If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404152814003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.475974,"lon":-112.108336,"icon":""}]} |
Location: 00/14-28-040-15W4/3 | |
Location Alias: 00/14-28-40-15 W4M | |
Location Alias 2: 00/14-28-040-15 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 15 | |
Section: 28 | |
County/Municipality: Flagstaff County | |
Well Name: TIV 14C GALAHAD 14-28-40-15 | |
Operator Name: Prairie Provident Resources Canada Ltd. | |
License Number: 0310112 | |
License Date: 2004-06-11 | |
License Status: Suspension | |
Spud Date: 2004-06-23 | |
Final Drill Date: 2004-06-26 | |
Well Total Depth: 1135.00 m | |
Surface Hole Latitude: 52.475974 | |
Surface Hole Longitude: -112.108336 |
Date | Event |
---|---|
2004-06-11 | Obtained License |
2004-06-24 | Surface Casing Operation Performed |
2004-06-26 | Finished Drilling |
2004-06-26 | Well Log Performed |
2004-06-26 | Well Mode changed to Drilled and Cased |
2004-06-27 | Production Casing Operation Performed |
2004-06-27 | Rig Released |
2004-07-09 | Perforation Treatment Performed - Jet Perforation |
2004-07-09 | Well Log Performed |
2004-11-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-11-25 | Plug Back Performed |
2004-11-26 | Perforation Treatment Performed - Jet Perforation |
2005-05-24 | Perforation Treatment Performed - Jet Perforation |
2005-07-07 | Well Began Production |
2005-07-07 | Well Fluid changed to Crude Oil |
2005-07-07 | Well Mode changed to Pumping |
2015-01-31 | Well Fluid changed to Crude Oil |
2015-01-31 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-07-09 | Perforation | 1064.50 | 1065.50 | 20 |
2004-11-25 | Packing Device Capped w/Cement | 1056.00 | 1064.00 | 0 |
2004-11-26 | Perforation | 1042.00 | 1043.50 | 20 |
2005-05-24 | Perforation | 1031.00 | 1033.00 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 2999 | 0.0 | 0.0 | 0.0 |
2006 | 4366 | 0.0 | 0.0 | 0.0 |
2007 | 3934 | 0.0 | 0.0 | 0.0 |
2008 | 7773 | 0.0 | 0.0 | 0.0 |
2009 | 7087 | 0.0 | 0.0 | 0.0 |
2010 | 7099 | 0.0 | 0.0 | 0.0 |
2011 | 6922 | 0.0 | 0.0 | 0.0 |
2012 | 7539 | 0.0 | 0.0 | 0.0 |
2013 | 6044 | 0.0 | 0.0 | 0.0 |
2014 | 309 | 0.0 | 0.0 | 0.0 |
For data sources see[5]