If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0354243507004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.046985,"lon":-113.321333,"icon":""}]} |
Location: 00/07-35-035-24W4/4 | |
Location Alias: 00/07-35-35-24 W4M | |
Location Alias 2: 00/07-35-035-24 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 035 | |
Meridian: 4 | |
Range: 24 | |
Section: 35 | |
County/Municipality: Red Deer County | |
Well Name: EMBER HUXLEY 7-35-35-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0420564 | |
License Date: 2010-05-20 | |
License Status: Issued | |
Spud Date: 2010-09-04 | |
Final Drill Date: 2010-10-06 | |
Well Total Depth: 973.00 m | |
Surface Hole Latitude: 52.046985 | |
Surface Hole Longitude: -113.321333 |
Date | Event |
---|---|
2010-05-20 | Obtained License |
2010-09-04 | Surface Casing Operation Performed |
2010-10-06 | Finished Drilling |
2010-10-06 | Production Casing Operation Performed |
2010-10-06 | Rig Released |
2010-10-06 | Well Mode changed to Drilled and Cased |
2010-10-14 | Well Log Performed |
2010-11-23 | Perforation Treatment Performed - Jet Perforation |
2010-12-02 | Perforation Treatment Performed - Jet Perforation |
2010-12-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-12-11 | Plug Back Performed |
2010-12-12 | Perforation Treatment Performed - Jet Perforation |
2010-12-27 | Perforation Treatment Performed - Jet Perforation |
2011-01-06 | Perforation Treatment Performed - Jet Perforation |
2011-01-10 | Perforation Treatment Performed - Fractured |
2011-01-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-01-17 | Well Mode changed to Testing |
2011-02-11 | Well Began Production |
2011-02-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-11 | Well Mode changed to Flowing |
2011-03-03 | Well Log Performed |
2011-03-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-03-07 | Plug Back Performed |
2017-03-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
2017-03-07 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-23 | Perforation | 952.50 | 956.00 | 13 |
2010-12-02 | Perforation | 885.00 | 886.00 | 13 |
2010-12-02 | Perforation | 900.50 | 901.50 | 13 |
2010-12-02 | Perforation | 926.00 | 927.00 | 13 |
2010-12-11 | Packing Device Capped w/Cement | 915.00 | 923.50 | 0 |
2010-12-12 | Perforation | 746.50 | 747.50 | 13 |
2010-12-12 | Perforation | 710.00 | 712.00 | 13 |
2010-12-12 | Perforation | 679.50 | 680.50 | 13 |
2010-12-12 | Perforation | 853.50 | 854.50 | 13 |
2010-12-12 | Perforation | 791.50 | 792.50 | 13 |
2010-12-12 | Perforation | 769.00 | 770.00 | 13 |
2010-12-27 | Perforation | 408.00 | 409.50 | 13 |
2010-12-27 | Perforation | 419.00 | 420.50 | 13 |
2010-12-27 | Perforation | 433.00 | 435.00 | 13 |
2010-12-27 | Perforation | 357.50 | 358.50 | 13 |
2010-12-27 | Perforation | 363.40 | 364.40 | 13 |
2010-12-27 | Perforation | 393.40 | 394.90 | 13 |
2010-12-27 | Perforation | 437.00 | 438.00 | 13 |
2010-12-27 | Perforation | 457.40 | 459.90 | 13 |
2010-12-27 | Perforation | 472.00 | 473.00 | 13 |
2010-12-27 | Perforation | 475.00 | 476.00 | 13 |
2010-12-27 | Perforation | 443.00 | 444.00 | 13 |
2010-12-27 | Perforation | 446.40 | 447.40 | 13 |
2010-12-27 | Perforation | 450.00 | 453.00 | 13 |
2010-12-27 | Perforation | 280.00 | 281.00 | 13 |
2010-12-27 | Perforation | 282.00 | 283.00 | 13 |
2010-12-27 | Perforation | 284.50 | 285.50 | 13 |
2010-12-27 | Perforation | 257.00 | 258.00 | 13 |
2010-12-27 | Perforation | 261.00 | 263.00 | 13 |
2010-12-27 | Perforation | 273.50 | 275.00 | 13 |
2010-12-27 | Perforation | 294.00 | 295.00 | 13 |
2010-12-27 | Perforation | 339.00 | 340.50 | 13 |
2010-12-27 | Perforation | 349.00 | 350.00 | 13 |
2010-12-27 | Perforation | 351.50 | 352.50 | 13 |
2010-12-27 | Perforation | 297.00 | 298.00 | 13 |
2010-12-27 | Perforation | 309.00 | 310.00 | 13 |
2010-12-27 | Perforation | 320.50 | 321.50 | 13 |
2010-12-27 | Perforation | 556.50 | 559.00 | 13 |
2010-12-27 | Perforation | 534.00 | 536.50 | 13 |
2010-12-27 | Perforation | 573.50 | 575.00 | 13 |
2010-12-27 | Perforation | 585.00 | 586.00 | 13 |
2010-12-27 | Perforation | 579.50 | 580.50 | 13 |
2010-12-27 | Perforation | 530.00 | 532.00 | 13 |
2010-12-27 | Perforation | 488.00 | 489.50 | 13 |
2010-12-27 | Perforation | 479.00 | 480.00 | 13 |
2010-12-27 | Perforation | 489.00 | 490.00 | 13 |
2010-12-27 | Perforation | 513.00 | 514.00 | 13 |
2010-12-27 | Perforation | 504.00 | 505.00 | 13 |
2011-01-06 | Perforation | 576.70 | 577.70 | 13 |
2011-01-06 | Perforation | 564.30 | 565.30 | 13 |
2011-01-06 | Perforation | 540.50 | 543.50 | 13 |
2011-01-06 | Perforation | 588.80 | 589.80 | 13 |
2011-01-06 | Perforation | 620.50 | 621.50 | 13 |
2011-01-06 | Perforation | 612.90 | 614.40 | 13 |
2011-01-06 | Perforation | 605.20 | 606.70 | 13 |
2011-01-06 | Perforation | 476.60 | 477.60 | 13 |
2011-01-06 | Perforation | 467.20 | 468.20 | 13 |
2011-01-06 | Perforation | 405.70 | 406.20 | 13 |
2011-01-06 | Perforation | 522.10 | 524.10 | 13 |
2011-01-06 | Perforation | 491.90 | 493.90 | 13 |
2011-01-06 | Perforation | 484.20 | 485.20 | 13 |
2011-01-10 | Fracture | 257.00 | 586.00 | 0 |
2011-01-10 | Fracture | 405.70 | 614.40 | 0 |
2011-01-10 | Fracture | 620.00 | 621.50 | 0 |
2011-03-07 | Packing Device Capped w/Cement | 665.00 | 673.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7794 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8746 | 0.0 | 0.0 | 0.0 |
2014 | 8682 | 0.0 | 0.0 | 0.0 |
2015 | 8752 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8015 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]