X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0294241506000"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0294241506000
 
| Well ID: 0294241506000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 51.47835800000001427, -113.29904999999996562 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 51.478358, -113.299050 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/06-15-029-24W4/0
 
| Location: 00/06-15-029-24W4/0
 +
|-
 +
| Location Alias: 00/06-15-29-24 W4M
 +
|-
 +
| Location Alias 2: 00/06-15-029-24 W4/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 029
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 24
 +
|-
 +
| Section: 15
 +
|-
 +
| County/Municipality: [[Kneehill County,_Alberta|Kneehill County]]
 
|-
 
|-
 
| Well Name: PIONEER SWALWELL 6-15-29-24
 
| Well Name: PIONEER SWALWELL 6-15-29-24
 +
|-
 +
| Operator Name: [[TAQA North Ltd.]]
 +
|-
 +
| License Number: 0130893
 
|-
 
|-
 
| License Date: 1987-12-30
 
| License Date: 1987-12-30
 
|-
 
|-
| Final Drilling Date: 1988-01-24
+
| License Status: Abandoned
 +
|-
 +
| Spud Date: 1988-01-10
 +
|-
 +
| Final Drill Date: 1988-01-24
 +
|-
 +
| Well Total Depth: 2068.00 m
 +
|-
 +
| Surface Hole Latitude: 51.478358
 +
|-
 +
| Surface Hole Longitude: -113.299050
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1987-12-30
 +
| Obtained License
 +
|-
 +
| 1988-01-11
 +
| Surface Casing Operation Performed
 +
|-
 +
| 1988-01-24
 +
| Finished Drilling
 +
|-
 +
| 1988-01-24
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1988-01-25
 +
| Well Log Performed
 +
|-
 +
| 1988-01-26
 +
| Production Casing Operation Performed
 +
|-
 +
| 1988-01-27
 +
| Rig Released
 +
|-
 +
| 1988-02-13
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1988-02-13
 +
| Well Log Performed
 +
|-
 +
| 1988-03-01
 +
| Well Began Production
 +
|-
 +
| 1988-03-01
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1988-03-01
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1992-11-08
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1992-11-08
 +
| Well Mode changed to Pumping
 +
|-
 +
| 2008-06-29
 +
| Well Log Performed
 +
|-
 +
| 2008-09-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-09-30
 +
| Well Log Performed
 +
|-
 +
| 2008-10-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2008-10-02
 +
| Well Log Performed
 +
|-
 +
| 2008-10-03
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2008-10-04
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2008-10-04
 +
| Plug Back Performed
 +
|-
 +
| 2008-10-04
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2008-10-04
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2008-10-20
 +
| Well Abandoned
 +
|-
 +
| 2008-10-20
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2008-10-20
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1988-02-13
 +
| Perforation
 +
| style="text-align: right;" | 1988.50
 +
| style="text-align: right;" | 1990.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-10-03
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 429.00
 +
| style="text-align: right;" | 430.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2008-10-03
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 364.00
 +
| style="text-align: right;" | 365.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2008-10-04
 +
| Cement Plug
 +
| style="text-align: right;" | 310.10
 +
| style="text-align: right;" | 674.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2008-09-30
 +
| Perforation
 +
| style="text-align: right;" | 565.00
 +
| style="text-align: right;" | 566.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-10-02
 +
| Perforation
 +
| style="text-align: right;" | 525.00
 +
| style="text-align: right;" | 526.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 2008-10-02
 +
| Perforation
 +
| style="text-align: right;" | 481.00
 +
| style="text-align: right;" | 482.00
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Total Depth: 2068.0m
+
| 2008-10-02
 +
| Perforation
 +
| style="text-align: right;" | 429.00
 +
| style="text-align: right;" | 430.00
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 2008-10-02
 +
| Perforation
 +
| style="text-align: right;" | 364.00
 +
| style="text-align: right;" | 365.00
 +
| style="text-align: right;" | 13
 
|-
 
|-
| Status: Abandoned
+
| 2008-10-03
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 565.00
 +
| style="text-align: right;" | 566.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 2008-10-03
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 525.00
 +
| style="text-align: right;" | 526.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Vertical
+
| 2008-10-03
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 481.00
 +
| style="text-align: right;" | 482.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 51.47835800000001427
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
| Longitude: -113.29904999999996562
+
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
 +
|}-->
  
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 1988
 +
| style="text-align: right;" | 4205
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1989
 +
| style="text-align: right;" | 2256
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1990
 +
| style="text-align: right;" | 2411
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1991
 +
| style="text-align: right;" | 3479
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1992
 +
| style="text-align: right;" | 554
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 1993
 +
| style="text-align: right;" | 677
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 07:27, 30 January 2021

Well Details

Well ID: 0294241506000
Loading map...
Location: 00/06-15-029-24W4/0
Location Alias: 00/06-15-29-24 W4M
Location Alias 2: 00/06-15-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 15
County/Municipality: Kneehill County
Well Name: PIONEER SWALWELL 6-15-29-24
Operator Name: TAQA North Ltd.
License Number: 0130893
License Date: 1987-12-30
License Status: Abandoned
Spud Date: 1988-01-10
Final Drill Date: 1988-01-24
Well Total Depth: 2068.00 m
Surface Hole Latitude: 51.478358
Surface Hole Longitude: -113.299050

For data sources see[1][2]

Well History

Date Event
1987-12-30 Obtained License
1988-01-11 Surface Casing Operation Performed
1988-01-24 Finished Drilling
1988-01-24 Well Mode changed to Drilled and Cased
1988-01-25 Well Log Performed
1988-01-26 Production Casing Operation Performed
1988-01-27 Rig Released
1988-02-13 Perforation Treatment Performed - Jet Perforation
1988-02-13 Well Log Performed
1988-03-01 Well Began Production
1988-03-01 Well Fluid changed to Crude Oil
1988-03-01 Well Mode changed to Flowing
1992-11-08 Well Fluid changed to Crude Oil
1992-11-08 Well Mode changed to Pumping
2008-06-29 Well Log Performed
2008-09-30 Perforation Treatment Performed - Jet Perforation
2008-09-30 Well Log Performed
2008-10-02 Perforation Treatment Performed - Jet Perforation
2008-10-02 Well Log Performed
2008-10-03 Perforation Treatment Performed - Remedial Casing
2008-10-04 Perforation Treatment Performed - Cement Plug
2008-10-04 Plug Back Performed
2008-10-04 Well Fluid changed to Crude Oil
2008-10-04 Well Mode changed to Abandoned Zone
2008-10-20 Well Abandoned
2008-10-20 Well Fluid changed to Crude Oil
2008-10-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-02-13 Perforation 1988.50 1990.00 13
2008-10-03 Remedial Casing Cementing 429.00 430.00 0
2008-10-03 Remedial Casing Cementing 364.00 365.00 0
2008-10-04 Cement Plug 310.10 674.20 0
2008-09-30 Perforation 565.00 566.00 13
2008-10-02 Perforation 525.00 526.00 13
2008-10-02 Perforation 481.00 482.00 13
2008-10-02 Perforation 429.00 430.00 13
2008-10-02 Perforation 364.00 365.00 13
2008-10-03 Remedial Casing Cementing 565.00 566.00 0
2008-10-03 Remedial Casing Cementing 525.00 526.00 0
2008-10-03 Remedial Casing Cementing 481.00 482.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 4205 0.0 0.0 0.0
1989 2256 0.0 0.0 0.0
1990 2411 0.0 0.0 0.0
1991 3479 0.0 0.0 0.0
1992 554 0.0 0.0 0.0
1993 677 0.0 0.0 0.0

For data sources see[5]

References