X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0534261107002

Well Details

Well ID: 0534261107002
Loading map...
Location: 00/07-11-053-26W4/2
Location Alias: 00/07-11-53-26 W4M
Location Alias 2: 00/07-11-053-26 W4/02
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 11
County/Municipality: Parkland County
Well Name: CEDAR CREEK STAL-BLK 7-11-53-26
Operator Name: MAGA Energy Operations Ltd.
License Number: 0003864
License Date: 1951-11-29
License Status: Issued
Spud Date: 1951-12-07
Final Drill Date: 1952-01-19
Well Total Depth: 1578.00 m
Surface Hole Latitude: 53.561162
Surface Hole Longitude: -113.723621

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-11-29 Obtained License
1951-12-31 Production Casing Operation Performed
1952-01-19 Finished Drilling
1952-01-19 Lost Circulation Occurred
1952-01-19 Perforation Treatment Performed - Open-Hole Completion
1952-01-19 Well Mode changed to Drilled and Cased
1984-08-15 Well Log Performed
1987-05-23 Well Log Performed
1987-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-10 Well Log Performed
1989-07-11 Well Log Performed
1991-04-15 Well Log Performed
1991-04-17 Perforation Treatment Performed - Open-Hole Completion
1991-04-17 Well Log Performed
1991-04-19 Liner Casing Operation Performed
1991-04-19 Perforation Treatment Performed - Cement Squeeze
1991-04-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-04-20 Perforation Treatment Performed - Jet Perforation
1991-04-20 Well Log Performed
1991-04-21 Well Log Performed
1993-06-03 Perforation Treatment Performed - Chemical Squeeze
1993-06-14 Perforation Treatment Performed - Chemical Squeeze
1993-09-07 Perforation Treatment Performed - Chemical Squeeze
1993-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-09-09 Perforation Treatment Performed - Jet Perforation
1993-09-09 Well Log Performed
1993-10-08 Perforation Treatment Performed - Chemical Squeeze
1994-06-21 Perforation Treatment Performed - Chemical Squeeze
1994-07-14 Perforation Treatment Performed - Chemical Squeeze
1994-09-21 Perforation Treatment Performed - Chemical Squeeze
1994-10-27 Perforation Treatment Performed - Chemical Squeeze
2003-08-11 Perforation Treatment Performed - Jet Perforation
2003-08-11 Well Log Performed
2003-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-08-18 Well Log Performed
2006-04-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-04-20 Plug Back Performed
2006-04-23 Perforation Treatment Performed - Jet Perforation
2006-04-24 Perforation Treatment Performed - Fractured
2006-05-18 Well Began Production
2006-05-18 Well Fluid changed to Crude Oil
2006-05-18 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-01-19 Open Hole/Barefoot Completion 1478.90 1544.10 0
1991-04-20 Perforation 1529.20 1529.90 20
1991-04-20 Perforation 1530.70 1531.40 20
1991-04-20 Acid Treatment 1521.70 1531.40 0
1993-06-03 Chemical Squeeze 1521.70 1531.40 0
1993-06-14 Chemical Squeeze 1521.70 1531.40 0
1993-09-07 Chemical Squeeze 1521.70 1531.40 0
1993-09-09 Perforation 1532.40 1532.90 20
1993-09-09 Perforation 1534.60 1535.10 20
1993-09-09 Perforation 1536.80 1537.30 20
1993-09-09 Acid Treatment 1532.40 1537.30 0
1987-05-25 Acid Treatment 1478.90 1512.20 0
1993-09-09 Acid Treatment 1521.70 1522.40 0
1993-10-08 Chemical Squeeze 1521.70 1537.30 0
1994-06-21 Chemical Squeeze 1521.70 1537.30 0
1994-07-14 Chemical Squeeze 1521.70 1537.30 0
1994-09-21 Chemical Squeeze 1521.70 1537.30 0
1994-10-27 Chemical Squeeze 1521.70 1537.30 0
2003-08-11 Perforation 1511.40 1513.40 13
2003-08-11 Perforation 1514.40 1516.40 13
2003-08-11 Perforation 1517.40 1519.40 13
2003-08-11 Perforation 1520.40 1521.70 13
1991-04-17 Open Hole/Barefoot Completion 1478.90 1578.00 0
2003-08-15 Acid Treatment 1511.40 1513.40 0
2003-08-15 Acid Treatment 1514.40 1516.40 0
2003-08-15 Acid Treatment 1517.40 1519.40 0
2003-08-15 Acid Treatment 1520.40 1521.70 0
2006-04-20 Packing Device Capped w/Cement 1493.70 1502.20 0
2006-04-23 Perforation 1199.00 1202.20 20
2006-04-24 Fracture 1199.00 1202.20 0
1991-04-19 Cement Squeeze 1478.90 1578.00 0
1991-04-20 Perforation 1521.70 1522.40 20
1991-04-20 Perforation 1523.20 1523.90 20
1991-04-20 Perforation 1524.70 1525.40 20
1991-04-20 Perforation 1526.20 1526.90 20
1991-04-20 Perforation 1527.70 1528.40 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 5239 0.0 0.0 0.0
2007 8688 0.0 0.0 0.0
2008 8752 0.0 0.0 0.0
2009 8668 0.0 0.0 0.0
2010 7368 0.0 0.0 0.0
2011 7693 0.0 0.0 0.0
2012 8528 0.0 0.0 0.0
2013 8536 0.0 0.0 0.0
2014 8400 0.0 0.0 0.0
2015 8352 0.0 0.0 0.0
2016 8549 0.0 0.0 0.0
2017 7353 0.0 0.0 0.0
2018 8006 0.0 0.0 0.0
2019 7576 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1952-01-19 Lost Circulation 1488.60 1488.60

For data sources see[6]

References