 100% CH4, 9.2 cf/d; (9 5/8"x 7") open casing top in cellar, No bubbling noted. - 6H: (9 5/8"x 5 1/2") = 100% CH4, 15.2 cf

2775653 Primary Facility 2018-09-14 Routine/Complete Inspection No Violations Noted Arrived on location at: 09:00. Weather: ~ 75 degs., Light rain, Slight breeze. Onsite to conclude the 72-hr. pressure build up test ¿PBUT¿ being performed on the Greenwood 1V, 6H, 7H & 8H wells, back side of production casing annuli and the 1V¿s (9 5/8¿x 7¿) cemented annulus.

- Upon arrival I met with Cabot O&G Rep. Sully Rutledge and Selman and Associates Reps. Kaydee Oliver and Russell Mohlt. There was also a GDS Vac Truck and Operator onsite to add or remove water to cellar areas as needed. The ending PBUT pressures were checked by Cabot Rep. using a digital Crystal pressure gauge. Ending pressures are listed below: - 1V: (7"x 4 ½¿) = 21 psi., Gas sample taken = 100% CH4; (9 5/8"x 7") = 0.0 psi., No sample taken. Cellar was initially full of water w/ no bubbling noted. Cellar was then emptied confirming (9 5/8"x 7") vent line connection to enclosed casing top. - 6H: (9 5/8¿ x 5 ½¿) = 12.0 psi. Gas sample taken = 100% CH4; (16"x 9 5/8") = 0.0 psi. (Open casing top in cellar). Cellar was initially full of w

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1852453 578575 12/18/2009 2009-12-18 601.101 - O&G Act 223-General. Used only when a specific O&G Act code cannot be used Administrative 78.56 failure to contain pollutional substances in a lined pit or tank.
1947248 604006 01/05/2011 2011-01-05 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative 0.1 psi at 9 5/8 annulus & 0.2 psi at 5 1/2 annulus, 25% gas at 9 5/8 annulus & 90% gas at 5 1/2 annulus
1947248 604011 01/05/2011 2011-01-05 207B - Failure to case and cement to prevent migrations into fresh groundwater Environmental Health & Safety 78.81(a)(2)&(3) - 0.1 psi at 9 5/8 annulus & 0.2 psi at 5 1/2 annulus, 25% gas at 9 5/8 annulus & 90% gas at 5 1/2 annulus
1980743 613563 06/13/2011 2011-06-13 78.65(1)* - Rat hole not filled Environmental Health & Safety rathole cleaned and filled in
1980743 613564 06/13/2011 2011-06-13 78.56(1) - Pit and tanks not constructed with sufficient capacity to contain pollutional substances. Administrative rathole cleaned and filled in
1980743 613565 06/13/2011 2011-06-13 402CSL B - Failure to meet requirements of permit, rules and regulations, or order of DEP. Environmental Health & Safety rathole cleaned and filled in
1980743 613566 06/13/2011 2011-06-13 SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. Environmental Health & Safety rathole cleaned and filled in

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
604006 267354 NOV - Notice of Violation
604011 267354 NOV - Notice of Violation
613563 272557 NOV - Notice of Violation
613564 272557 NOV - Notice of Violation
613565 272557 NOV - Notice of Violation
613566 272557 NOV - Notice of Violation

For data sources see[8]

References