X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0775132306000

Well Details

Well ID: 0775132306000
Loading map...
Location: 00/06-23-077-13W5/0
Location Alias: 00/06-23-77-13 W5M
Location Alias 2: 00/06-23-077-13 W5/00
Country: Canada
Province: Alberta
Township: 077
Meridian: 5
Range: 13
Section: 23
County/Municipality: Big Lakes County
Well Name: SGG LHORSE 6-23-77-13
Operator Name: Sabanero Energy Corp.
License Number: 0164107
License Date: 1994-01-18
License Status: Suspension
Spud Date: 1994-03-21
Final Drill Date: 1994-04-04
Well Total Depth: 2055.00 m
Surface Hole Latitude: 55.683464
Surface Hole Longitude: -115.90572

For data sources see[1][2]

Well History

Date Event
1994-01-18 Obtained License
1994-03-22 Surface Casing Operation Performed
1994-04-04 Finished Drilling
1994-04-04 Well Log Performed
1994-04-04 Well Mode changed to Drilled and Cased
1994-04-06 Production Casing Operation Performed
1994-04-06 Rig Released
1994-04-10 Perforation Treatment Performed - Jet Perforation
1994-04-10 Well Began Production
1994-04-10 Well Fluid changed to Crude Oil
1994-04-10 Well Mode changed to Flowing
1999-12-28 Perforation Treatment Performed - Jet Perforation
1999-12-28 Well Log Performed
2000-10-27 Well Fluid changed to Crude Oil
2000-10-27 Well Mode changed to Pumping
2004-01-01 Well Fluid changed to Crude Oil
2004-01-01 Well Mode changed to Suspended
2004-04-02 Well Log Performed
2004-04-03 Perforation Treatment Performed - Jet Perforation
2004-04-03 Well Log Performed
2004-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-04-05 Perforation Treatment Performed - Jet Perforation
2004-04-05 Well Log Performed
2004-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-05-05 Well Log Performed
2005-05-07 Perforation Treatment Performed - Cement Squeeze
2005-05-07 Plug Back Performed
2005-05-10 Perforation Treatment Performed - Cement Squeeze
2005-05-10 Plug Back Performed
2005-05-13 Perforation Treatment Performed - Jet Perforation
2005-05-19 Perforation Treatment Performed - Cement Squeeze
2005-05-19 Plug Back Performed
2005-05-21 Perforation Treatment Performed - Jet Perforation
2005-05-25 Perforation Treatment Performed - Jet Perforation
2005-05-26 Perforation Treatment Performed - Jet Perforation
2005-05-26 Well Log Performed
2005-05-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-27 Plug Back Performed
2005-05-27 Well Fluid changed to Crude Oil
2005-05-27 Well Log Performed
2005-05-27 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-04-10 Perforation 2042.00 2043.00 20
1994-04-10 Perforation 2036.50 2039.00 20
1999-12-28 Perforation 2039.50 2040.20 18
2004-04-03 Perforation 836.50 838.50 17
2004-04-04 Acid Treatment 836.50 838.50 0
2004-04-05 Perforation 817.50 820.00 17
2004-04-06 Acid Treatment 817.50 820.00 0
2005-05-07 Cement Squeeze 817.50 838.50 0
2005-05-10 Cement Squeeze 2036.50 2043.00 0
2005-05-13 Perforation 2035.00 2038.00 17
2005-05-19 Cement Squeeze 2035.00 2038.00 0
2005-05-21 Perforation 2035.00 2036.00 17
2005-05-25 Perforation 2036.00 2036.50 17
2005-05-26 Perforation 2036.50 2037.00 17
2005-05-27 Packing Device Capped w/Cement 2017.00 2025.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 5407 0.0 0.0 0.0
1995 8656 0.0 0.0 0.0
1996 8362 0.0 0.0 0.0
1997 7615 0.0 0.0 0.0
1998 8388 0.0 0.0 0.0
1999 6612 0.0 0.0 0.0
2000 8382 0.0 0.0 0.0
2001 7978 0.0 0.0 0.0
2002 2586 0.0 0.0 0.0

For data sources see[5]

References