If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0455060109000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.850155,"lon":-114.749229,"icon":""}]} |
Location: 00/09-01-045-06W5/0 | |
Location Alias: 00/09-01-45-06 W5M | |
Location Alias 2: 00/09-01-045-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 045 | |
Meridian: 5 | |
Range: 06 | |
Section: 01 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: TAC HZ PEMBINA 9-1-45-6 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0444719 | |
License Date: 2012-03-06 | |
License Status: Amended | |
Spud Date: 2012-08-25 | |
Final Drill Date: 2012-09-01 | |
Well Total Depth: 3286.00 m | |
Surface Hole Latitude: 52.850155 | |
Surface Hole Longitude: -114.749229 |
Date | Event |
---|---|
2012-03-06 | Obtained License |
2012-08-26 | Surface Casing Operation Performed |
2012-08-27 | Direction Drilling Operation Performed - Deviate |
2012-08-27 | Well Log Performed |
2012-08-29 | Direction Drilling Operation Performed - Horizontal |
2012-09-01 | Finished Drilling |
2012-09-01 | Perforation Treatment Performed - Open-Hole Completion |
2012-09-01 | Well Log Performed |
2012-09-01 | Well Mode changed to Drilled and Cased |
2012-09-02 | Production Casing Operation Performed |
2012-09-03 | Rig Released |
2012-10-23 | Well Log Performed |
2012-11-01 | Well Fluid changed to Crude Oil |
2012-11-01 | Well Mode changed to Drilling and Completing |
2012-11-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-01-01 | Well Began Production |
2013-01-01 | Well Fluid changed to Crude Oil |
2013-01-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-08-25 | Nabors Drilling Limited | 15 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-27 | 686.00 | Deviate (5 - 79 degrees) |
2012-08-29 | 1901.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-09-01 | Open Hole/Barefoot Completion | 3275.40 | 3286.00 | 0 |
2012-11-07 | Multi-Stage Fracture | 3257.00 | 3257.10 | 0 |
2012-11-07 | Multi-Stage Fracture | 3193.70 | 3193.80 | 0 |
2012-11-07 | Multi-Stage Fracture | 3130.90 | 3131.00 | 0 |
2012-11-07 | Multi-Stage Fracture | 3066.20 | 3066.30 | 0 |
2012-11-07 | Multi-Stage Fracture | 2990.00 | 2990.10 | 0 |
2012-11-07 | Multi-Stage Fracture | 2926.10 | 2926.20 | 0 |
2012-11-07 | Multi-Stage Fracture | 2863.60 | 2863.70 | 0 |
2012-11-07 | Multi-Stage Fracture | 2799.10 | 2799.20 | 0 |
2012-11-07 | Multi-Stage Fracture | 2735.40 | 2735.50 | 0 |
2012-11-07 | Multi-Stage Fracture | 2673.10 | 2673.20 | 0 |
2012-11-07 | Multi-Stage Fracture | 2609.60 | 2609.70 | 0 |
2012-11-07 | Multi-Stage Fracture | 2545.30 | 2545.40 | 0 |
2012-11-07 | Multi-Stage Fracture | 2482.30 | 2482.40 | 0 |
2012-11-07 | Multi-Stage Fracture | 2418.20 | 2418.30 | 0 |
2012-11-07 | Multi-Stage Fracture | 2354.50 | 2354.60 | 0 |
2012-11-07 | Multi-Stage Fracture | 2290.40 | 2290.50 | 0 |
2012-11-07 | Multi-Stage Fracture | 2226.50 | 2226.60 | 0 |
2012-11-07 | Multi-Stage Fracture | 2150.10 | 2150.20 | 0 |
2012-11-07 | Multi-Stage Fracture | 2087.60 | 2087.70 | 0 |
2012-11-07 | Multi-Stage Fracture | 2023.90 | 2024.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 7394 | 0.0 | 0.0 | 0.0 |
2014 | 7373 | 0.0 | 0.0 | 0.0 |
2015 | 6842 | 0.0 | 0.0 | 0.0 |
2016 | 8666 | 0.0 | 0.0 | 0.0 |
2017 | 3556 | 0.0 | 0.0 | 0.0 |
2018 | 7502 | 0.0 | 0.0 | 0.0 |
2019 | 8671 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-09-03 | No Incident Encountered | 0.00 | 0.00 |
2012-11-11 | No Incident Encountered | 0.00 | 0.00 |
2012-11-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]