X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0495121516030"

m
 
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0495121516030
 
| Well ID: 0495121516030
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.2342388, -115.662575 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.232790, -115.687475 | width=100% | height=100% }}
 
|-
 
|-
| Well Name: PBN ET AL 103 PEMBINA 16-15-49-12
+
| Location: 03/16-15-049-12W5/0
 
|-
 
|-
| Operator:
+
| Location Alias: 03/16-15-49-12 W5M
 +
|-
 +
| Location Alias 2: 03/16-15-049-12 W5/00
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 049
 +
|-
 +
| Meridian: 5
 +
|-
 +
| Range: 12
 +
|-
 +
| Section: 15
 +
|-
 +
| County/Municipality: [[Yellowhead County,_Alberta|Yellowhead County]]
 +
|-
 +
| Well Name: RIDGEBACK PEMBINA 16-15-49-12
 +
|-
 +
| Operator Name: [[Ridgeback Resources Inc.]]
 +
|-
 +
| License Number: 0445999
 
|-
 
|-
 
| License Date: 2012-05-22
 
| License Date: 2012-05-22
 
|-
 
|-
| Final Drilling Date: 2012-07-21
+
| License Status: Issued
 +
|-
 +
| Spud Date: 2012-07-09
 +
|-
 +
| Final Drill Date: 2012-07-21
 +
|-
 +
| Well Total Depth: 3502.00 m
 +
|-
 +
| Surface Hole Latitude: 53.232790
 +
|-
 +
| Surface Hole Longitude: -115.687475
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-05-22
 +
| Obtained License
 +
|-
 +
| 2012-07-10
 +
| Surface Casing Operation Performed
 +
|-
 +
| 2012-07-11
 +
| Well Log Performed
 +
|-
 +
| 2012-07-12
 +
| Direction Drilling Operation Performed - Deviate
 +
|-
 +
| 2012-07-13
 +
| Direction Drilling Operation Performed - Horizontal
 +
|-
 +
| 2012-07-19
 +
| Well Log Performed
 +
|-
 +
| 2012-07-21
 +
| Finished Drilling
 +
|-
 +
| 2012-07-21
 +
| Production Casing Operation Performed
 +
|-
 +
| 2012-07-21
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 2012-07-22
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 2012-07-22
 +
| Rig Released
 +
|-
 +
| 2012-08-16
 +
| Well Log Performed
 +
|-
 +
| 2012-08-30
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2012-08-31
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2012-09-01
 +
| Perforation Treatment Performed - Multi-Stage Fracture
 +
|-
 +
| 2012-09-02
 +
| Well Began Production
 +
|-
 +
| 2012-09-02
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2012-09-02
 +
| Well Mode changed to Pumping
 +
|-
 +
| 2012-09-10
 +
| Well Log Performed
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
| 2012-07-09
 +
| [[Ironhand Drilling Inc.]]
 +
| style="text-align: right;" | 3
 +
| style="text-align: right;" | N/A
 +
| Drill To LD
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =ST49: Daily Spud and Drilling Activity List
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-30
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-09 }}</ref>
 +
== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
| 2012-07-12
 +
| style="text-align: right;" | 1542.00
 +
| Deviate (5 - 79 degrees)
 +
|-
 +
| 2012-07-13
 +
| style="text-align: right;" | 2062.00
 +
| Horizontal
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Direction Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 2012-07-22
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 3498.00
 +
| style="text-align: right;" | 3502.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-31
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2935.60
 +
| style="text-align: right;" | 2935.70
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-31
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2860.90
 +
| style="text-align: right;" | 2861.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2799.00
 +
| style="text-align: right;" | 2799.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2724.10
 +
| style="text-align: right;" | 2724.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2663.80
 +
| style="text-align: right;" | 2663.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2590.00
 +
| style="text-align: right;" | 2590.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2529.30
 +
| style="text-align: right;" | 2529.40
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2455.10
 +
| style="text-align: right;" | 2455.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-09-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2394.50
 +
| style="text-align: right;" | 2394.60
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Total Depth: 3502.0m
+
| 2012-09-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2319.60
 +
| style="text-align: right;" | 2319.70
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Fluid Type: Crude Oil
+
| 2012-08-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3472.50
 +
| style="text-align: right;" | 3472.60
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Status: Pumping
+
| 2012-09-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2258.80
 +
| style="text-align: right;" | 2258.90
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Well Type: Not Applicable
+
| 2012-09-01
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2184.70
 +
| style="text-align: right;" | 2184.80
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Configuration: Horizontal
+
| 2012-08-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3405.60
 +
| style="text-align: right;" | 3405.70
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Violations:
+
| 2012-08-30
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3331.30
 +
| style="text-align: right;" | 3331.40
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Latitude: 53.2342388
+
| 2012-08-31
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3270.10
 +
| style="text-align: right;" | 3270.20
 +
| style="text-align: right;" | 0
 
|-
 
|-
| Longitude: -115.662575
+
| 2012-08-31
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3193.50
 +
| style="text-align: right;" | 3193.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-31
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3132.80
 +
| style="text-align: right;" | 3132.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-31
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 3071.80
 +
| style="text-align: right;" | 3071.90
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012-08-31
 +
| Multi-Stage Fracture
 +
| style="text-align: right;" | 2996.80
 +
| style="text-align: right;" | 2996.90
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2012
 +
| style="text-align: right;" | 2102
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2013
 +
| style="text-align: right;" | 8442
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2014
 +
| style="text-align: right;" | 8493
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2015
 +
| style="text-align: right;" | 8686
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2016
 +
| style="text-align: right;" | 8674
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2017
 +
| style="text-align: right;" | 8644
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2018
 +
| style="text-align: right;" | 8651
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2019
 +
| style="text-align: right;" | 8480
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2020
 +
| style="text-align: right;" | 2180
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2012-07-22
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
| 2012-09-11
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 10:40, 19 January 2021

Well Details

Well ID: 0495121516030
Loading map...
Location: 03/16-15-049-12W5/0
Location Alias: 03/16-15-49-12 W5M
Location Alias 2: 03/16-15-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 15
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 16-15-49-12
Operator Name: Ridgeback Resources Inc.
License Number: 0445999
License Date: 2012-05-22
License Status: Issued
Spud Date: 2012-07-09
Final Drill Date: 2012-07-21
Well Total Depth: 3502.00 m
Surface Hole Latitude: 53.232790
Surface Hole Longitude: -115.687475

For data sources see[1][2]

Well History

Date Event
2012-05-22 Obtained License
2012-07-10 Surface Casing Operation Performed
2012-07-11 Well Log Performed
2012-07-12 Direction Drilling Operation Performed - Deviate
2012-07-13 Direction Drilling Operation Performed - Horizontal
2012-07-19 Well Log Performed
2012-07-21 Finished Drilling
2012-07-21 Production Casing Operation Performed
2012-07-21 Well Mode changed to Drilled and Cased
2012-07-22 Perforation Treatment Performed - Open-Hole Completion
2012-07-22 Rig Released
2012-08-16 Well Log Performed
2012-08-30 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-31 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-01 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-02 Well Began Production
2012-09-02 Well Fluid changed to Crude Oil
2012-09-02 Well Mode changed to Pumping
2012-09-10 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-07-09 Ironhand Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-07-12 1542.00 Deviate (5 - 79 degrees)
2012-07-13 2062.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-22 Open Hole/Barefoot Completion 3498.00 3502.00 0
2012-08-31 Multi-Stage Fracture 2935.60 2935.70 0
2012-08-31 Multi-Stage Fracture 2860.90 2861.00 0
2012-09-01 Multi-Stage Fracture 2799.00 2799.10 0
2012-09-01 Multi-Stage Fracture 2724.10 2724.20 0
2012-09-01 Multi-Stage Fracture 2663.80 2663.90 0
2012-09-01 Multi-Stage Fracture 2590.00 2590.10 0
2012-09-01 Multi-Stage Fracture 2529.30 2529.40 0
2012-09-01 Multi-Stage Fracture 2455.10 2455.20 0
2012-09-01 Multi-Stage Fracture 2394.50 2394.60 0
2012-09-01 Multi-Stage Fracture 2319.60 2319.70 0
2012-08-30 Multi-Stage Fracture 3472.50 3472.60 0
2012-09-01 Multi-Stage Fracture 2258.80 2258.90 0
2012-09-01 Multi-Stage Fracture 2184.70 2184.80 0
2012-08-30 Multi-Stage Fracture 3405.60 3405.70 0
2012-08-30 Multi-Stage Fracture 3331.30 3331.40 0
2012-08-31 Multi-Stage Fracture 3270.10 3270.20 0
2012-08-31 Multi-Stage Fracture 3193.50 3193.60 0
2012-08-31 Multi-Stage Fracture 3132.80 3132.90 0
2012-08-31 Multi-Stage Fracture 3071.80 3071.90 0
2012-08-31 Multi-Stage Fracture 2996.80 2996.90 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2102 0.0 0.0 0.0
2013 8442 0.0 0.0 0.0
2014 8493 0.0 0.0 0.0
2015 8686 0.0 0.0 0.0
2016 8674 0.0 0.0 0.0
2017 8644 0.0 0.0 0.0
2018 8651 0.0 0.0 0.0
2019 8480 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-22 No Incident Encountered 0.00 0.00
2012-09-11 No Incident Encountered 0.00 0.00

For data sources see[8]

References