If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0685093404000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.94017,"lon":-115.288163,"icon":""}]} |
Location: 00/04-34-068-09W5/0 | |
Location Alias: 00/04-34-68-09 W5M | |
Location Alias 2: 00/04-34-068-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 5 | |
Range: 09 | |
Section: 34 | |
County/Municipality: Big Lakes County | |
Well Name: RIDGEBACK SWANH 4-34-68-9 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0449622 | |
License Date: 2012-10-30 | |
License Status: Issued | |
Spud Date: 2012-11-14 | |
Final Drill Date: 2012-12-04 | |
Well Total Depth: 3894.00 m | |
Surface Hole Latitude: 54.940170 | |
Surface Hole Longitude: -115.288163 |
Date | Event |
---|---|
2012-10-30 | Obtained License |
2012-11-14 | Surface Casing Operation Performed |
2012-11-19 | Direction Drilling Operation Performed - Deviate |
2012-11-20 | Well Log Performed |
2012-11-21 | Intermediate Casing Operation Performed |
2012-11-25 | Direction Drilling Operation Performed - Horizontal |
2012-11-25 | Well Log Performed |
2012-12-03 | Liner Casing Operation Performed |
2012-12-04 | Finished Drilling |
2012-12-04 | Well Log Performed |
2012-12-04 | Well Mode changed to Drilled and Cased |
2012-12-09 | Rig Released |
2012-12-10 | Perforation Treatment Performed - Open-Hole Completion |
2012-12-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-12-19 | Well Began Production |
2012-12-19 | Well Fluid changed to Crude Oil |
2012-12-19 | Well Mode changed to Flowing |
2012-12-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-12-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-01-17 | Well Log Performed |
2014-07-01 | Well Fluid changed to Crude Oil |
2014-07-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-11-14 | Ironhand Drilling Inc. | 2 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-11-19 | 1720.00 | Deviate (5 - 79 degrees) |
2012-11-25 | 2432.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-12-10 | Open Hole/Barefoot Completion | 3890.00 | 3894.00 | 0 |
2012-12-19 | Multi-Stage Fracture | 3860.90 | 3861.00 | 0 |
2012-12-19 | Multi-Stage Fracture | 3796.20 | 3796.30 | 0 |
2012-12-19 | Multi-Stage Fracture | 3735.40 | 3735.50 | 0 |
2012-12-19 | Multi-Stage Fracture | 3674.60 | 3674.70 | 0 |
2012-12-19 | Multi-Stage Fracture | 3613.80 | 3613.90 | 0 |
2012-12-19 | Multi-Stage Fracture | 3538.90 | 3539.00 | 0 |
2012-12-19 | Multi-Stage Fracture | 3449.90 | 3450.00 | 0 |
2012-12-19 | Multi-Stage Fracture | 3389.30 | 3389.40 | 0 |
2012-12-20 | Multi-Stage Fracture | 3314.80 | 3314.90 | 0 |
2012-12-20 | Multi-Stage Fracture | 3240.30 | 3240.40 | 0 |
2012-12-21 | Multi-Stage Fracture | 3182.40 | 3182.50 | 0 |
2012-12-21 | Multi-Stage Fracture | 3107.50 | 3107.60 | 0 |
2012-12-21 | Multi-Stage Fracture | 3019.20 | 3019.30 | 0 |
2012-12-21 | Multi-Stage Fracture | 2958.40 | 2958.50 | 0 |
2012-12-21 | Multi-Stage Fracture | 2897.60 | 2897.70 | 0 |
2012-12-21 | Multi-Stage Fracture | 2825.50 | 2825.60 | 0 |
2012-12-21 | Multi-Stage Fracture | 2765.40 | 2765.50 | 0 |
2012-12-21 | Multi-Stage Fracture | 2690.50 | 2690.60 | 0 |
2012-12-21 | Multi-Stage Fracture | 2615.60 | 2615.70 | 0 |
2012-12-21 | Multi-Stage Fracture | 2554.80 | 2554.90 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 240 | 0.0 | 0.0 | 0.0 |
2013 | 7342 | 0.0 | 0.0 | 0.0 |
2014 | 7481 | 0.0 | 0.0 | 0.0 |
2015 | 7739 | 0.0 | 0.0 | 0.0 |
2016 | 8594 | 0.0 | 0.0 | 0.0 |
2017 | 8607 | 0.0 | 0.0 | 0.0 |
2018 | 8381 | 0.0 | 0.0 | 0.0 |
2019 | 8469 | 0.0 | 0.0 | 0.0 |
2020 | 2117 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-12-10 | No Incident Encountered | 0.00 | 0.00 |
2013-01-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]