X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0444221412002"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0444221412002
 
| Well ID: 0444221412002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 52.794024, -113.096136 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 52.794024, -113.096136 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/12-14-044-22W4/2
 
| Location: 00/12-14-044-22W4/2
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/12-14-044-22 W4/02
 
| Location Alias 2: 00/12-14-044-22 W4/02
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 044
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 22
 +
|-
 +
| Section: 14
 
|-
 
|-
 
| County/Municipality: [[County of Wetaskiwin No. 10,_Alberta|County of Wetaskiwin No. 10]]
 
| County/Municipality: [[County of Wetaskiwin No. 10,_Alberta|County of Wetaskiwin No. 10]]
Line 17: Line 27:
 
| Well Name: CNRL ET AL MALMO 12-14-44-22
 
| Well Name: CNRL ET AL MALMO 12-14-44-22
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Canadian Natural Resources Limited]]
 
|-
 
|-
 
| License Number: 0004931
 
| License Number: 0004931
Line 29: Line 39:
 
| Final Drill Date: 1952-08-03
 
| Final Drill Date: 1952-08-03
 
|-
 
|-
| Well Total Depth: 1618.5 m
+
| Well Total Depth: 1618.50 m
 
|-
 
|-
 
| Surface Hole Latitude: 52.794024
 
| Surface Hole Latitude: 52.794024
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1952-07-03
 +
| Obtained License
 +
|-
 +
| 1952-08-01
 +
| Liner Casing Operation Performed
 +
|-
 +
| 1952-08-03
 +
| Drill Stem Test Performed
 +
|-
 +
| 1952-08-03
 +
| Finished Drilling
 +
|-
 +
| 1952-08-03
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1952-08-08
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1952-08-09
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1952-08-12
 +
| Well Began Production
 +
|-
 +
| 1952-08-12
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1952-08-12
 +
| Well Mode changed to Flowing
 +
|-
 +
| 1953-09-05
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1953-09-05
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1953-09-05
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 1953-09-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1953-09-09
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1953-09-12
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1953-09-19
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1966-01-29
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1989-11-29
 +
| Well Log Performed
 +
|-
 +
| 1989-12-01
 +
| Well Log Performed
 +
|-
 +
| 1989-12-02
 +
| Well Log Performed
 +
|-
 +
| 1990-05-16
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1990-05-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1990-05-25
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1990-05-25
 +
| Well Log Performed
 +
|-
 +
| 1990-05-26
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1990-05-26
 +
| Well Log Performed
 +
|-
 +
| 1992-03-03
 +
| Well Log Performed
 +
|-
 +
| 1992-03-04
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-04-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1998-04-20
 +
| Well Log Performed
 +
|-
 +
| 2003-07-10
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2003-07-10
 +
| Plug Back Performed
 +
|-
 +
| 2003-07-10
 +
| Well Log Performed
 +
|-
 +
| 2003-07-11
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2005-08-13
 +
| Well Log Performed
 +
|-
 +
| 2005-08-14
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2005-08-14
 +
| Plug Back Performed
 +
|-
 +
| 2005-08-15
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2005-08-15
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2005-08-15
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2005-09-02
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 225:
 
| 1952-08-08
 
| 1952-08-08
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1555.7
+
| style="text-align: right;" | 1555.70
| style="text-align: right;" | 1557.2
+
| style="text-align: right;" | 1557.20
| style="text-align: right;" | 13
 
|-
 
| 1952-08-09
 
| Bullet Perforation
 
| style="text-align: right;" | 1608.4
 
| style="text-align: right;" | 1610.9
 
| style="text-align: right;" | 13
 
|-
 
| 1953-09-05
 
| Cement Squeeze
 
| style="text-align: right;" | 1555.7
 
| style="text-align: right;" | 1557.2
 
| style="text-align: right;" | 0
 
|-
 
| 1953-09-06
 
| Perforation
 
| style="text-align: right;" | 1439
 
| style="text-align: right;" | 1439.9
 
| style="text-align: right;" | 13
 
|-
 
| 1953-09-09
 
| Cement Squeeze
 
| style="text-align: right;" | 1439
 
| style="text-align: right;" | 1439.9
 
| style="text-align: right;" | 0
 
|-
 
| 1953-09-12
 
| Perforation
 
| style="text-align: right;" | 1439.9
 
| style="text-align: right;" | 1440.5
 
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
|-
 
| 1953-09-19
 
| Cement Squeeze
 
| style="text-align: right;" | 1555.7
 
| style="text-align: right;" | 1557.2
 
| style="text-align: right;" | 0
 
|-
 
| 1966-01-29
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 1566.7
 
| style="text-align: right;" | 1566.7
 
| style="text-align: right;" | 0
 
|-
 
| 1990-05-16
 
| Cement Squeeze
 
| style="text-align: right;" | 1439.9
 
| style="text-align: right;" | 1440.5
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
| 1990-05-23
 
| 1990-05-23
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1608.4
+
| style="text-align: right;" | 1608.40
| style="text-align: right;" | 1610.9
+
| style="text-align: right;" | 1610.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1990-05-25
 
| 1990-05-25
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1598
+
| style="text-align: right;" | 1598.00
| style="text-align: right;" | 1609
+
| style="text-align: right;" | 1609.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1990-05-26
 
| 1990-05-26
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1596.5
+
| style="text-align: right;" | 1596.50
| style="text-align: right;" | 1597.8
+
| style="text-align: right;" | 1597.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1992-03-04
 
| 1992-03-04
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1593.5
+
| style="text-align: right;" | 1593.50
| style="text-align: right;" | 1594.7
+
| style="text-align: right;" | 1594.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1998-04-20
 
| 1998-04-20
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1589.5
+
| style="text-align: right;" | 1589.50
| style="text-align: right;" | 1591.5
+
| style="text-align: right;" | 1591.50
 
| style="text-align: right;" | 18
 
| style="text-align: right;" | 18
 
|-
 
|-
 
| 2003-07-10
 
| 2003-07-10
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1567
+
| style="text-align: right;" | 1567.00
| style="text-align: right;" | 1575
+
| style="text-align: right;" | 1575.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003-07-10
 
| 2003-07-10
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1544
+
| style="text-align: right;" | 1544.00
| style="text-align: right;" | 1552
+
| style="text-align: right;" | 1552.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003-07-11
 
| 2003-07-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1429.5
+
| style="text-align: right;" | 1429.50
| style="text-align: right;" | 1431.5
+
| style="text-align: right;" | 1431.50
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2003-07-11
 
| 2003-07-11
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1434
+
| style="text-align: right;" | 1434.00
| style="text-align: right;" | 1435.6
+
| style="text-align: right;" | 1435.60
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2005-08-14
 
| 2005-08-14
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1417
+
| style="text-align: right;" | 1417.00
| style="text-align: right;" | 1425
+
| style="text-align: right;" | 1425.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
|-
 +
| 1952-08-09
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1608.40
 +
| style="text-align: right;" | 1610.90
 +
| style="text-align: right;" | 13
 
|-
 
|-
 
| 2005-08-15
 
| 2005-08-15
 
| Perforation
 
| Perforation
| style="text-align: right;" | 355
+
| style="text-align: right;" | 355.00
| style="text-align: right;" | 356
+
| style="text-align: right;" | 356.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2005-08-15
 
| 2005-08-15
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 355
+
| style="text-align: right;" | 355.00
| style="text-align: right;" | 356
+
| style="text-align: right;" | 356.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005-08-15
 
| 2005-08-15
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 276
+
| style="text-align: right;" | 276.00
| style="text-align: right;" | 359
+
| style="text-align: right;" | 359.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1953-09-05
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1555.70
 +
| style="text-align: right;" | 1557.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1953-09-06
 +
| Perforation
 +
| style="text-align: right;" | 1439.00
 +
| style="text-align: right;" | 1439.90
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1953-09-09
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1439.00
 +
| style="text-align: right;" | 1439.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1953-09-12
 +
| Perforation
 +
| style="text-align: right;" | 1439.90
 +
| style="text-align: right;" | 1440.50
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1953-09-19
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1555.70
 +
| style="text-align: right;" | 1557.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1966-01-29
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1566.70
 +
| style="text-align: right;" | 1566.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1990-05-16
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1439.90
 +
| style="text-align: right;" | 1440.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 208: Line 359:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 253: Line 418:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 19:08, 17 January 2021

Well Details

Well ID: 0444221412002
Loading map...
Location: 00/12-14-044-22W4/2
Location Alias: 00/12-14-44-22 W4M
Location Alias 2: 00/12-14-044-22 W4/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 22
Section: 14
County/Municipality: County of Wetaskiwin No. 10
Well Name: CNRL ET AL MALMO 12-14-44-22
Operator Name: Canadian Natural Resources Limited
License Number: 0004931
License Date: 1952-07-03
License Status: RecCertified
Spud Date: 1952-07-10
Final Drill Date: 1952-08-03
Well Total Depth: 1618.50 m
Surface Hole Latitude: 52.794024
Surface Hole Longitude: -113.096136

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-07-03 Obtained License
1952-08-01 Liner Casing Operation Performed
1952-08-03 Drill Stem Test Performed
1952-08-03 Finished Drilling
1952-08-03 Well Mode changed to Drilled and Cased
1952-08-08 Perforation Treatment Performed - Bullet Perforation
1952-08-09 Perforation Treatment Performed - Bullet Perforation
1952-08-12 Well Began Production
1952-08-12 Well Fluid changed to Crude Oil
1952-08-12 Well Mode changed to Flowing
1953-09-05 Perforation Treatment Performed - Cement Squeeze
1953-09-05 Well Fluid changed to Crude Oil
1953-09-05 Well Mode changed to Abandoned Zone
1953-09-06 Perforation Treatment Performed - Jet Perforation
1953-09-09 Perforation Treatment Performed - Cement Squeeze
1953-09-12 Perforation Treatment Performed - Jet Perforation
1953-09-19 Perforation Treatment Performed - Cement Squeeze
1966-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-11-29 Well Log Performed
1989-12-01 Well Log Performed
1989-12-02 Well Log Performed
1990-05-16 Perforation Treatment Performed - Cement Squeeze
1990-05-23 Perforation Treatment Performed - Jet Perforation
1990-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-05-25 Well Log Performed
1990-05-26 Perforation Treatment Performed - Jet Perforation
1990-05-26 Well Log Performed
1992-03-03 Well Log Performed
1992-03-04 Perforation Treatment Performed - Jet Perforation
1998-04-20 Perforation Treatment Performed - Jet Perforation
1998-04-20 Well Log Performed
2003-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-10 Plug Back Performed
2003-07-10 Well Log Performed
2003-07-11 Perforation Treatment Performed - Jet Perforation
2005-08-13 Well Log Performed
2005-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-08-14 Plug Back Performed
2005-08-15 Perforation Treatment Performed - Cement Plug
2005-08-15 Perforation Treatment Performed - Jet Perforation
2005-08-15 Perforation Treatment Performed - Remedial Casing
2005-09-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-08-08 Bullet Perforation 1555.70 1557.20 13
1990-05-23 Perforation 1608.40 1610.90 13
1990-05-25 Packing Device Capped w/Cement 1598.00 1609.00 0
1990-05-26 Perforation 1596.50 1597.80 13
1992-03-04 Perforation 1593.50 1594.70 13
1998-04-20 Perforation 1589.50 1591.50 18
2003-07-10 Packing Device Capped w/Cement 1567.00 1575.00 0
2003-07-10 Packing Device Capped w/Cement 1544.00 1552.00 0
2003-07-11 Perforation 1429.50 1431.50 20
2003-07-11 Perforation 1434.00 1435.60 20
2005-08-14 Packing Device Capped w/Cement 1417.00 1425.00 0
1952-08-09 Bullet Perforation 1608.40 1610.90 13
2005-08-15 Perforation 355.00 356.00 20
2005-08-15 Remedial Casing Cementing 355.00 356.00 0
2005-08-15 Cement Plug 276.00 359.00 0
1953-09-05 Cement Squeeze 1555.70 1557.20 0
1953-09-06 Perforation 1439.00 1439.90 13
1953-09-09 Cement Squeeze 1439.00 1439.90 0
1953-09-12 Perforation 1439.90 1440.50 13
1953-09-19 Cement Squeeze 1555.70 1557.20 0
1966-01-29 Packing Device Capped w/Cement 1566.70 1566.70 0
1990-05-16 Cement Squeeze 1439.90 1440.50 0

For data sources see[4]



References