X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434223101000

Well Details

Well ID: 0434223101000
Loading map...
Location: 00/01-31-043-22W4/0
Location Alias: 00/01-31-43-22 W4M
Location Alias 2: 00/01-31-043-22 W4/00
Province: Alberta
County/Municipality: Ponoka County
Well Name: EMBER MALMO 1-31-43-22
Operator Name: Ember Resources Inc.
License Number: 0326189
License Date: 2005-02-11
License Status: Issued
Spud Date: 2005-02-17
Final Drill Date: 2005-02-19
Well Total Depth: 515.8 m
Surface Hole Latitude: 52.744786
Surface Hole Longitude: -113.177331

For data sources see[1][2]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-03-07 Perforation 215.8 216.2 7
2005-03-07 Perforation 227.8 228.7 7
2005-03-07 Perforation 235 235.8 7
2005-03-07 Perforation 242 242.4 7
2005-03-07 Perforation 249.8 251 7
2005-03-07 Perforation 256 257.7 7
2005-03-07 Perforation 270.9 271.8 7
2005-03-07 Perforation 276 277.2 7
2005-03-07 Perforation 281.2 281.7 7
2005-03-07 Perforation 293.8 294.2 7
2005-03-07 Perforation 306 306.4 7
2005-03-07 Perforation 314.7 315.3 7
2005-03-07 Perforation 319.8 320.3 7
2005-03-07 Perforation 325.2 325.7 7
2005-03-07 Perforation 330.7 331.2 7
2005-03-07 Perforation 219.7 220.7 7
2005-03-07 Perforation 237.8 239 7
2005-03-07 Perforation 244.2 244.9 7
2005-03-07 Perforation 259.5 260.7 7
2005-03-07 Perforation 273.3 274.8 7
2005-03-07 Perforation 282.5 284.2 7
2005-03-07 Perforation 307.5 308 7
2005-03-07 Perforation 309 309.4 7
2005-03-07 Perforation 327.6 328 7
2005-12-03 Fracture 330.7 331.2 0
2005-12-03 Fracture 327.6 328 0
2005-12-03 Fracture 325.2 325.7 0
2005-12-03 Fracture 319.8 320.3 0
2005-12-03 Fracture 314.7 315.3 0
2005-12-03 Fracture 309 309.4 0
2005-12-03 Fracture 307.5 308 0
2005-12-03 Fracture 306 306.4 0
2005-12-03 Fracture 293.8 294.2 0
2005-12-03 Fracture 282.5 284.2 0
2005-12-03 Fracture 281.2 281.7 0
2005-12-03 Fracture 276 277.2 0
2005-12-03 Fracture 273.3 274.8 0
2005-12-03 Fracture 270.9 271.8 0
2005-12-03 Fracture 259.5 260.7 0
2005-12-03 Fracture 256 257.7 0
2005-12-03 Fracture 249.8 251 0
2005-12-03 Fracture 244.2 244.9 0
2005-12-03 Fracture 242 242.4 0
2005-12-03 Fracture 237.8 239 0
2005-12-03 Fracture 235 235.8 0
2005-12-03 Fracture 227.8 228.7 0
2005-12-03 Fracture 219.7 220.7 0
2005-12-03 Fracture 215.8 216.2 0

For data sources see[3]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 586 129.5 0.0 0.0
2006 8657 1425.7 0.0 0.0
2007 8664 995.9 0.0 3.4
2008 8617 725.1 0.0 2.8
2009 8398 513.8 0.0 2.7
2010 8388 437.5 0.0 0.0
2011 8052 368.9 0.0 2.7
2012 8749 314.5 0.0 4.4
2013 8759 275.4 0.0 4.1
2014 8655 229.3 0.0 3.6
2015 8725 258.8 0.0 1.7
2016 8154 247.4 0.0 2.3
2017 7829 206.6 0.0 1.0
2018 8663 221.0 0.0 0.0
2019 881 16.3 0.0 0.0

For data sources see[4]

References