If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 0514272216000 | | Well ID: 0514272216000 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="21" | {{#display_map: 53.422900, -113.888747 | width=100% | height=100% }} |
|- | |- | ||
| Location: 00/16-22-051-27W4/0 | | Location: 00/16-22-051-27W4/0 | ||
Line 10: | Line 10: | ||
|- | |- | ||
| Location Alias 2: 00/16-22-051-27 W4/00 | | Location Alias 2: 00/16-22-051-27 W4/00 | ||
+ | |- | ||
+ | | Country: Canada | ||
|- | |- | ||
| Province: Alberta | | Province: Alberta | ||
+ | |- | ||
+ | | Township: 051 | ||
+ | |- | ||
+ | | Meridian: 4 | ||
+ | |- | ||
+ | | Range: 27 | ||
+ | |- | ||
+ | | Section: 22 | ||
|- | |- | ||
| County/Municipality: [[Parkland County,_Alberta|Parkland County]] | | County/Municipality: [[Parkland County,_Alberta|Parkland County]] | ||
Line 17: | Line 27: | ||
| Well Name: IMPERIAL GOLDEN SPIKE NO. 22 | | Well Name: IMPERIAL GOLDEN SPIKE NO. 22 | ||
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[Imperial Oil Resources Limited]] |
|- | |- | ||
| License Number: 0006763 | | License Number: 0006763 | ||
Line 29: | Line 39: | ||
| Final Drill Date: 1953-10-15 | | Final Drill Date: 1953-10-15 | ||
|- | |- | ||
− | | Well Total Depth: 1586. | + | | Well Total Depth: 1586.80 m |
|- | |- | ||
− | | Surface Hole Latitude: 53. | + | | Surface Hole Latitude: 53.422900 |
|- | |- | ||
| Surface Hole Longitude: -113.888747 | | Surface Hole Longitude: -113.888747 | ||
Line 38: | Line 48: | ||
| title = General Well Data File - Licensing Data | | title = General Well Data File - Licensing Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref><ref>{{cite web |
| title = General Well Data File - Drilling Data | | title = General Well Data File - Drilling Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
+ | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-05-07 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 1909-09-09 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 1953-07-17 | ||
+ | | Obtained License | ||
+ | |- | ||
+ | | 1953-09-15 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1953-09-16 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1953-09-30 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1953-10-01 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1953-10-09 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1953-10-10 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1953-10-11 | ||
+ | | Drill Stem Test Performed | ||
+ | |- | ||
+ | | 1953-10-12 | ||
+ | | Production Casing Operation Performed | ||
+ | |- | ||
+ | | 1953-10-15 | ||
+ | | Finished Drilling | ||
+ | |- | ||
+ | | 1953-10-15 | ||
+ | | Perforation Treatment Performed - Open-Hole Completion | ||
+ | |- | ||
+ | | 1953-10-15 | ||
+ | | Well Mode changed to Drilled and Cased | ||
+ | |- | ||
+ | | 1953-10-21 | ||
+ | | Well Began Production | ||
+ | |- | ||
+ | | 1953-10-21 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 1953-10-21 | ||
+ | | Well Mode changed to Flowing | ||
+ | |- | ||
+ | | 1954-01-09 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 1954-01-09 | ||
+ | | Well Mode changed to Pumping | ||
+ | |- | ||
+ | | 1966-04-26 | ||
+ | | Perforation Treatment Performed - Open-Hole Completion | ||
+ | |- | ||
+ | | 1966-04-29 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1966-05-02 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1966-05-04 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1966-05-06 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1966-05-07 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1966-06-01 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1966-06-02 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1969-05-07 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1969-05-07 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1973-02-01 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 1973-02-01 | ||
+ | | Well Mode changed to Suspended | ||
+ | |- | ||
+ | | 1979-11-08 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 1987-08-07 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 1987-08-07 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 1987-08-11 | ||
+ | | Perforation Treatment Performed - Cement Squeeze | ||
+ | |- | ||
+ | | 1987-10-20 | ||
+ | | Perforation Treatment Performed - Cement Plug | ||
+ | |- | ||
+ | | 1987-10-20 | ||
+ | | Perforation Treatment Performed - Open-Hole Completion | ||
+ | |- | ||
+ | | 1987-10-22 | ||
+ | | Perforation Treatment Performed - Acid Squeeze - Press Used | ||
+ | |- | ||
+ | | 1992-04-24 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 1992-04-24 | ||
+ | | Well Mode changed to Flowing | ||
+ | |- | ||
+ | | 1994-08-01 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 1994-08-01 | ||
+ | | Well Mode changed to Suspended | ||
+ | |- | ||
+ | | 2007-12-09 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2007-12-09 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2007-12-09 | ||
+ | | Plug Back Performed | ||
+ | |- | ||
+ | | 2007-12-09 | ||
+ | | Well Fluid changed to Crude Oil | ||
+ | |- | ||
+ | | 2007-12-09 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2007-12-09 | ||
+ | | Well Mode changed to Abandoned Zone | ||
+ | |- | ||
+ | | 2007-12-11 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2007-12-11 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 2007-12-12 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2007-12-12 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2007-12-13 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 2008-01-19 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2008-01-20 | ||
+ | | Perforation Treatment Performed - Jet Perforation | ||
+ | |- | ||
+ | | 2008-01-20 | ||
+ | | Well Log Performed | ||
+ | |- | ||
+ | | 2008-02-01 | ||
+ | | Perforation Treatment Performed - Bridge Plug Capped W/Cement | ||
+ | |- | ||
+ | | 2008-02-01 | ||
+ | | Perforation Treatment Performed - Remedial Casing | ||
+ | |- | ||
+ | | 2009-02-18 | ||
+ | | Well Abandoned | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = General Well Data File | ||
+ | |publisher = [[Alberta Energy Regulator]] | ||
+ | | date = 2020-04-22 | ||
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-04-29 }}</ref> |
<!--== Spud Table == | <!--== Spud Table == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 74: | Line 270: | ||
| 1953-10-15 | | 1953-10-15 | ||
| Open Hole/Barefoot Completion | | Open Hole/Barefoot Completion | ||
− | | style="text-align: right;" | 1544. | + | | style="text-align: right;" | 1544.40 |
− | | style="text-align: right;" | 1554. | + | | style="text-align: right;" | 1554.20 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1966-04-26 | | 1966-04-26 | ||
| Open Hole/Barefoot Completion | | Open Hole/Barefoot Completion | ||
− | | style="text-align: right;" | 1544. | + | | style="text-align: right;" | 1544.40 |
− | | style="text-align: right;" | 1586. | + | | style="text-align: right;" | 1586.80 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1966-04-29 | | 1966-04-29 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1575. | + | | style="text-align: right;" | 1575.20 |
− | | style="text-align: right;" | 1586. | + | | style="text-align: right;" | 1586.80 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1966-05-02 | | 1966-05-02 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1575. | + | | style="text-align: right;" | 1575.20 |
− | | style="text-align: right;" | 1586. | + | | style="text-align: right;" | 1586.80 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1966-05-04 | | 1966-05-04 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1577. | + | | style="text-align: right;" | 1577.30 |
− | | style="text-align: right;" | 1586. | + | | style="text-align: right;" | 1586.80 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1966-05-06 | | 1966-05-06 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1574. | + | | style="text-align: right;" | 1574.60 |
− | | style="text-align: right;" | 1586. | + | | style="text-align: right;" | 1586.80 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1966-05-07 | | 1966-05-07 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1575. | + | | style="text-align: right;" | 1575.20 |
− | | style="text-align: right;" | 1586. | + | | style="text-align: right;" | 1586.80 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1966-06-01 | | 1966-06-01 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1544. | + | | style="text-align: right;" | 1544.40 |
− | | style="text-align: right;" | 1586. | + | | style="text-align: right;" | 1586.80 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1966-06-02 | | 1966-06-02 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1544. | + | | style="text-align: right;" | 1544.40 |
− | | style="text-align: right;" | 1586. | + | | style="text-align: right;" | 1586.80 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1969-05-07 | | 1969-05-07 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1363. | + | | style="text-align: right;" | 1363.10 |
− | | style="text-align: right;" | 1367. | + | | style="text-align: right;" | 1367.90 |
| style="text-align: right;" | 7 | | style="text-align: right;" | 7 | ||
|- | |- | ||
| 1969-05-07 | | 1969-05-07 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1371. | + | | style="text-align: right;" | 1371.60 |
− | | style="text-align: right;" | 1375. | + | | style="text-align: right;" | 1375.90 |
| style="text-align: right;" | 7 | | style="text-align: right;" | 7 | ||
|- | |- | ||
| 1969-05-07 | | 1969-05-07 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1385 | + | | style="text-align: right;" | 1385.00 |
− | | style="text-align: right;" | 1388. | + | | style="text-align: right;" | 1388.70 |
| style="text-align: right;" | 7 | | style="text-align: right;" | 7 | ||
|- | |- | ||
| 1969-05-07 | | 1969-05-07 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1363. | + | | style="text-align: right;" | 1363.10 |
− | | style="text-align: right;" | 1388. | + | | style="text-align: right;" | 1388.70 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1979-11-08 | | 1979-11-08 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 1218. | + | | style="text-align: right;" | 1218.50 |
− | | style="text-align: right;" | 1221 | + | | style="text-align: right;" | 1221.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1987-08-07 | | 1987-08-07 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1363. | + | | style="text-align: right;" | 1363.10 |
− | | style="text-align: right;" | 1367. | + | | style="text-align: right;" | 1367.90 |
| style="text-align: right;" | 7 | | style="text-align: right;" | 7 | ||
|- | |- | ||
| 1987-08-07 | | 1987-08-07 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1371. | + | | style="text-align: right;" | 1371.60 |
− | | style="text-align: right;" | 1375. | + | | style="text-align: right;" | 1375.90 |
| style="text-align: right;" | 7 | | style="text-align: right;" | 7 | ||
|- | |- | ||
| 1987-08-07 | | 1987-08-07 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 1385 | + | | style="text-align: right;" | 1385.00 |
− | | style="text-align: right;" | 1388. | + | | style="text-align: right;" | 1388.70 |
| style="text-align: right;" | 7 | | style="text-align: right;" | 7 | ||
|- | |- | ||
| 1987-08-11 | | 1987-08-11 | ||
− | | Cement Squeeze | + | | Cement Squeeze |
− | | style="text-align: right;" | 1363. | + | | style="text-align: right;" | 1363.10 |
− | | style="text-align: right;" | 1388. | + | | style="text-align: right;" | 1388.70 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1987-10-20 | | 1987-10-20 | ||
− | | Cement Plug | + | | Cement Plug |
− | | style="text-align: right;" | 1558. | + | | style="text-align: right;" | 1558.50 |
− | | style="text-align: right;" | 1586. | + | | style="text-align: right;" | 1586.80 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1987-10-20 | | 1987-10-20 | ||
| Open Hole/Barefoot Completion | | Open Hole/Barefoot Completion | ||
− | | style="text-align: right;" | 1544. | + | | style="text-align: right;" | 1544.40 |
− | | style="text-align: right;" | 1558. | + | | style="text-align: right;" | 1558.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 1987-10-22 | | 1987-10-22 | ||
| Acid Treatment | | Acid Treatment | ||
− | | style="text-align: right;" | 1544. | + | | style="text-align: right;" | 1544.40 |
− | | style="text-align: right;" | 1558. | + | | style="text-align: right;" | 1558.50 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2007-12-09 | | 2007-12-09 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 1342 | + | | style="text-align: right;" | 1342.00 |
− | | style="text-align: right;" | 1350 | + | | style="text-align: right;" | 1350.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2007-12-09 | | 2007-12-09 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 590 | + | | style="text-align: right;" | 590.00 |
− | | style="text-align: right;" | 591 | + | | style="text-align: right;" | 591.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2007-12-11 | | 2007-12-11 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 590 | + | | style="text-align: right;" | 590.00 |
− | | style="text-align: right;" | 591 | + | | style="text-align: right;" | 591.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2007-12-11 | | 2007-12-11 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 572 | + | | style="text-align: right;" | 572.00 |
− | | style="text-align: right;" | 580 | + | | style="text-align: right;" | 580.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2007-12-12 | | 2007-12-12 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 425 | + | | style="text-align: right;" | 425.00 |
− | | style="text-align: right;" | 426 | + | | style="text-align: right;" | 426.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2007-12-13 | | 2007-12-13 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 425 | + | | style="text-align: right;" | 425.00 |
− | | style="text-align: right;" | 426 | + | | style="text-align: right;" | 426.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2008-01-19 | | 2008-01-19 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 398. | + | | style="text-align: right;" | 398.40 |
− | | style="text-align: right;" | 415 | + | | style="text-align: right;" | 415.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2008-01-20 | | 2008-01-20 | ||
| Perforation | | Perforation | ||
− | | style="text-align: right;" | 290 | + | | style="text-align: right;" | 290.00 |
− | | style="text-align: right;" | 291 | + | | style="text-align: right;" | 291.00 |
| style="text-align: right;" | 17 | | style="text-align: right;" | 17 | ||
|- | |- | ||
| 2008-02-01 | | 2008-02-01 | ||
| Remedial Casing Cementing | | Remedial Casing Cementing | ||
− | | style="text-align: right;" | 290 | + | | style="text-align: right;" | 290.00 |
− | | style="text-align: right;" | 291 | + | | style="text-align: right;" | 291.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
| 2008-02-01 | | 2008-02-01 | ||
| Packing Device Capped w/Cement | | Packing Device Capped w/Cement | ||
− | | style="text-align: right;" | 277 | + | | style="text-align: right;" | 277.00 |
− | | style="text-align: right;" | 285 | + | | style="text-align: right;" | 285.00 |
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
|- | |- | ||
Line 262: | Line 458: | ||
| title = General Well Data File - Tour-Perforation/Treatment Data | | title = General Well Data File - Tour-Perforation/Treatment Data | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-22 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Job Number |
− | !scope="col" | | + | !scope="col" | Trade Name |
− | + | !scope="col" | Supplier | |
− | !scope="col | ||
!scope="col" | Purpose | !scope="col" | Purpose | ||
− | !scope="col" | + | !scope="col" | Ingredient Name |
− | !scope="col" | | + | !scope="col" | CAS Number |
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
|}--> | |}--> | ||
Line 295: | Line 505: | ||
| 1961 | | 1961 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1962 | | 1962 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1963 | | 1963 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1964 | | 1964 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1965 | | 1965 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1989 | | 1989 | ||
| style="text-align: right;" | 5002 | | style="text-align: right;" | 5002 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
| 1992 | | 1992 | ||
| style="text-align: right;" | 1635 | | style="text-align: right;" | 1635 | ||
− | |||
| style="text-align: right;" | 0.0 | | style="text-align: right;" | 0.0 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0.0 |
+ | | style="text-align: right;" | 0.0 | ||
|- | |- | ||
|} | |} | ||
Line 339: | Line 549: | ||
| title = Well Production Data - All Alberta | | title = Well Production Data - All Alberta | ||
|publisher = [[Alberta Energy Regulator]] | |publisher = [[Alberta Energy Regulator]] | ||
− | | date = | + | | date = 2020-04-25 |
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-05-07 }}</ref> |
<!--== Occurences == | <!--== Occurences == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" |
Well ID: 0514272216000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.4229,"lon":-113.888747,"icon":""}]} |
Location: 00/16-22-051-27W4/0 | |
Location Alias: 00/16-22-51-27 W4M | |
Location Alias 2: 00/16-22-051-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 27 | |
Section: 22 | |
County/Municipality: Parkland County | |
Well Name: IMPERIAL GOLDEN SPIKE NO. 22 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0006763 | |
License Date: 1953-07-17 | |
License Status: Abandoned | |
Spud Date: 1953-09-06 | |
Final Drill Date: 1953-10-15 | |
Well Total Depth: 1586.80 m | |
Surface Hole Latitude: 53.422900 | |
Surface Hole Longitude: -113.888747 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-07-17 | Obtained License |
1953-09-15 | Drill Stem Test Performed |
1953-09-16 | Drill Stem Test Performed |
1953-09-30 | Drill Stem Test Performed |
1953-10-01 | Drill Stem Test Performed |
1953-10-09 | Drill Stem Test Performed |
1953-10-10 | Drill Stem Test Performed |
1953-10-11 | Drill Stem Test Performed |
1953-10-12 | Production Casing Operation Performed |
1953-10-15 | Finished Drilling |
1953-10-15 | Perforation Treatment Performed - Open-Hole Completion |
1953-10-15 | Well Mode changed to Drilled and Cased |
1953-10-21 | Well Began Production |
1953-10-21 | Well Fluid changed to Crude Oil |
1953-10-21 | Well Mode changed to Flowing |
1954-01-09 | Well Fluid changed to Crude Oil |
1954-01-09 | Well Mode changed to Pumping |
1966-04-26 | Perforation Treatment Performed - Open-Hole Completion |
1966-04-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-05-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-05-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-05-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-05-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-06-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-06-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1969-05-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1969-05-07 | Perforation Treatment Performed - Jet Perforation |
1973-02-01 | Well Fluid changed to Crude Oil |
1973-02-01 | Well Mode changed to Suspended |
1979-11-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-08-07 | Perforation Treatment Performed - Jet Perforation |
1987-08-07 | Plug Back Performed |
1987-08-11 | Perforation Treatment Performed - Cement Squeeze |
1987-10-20 | Perforation Treatment Performed - Cement Plug |
1987-10-20 | Perforation Treatment Performed - Open-Hole Completion |
1987-10-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-04-24 | Well Fluid changed to Crude Oil |
1992-04-24 | Well Mode changed to Flowing |
1994-08-01 | Well Fluid changed to Crude Oil |
1994-08-01 | Well Mode changed to Suspended |
2007-12-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-12-09 | Perforation Treatment Performed - Jet Perforation |
2007-12-09 | Plug Back Performed |
2007-12-09 | Well Fluid changed to Crude Oil |
2007-12-09 | Well Log Performed |
2007-12-09 | Well Mode changed to Abandoned Zone |
2007-12-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-12-11 | Perforation Treatment Performed - Remedial Casing |
2007-12-12 | Perforation Treatment Performed - Jet Perforation |
2007-12-12 | Well Log Performed |
2007-12-13 | Perforation Treatment Performed - Remedial Casing |
2008-01-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-01-20 | Perforation Treatment Performed - Jet Perforation |
2008-01-20 | Well Log Performed |
2008-02-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-02-01 | Perforation Treatment Performed - Remedial Casing |
2009-02-18 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-10-15 | Open Hole/Barefoot Completion | 1544.40 | 1554.20 | 0 |
1966-04-26 | Open Hole/Barefoot Completion | 1544.40 | 1586.80 | 0 |
1966-04-29 | Acid Treatment | 1575.20 | 1586.80 | 0 |
1966-05-02 | Acid Treatment | 1575.20 | 1586.80 | 0 |
1966-05-04 | Acid Treatment | 1577.30 | 1586.80 | 0 |
1966-05-06 | Acid Treatment | 1574.60 | 1586.80 | 0 |
1966-05-07 | Acid Treatment | 1575.20 | 1586.80 | 0 |
1966-06-01 | Acid Treatment | 1544.40 | 1586.80 | 0 |
1966-06-02 | Acid Treatment | 1544.40 | 1586.80 | 0 |
1969-05-07 | Perforation | 1363.10 | 1367.90 | 7 |
1969-05-07 | Perforation | 1371.60 | 1375.90 | 7 |
1969-05-07 | Perforation | 1385.00 | 1388.70 | 7 |
1969-05-07 | Acid Treatment | 1363.10 | 1388.70 | 0 |
1979-11-08 | Packing Device Capped w/Cement | 1218.50 | 1221.00 | 0 |
1987-08-07 | Perforation | 1363.10 | 1367.90 | 7 |
1987-08-07 | Perforation | 1371.60 | 1375.90 | 7 |
1987-08-07 | Perforation | 1385.00 | 1388.70 | 7 |
1987-08-11 | Cement Squeeze | 1363.10 | 1388.70 | 0 |
1987-10-20 | Cement Plug | 1558.50 | 1586.80 | 0 |
1987-10-20 | Open Hole/Barefoot Completion | 1544.40 | 1558.50 | 0 |
1987-10-22 | Acid Treatment | 1544.40 | 1558.50 | 0 |
2007-12-09 | Packing Device Capped w/Cement | 1342.00 | 1350.00 | 0 |
2007-12-09 | Perforation | 590.00 | 591.00 | 17 |
2007-12-11 | Remedial Casing Cementing | 590.00 | 591.00 | 0 |
2007-12-11 | Packing Device Capped w/Cement | 572.00 | 580.00 | 0 |
2007-12-12 | Perforation | 425.00 | 426.00 | 17 |
2007-12-13 | Remedial Casing Cementing | 425.00 | 426.00 | 0 |
2008-01-19 | Packing Device Capped w/Cement | 398.40 | 415.00 | 0 |
2008-01-20 | Perforation | 290.00 | 291.00 | 17 |
2008-02-01 | Remedial Casing Cementing | 290.00 | 291.00 | 0 |
2008-02-01 | Packing Device Capped w/Cement | 277.00 | 285.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1989 | 5002 | 0.0 | 0.0 | 0.0 |
1992 | 1635 | 0.0 | 0.0 | 0.0 |
For data sources see[5]