If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0645133213000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.575992,"lon":-115.92109,"icon":""}]} |
Location: 00/13-32-064-13W5/0 | |
Location Alias: 00/13-32-64-13 W5M | |
Location Alias 2: 00/13-32-064-13 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 064 | |
Meridian: 5 | |
Range: 13 | |
Section: 32 | |
County/Municipality: Big Lakes County | |
Well Name: CPEC HZ VIRG 13-32-64-13 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0442718 | |
License Date: 2012-01-12 | |
License Status: Issued | |
Spud Date: 2012-01-24 | |
Final Drill Date: 2012-02-11 | |
Well Total Depth: 4505.00 m | |
Surface Hole Latitude: 54.575992 | |
Surface Hole Longitude: -115.92109 |
Date | Event |
---|---|
2012-01-12 | Obtained License |
2012-01-25 | Surface Casing Operation Performed |
2012-02-01 | Well Log Performed |
2012-02-03 | Direction Drilling Operation Performed - Horizontal |
2012-02-03 | Well Log Performed |
2012-02-04 | Intermediate Casing Operation Performed |
2012-02-11 | Finished Drilling |
2012-02-11 | Well Log Performed |
2012-02-11 | Well Mode changed to Drilled and Cased |
2012-02-14 | Liner Casing Operation Performed |
2012-02-14 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-15 | Rig Released |
2012-02-15 | Well Log Performed |
2012-03-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-13 | Well Began Production |
2012-03-13 | Well Fluid changed to Crude Oil |
2012-03-13 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-24 | Horizon Drilling Inc. | 8 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-03 | 2533.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-14 | Open Hole/Barefoot Completion | 4501.00 | 4505.00 | 0 |
2012-03-12 | Multi-Stage Fracture | 3050.90 | 3051.70 | 0 |
2012-03-12 | Multi-Stage Fracture | 3115.10 | 3115.90 | 0 |
2012-03-12 | Multi-Stage Fracture | 3192.70 | 3193.50 | 0 |
2012-03-12 | Multi-Stage Fracture | 3256.10 | 3256.90 | 0 |
2012-03-12 | Multi-Stage Fracture | 3321.80 | 3322.60 | 0 |
2012-03-12 | Multi-Stage Fracture | 3397.70 | 3398.50 | 0 |
2012-03-12 | Multi-Stage Fracture | 3461.90 | 3462.70 | 0 |
2012-03-12 | Multi-Stage Fracture | 3537.70 | 3538.50 | 0 |
2012-03-12 | Multi-Stage Fracture | 3602.20 | 3603.00 | 0 |
2012-03-12 | Multi-Stage Fracture | 3678.40 | 3679.20 | 0 |
2012-03-12 | Multi-Stage Fracture | 3742.90 | 3743.70 | 0 |
2012-03-12 | Multi-Stage Fracture | 3805.90 | 3806.70 | 0 |
2012-03-12 | Multi-Stage Fracture | 3882.00 | 3882.80 | 0 |
2012-03-12 | Multi-Stage Fracture | 3945.70 | 3946.90 | 0 |
2012-03-12 | Multi-Stage Fracture | 4021.90 | 4022.70 | 0 |
2012-03-12 | Multi-Stage Fracture | 4086.00 | 4086.80 | 0 |
2012-03-12 | Multi-Stage Fracture | 4163.80 | 4164.60 | 0 |
2012-03-12 | Multi-Stage Fracture | 4228.30 | 4229.10 | 0 |
2012-03-12 | Multi-Stage Fracture | 4292.30 | 4293.10 | 0 |
2012-03-12 | Multi-Stage Fracture | 4368.00 | 4368.80 | 0 |
2012-03-12 | Multi-Stage Fracture | 4431.90 | 4432.70 | 0 |
2012-03-12 | Multi-Stage Fracture | 4491.70 | 4493.10 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6003 | 0.0 | 0.0 | 0.0 |
2013 | 8379 | 0.0 | 0.0 | 0.0 |
2014 | 8296 | 0.0 | 0.0 | 0.0 |
2015 | 6165 | 0.0 | 0.0 | 0.0 |
2016 | 7961 | 0.0 | 0.0 | 0.0 |
2017 | 7600 | 0.0 | 0.0 | 0.0 |
2018 | 7580 | 0.0 | 0.0 | 0.0 |
2019 | 8597 | 0.0 | 0.0 | 0.0 |
2020 | 2058 | 0.0 | 0.0 | 0.0 |
For data sources see[7]