If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505121015000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.304482,"lon":-115.632983,"icon":""}]} |
Location: 00/15-10-050-12W5/0 | |
Location Alias: 00/15-10-50-12 W5M | |
Location Alias 2: 00/15-10-050-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 12 | |
Section: 10 | |
County/Municipality: Yellowhead County | |
Well Name: VERMILION HZ PEMBINA 15-10-50-12 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0446534 | |
License Date: 2012-06-14 | |
License Status: Issued | |
Spud Date: 2012-08-15 | |
Final Drill Date: 2012-08-26 | |
Well Total Depth: 4366.00 m | |
Surface Hole Latitude: 53.304482 | |
Surface Hole Longitude: -115.632983 |
Date | Event |
---|---|
2012-06-14 | Obtained License |
2012-08-17 | Surface Casing Operation Performed |
2012-08-18 | Direction Drilling Operation Performed - Deviate |
2012-08-18 | Well Log Performed |
2012-08-20 | Direction Drilling Operation Performed - Horizontal |
2012-08-26 | Finished Drilling |
2012-08-26 | Well Mode changed to Drilled and Cased |
2012-08-28 | Production Casing Operation Performed |
2012-08-29 | Rig Released |
2012-09-01 | Well Began Production |
2012-09-01 | Well Fluid changed to Crude Oil |
2012-09-01 | Well Mode changed to Pumping |
2012-09-19 | Perforation Treatment Performed - Open-Hole Completion |
2012-09-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-09-22 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-08-15 | Ironhand Drilling Inc. | 6 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-08-18 | 1315.00 | Deviate (5 - 79 degrees) |
2012-08-20 | 2000.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-09-19 | Open Hole/Barefoot Completion | 4361.00 | 4366.00 | 0 |
2012-09-20 | Multi-Stage Fracture | 4336.90 | 4337.00 | 0 |
2012-09-21 | Multi-Stage Fracture | 4248.50 | 4248.60 | 0 |
2012-09-21 | Multi-Stage Fracture | 4142.30 | 4142.40 | 0 |
2012-09-21 | Multi-Stage Fracture | 4036.00 | 4036.10 | 0 |
2012-09-21 | Multi-Stage Fracture | 3930.00 | 3930.10 | 0 |
2012-09-21 | Multi-Stage Fracture | 3823.80 | 3823.90 | 0 |
2012-09-21 | Multi-Stage Fracture | 3717.10 | 3717.20 | 0 |
2012-09-22 | Multi-Stage Fracture | 3610.70 | 3610.80 | 0 |
2012-09-22 | Multi-Stage Fracture | 3508.30 | 3508.40 | 0 |
2012-09-22 | Multi-Stage Fracture | 3396.90 | 3397.00 | 0 |
2012-09-22 | Multi-Stage Fracture | 3292.10 | 3292.20 | 0 |
2012-09-22 | Multi-Stage Fracture | 3185.40 | 3185.50 | 0 |
2012-09-22 | Multi-Stage Fracture | 3079.10 | 3079.20 | 0 |
2012-09-22 | Multi-Stage Fracture | 2936.00 | 2936.10 | 0 |
2012-09-22 | Multi-Stage Fracture | 2856.00 | 2856.10 | 0 |
2012-09-22 | Multi-Stage Fracture | 2762.40 | 2762.50 | 0 |
2012-09-22 | Multi-Stage Fracture | 2652.30 | 2652.40 | 0 |
2012-09-22 | Multi-Stage Fracture | 2542.40 | 2542.50 | 0 |
2012-09-22 | Multi-Stage Fracture | 2437.40 | 2437.50 | 0 |
2012-09-22 | Multi-Stage Fracture | 2331.70 | 2331.80 | 0 |
2012-09-22 | Multi-Stage Fracture | 2225.50 | 2225.60 | 0 |
2012-09-22 | Multi-Stage Fracture | 2106.50 | 2106.60 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1851 | 0.0 | 0.0 | 0.0 |
2013 | 8608 | 0.0 | 0.0 | 0.0 |
2014 | 7894 | 0.0 | 0.0 | 0.0 |
2015 | 8706 | 0.0 | 0.0 | 0.0 |
2016 | 8300 | 0.0 | 0.0 | 0.0 |
2017 | 8553 | 0.0 | 0.0 | 0.0 |
2018 | 8498 | 0.0 | 0.0 | 0.0 |
2019 | 8585 | 0.0 | 0.0 | 0.0 |
2020 | 1635 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-29 | No Incident Encountered | 0.00 | 0.00 |
2012-09-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]