X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0534262505004"

m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0534262505004
 
| Well ID: 0534262505004
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.6047779, -113.7107368 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.605291, -113.710471 | width=100% | height=100% }}
 +
|-
 +
| Location: 00/05-25-053-26W4/4
 +
|-
 +
| Location Alias: 00/05-25-53-26 W4M
 +
|-
 +
| Location Alias 2: 00/05-25-053-26 W4/04
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 053
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 26
 +
|-
 +
| Section: 25
 +
|-
 +
| County/Municipality: [[Sturgeon County,_Alberta|Sturgeon County]]
 
|-
 
|-
 
| Well Name: DAYLIGHT STAL-BLK 5-25-53-26
 
| Well Name: DAYLIGHT STAL-BLK 5-25-53-26
 
|-
 
|-
| Operator:
+
| Operator Name: [[Sinopec Daylight Energy Ltd.]]
 +
|-
 +
| License Number: 0011835
 
|-
 
|-
 
| License Date: 1956-07-12
 
| License Date: 1956-07-12
 
|-
 
|-
| Final Drilling Date: 1956-10-16
+
| License Status: Suspension
 
|-
 
|-
| Total Depth: 1525.2m
+
| Spud Date: 1956-07-16
 
|-
 
|-
| Fluid Type: Gas
+
| Final Drill Date: 1956-10-16
 
|-
 
|-
| Status: Suspended
+
| Well Total Depth: 1525.20 m
 
|-
 
|-
| Well Type: Not Applicable
+
| Surface Hole Latitude: 53.605291
 
|-
 
|-
| Configuration: Vertical
+
| Surface Hole Longitude: -113.710471
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 
|-
 
|-
| Violations:
+
| 1909-09-09
 +
| Well Log Performed
 
|-
 
|-
| Latitude: 53.6047779
+
| 1956-07-12
 +
| Obtained License
 
|-
 
|-
| Longitude: -113.7107368
+
| 1956-07-28
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-07-30
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-08-01
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-08-03
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-08-04
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-08-05
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-08-07
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-08-09
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-08-12
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-08-13
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-08-15
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1956-08-21
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1956-08-21
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1956-08-22
 +
| Rig Released
 +
|-
 +
| 1956-10-03
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1956-10-04
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-10-06
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1956-10-08
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-10-08
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1956-10-08
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1956-10-10
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-10-11
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-10-12
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-10-13
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-10-14
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-10-15
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-10-16
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-10-16
 +
| Finished Drilling
 +
|-
 +
| 1956-10-16
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1956-10-20
 +
| Drill Stem Test Performed
 +
|-
 +
| 1956-10-20
 +
| Liner Casing Operation Performed
 +
|-
 +
| 1956-10-20
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1956-10-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1956-10-31
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1962-07-10
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1962-07-10
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1962-07-11
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1979-09-11
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1979-09-13
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1979-09-14
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1979-09-17
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1979-09-20
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1979-09-22
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1979-09-23
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1996-03-26
 +
| Well Log Performed
 +
|-
 +
| 1996-03-30
 +
| Well Log Performed
 +
|-
 +
| 1996-04-01
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1996-04-01
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1996-04-01
 +
| Plug Back Performed
 +
|-
 +
| 1997-03-29
 +
| Well Log Performed
 +
|-
 +
| 1999-03-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-03-02
 +
| Well Log Performed
 +
|-
 +
| 1999-03-02
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1999-08-14
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2000-03-15
 +
| Well Began Production
 +
|-
 +
| 2000-03-15
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2000-03-15
 +
| Well Mode changed to Flowing
 +
|-
 +
| 2012-04-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2012-04-01
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2014-06-27
 +
| Well Log Performed
 +
|-
 +
| 2014-06-28
 +
| Well Log Performed
 +
|-
 +
| 2014-06-29
 +
| Well Log Performed
 +
|-
 +
| 2015-01-23
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2015-01-23
 +
| Plug Back Performed
 +
|-
 +
| 2015-01-23
 +
| Well Log Performed
 +
|-
 +
| 2015-01-24
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2015-01-24
 +
| Plug Back Performed
 +
|-
 +
| 2015-01-24
 +
| Well Fluid changed to Gas
 +
|-
 +
| 2015-01-24
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
 +
 
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1956-08-21
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1341.10
 +
| style="text-align: right;" | 1347.20
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1956-10-30
 +
| Perforation
 +
| style="text-align: right;" | 1432.00
 +
| style="text-align: right;" | 1444.10
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1956-10-31
 +
| Acid Treatment
 +
| style="text-align: right;" | 1432.00
 +
| style="text-align: right;" | 1444.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1962-07-10
 +
| Perforation
 +
| style="text-align: right;" | 1489.30
 +
| style="text-align: right;" | 1491.10
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1962-07-10
 +
| Acid Wash
 +
| style="text-align: right;" | 1489.30
 +
| style="text-align: right;" | 1491.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1962-07-11
 +
| Acid Treatment
 +
| style="text-align: right;" | 1489.30
 +
| style="text-align: right;" | 1491.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-09-11
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1489.30
 +
| style="text-align: right;" | 1491.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-09-13
 +
| Acid Treatment
 +
| style="text-align: right;" | 1432.00
 +
| style="text-align: right;" | 1444.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-09-14
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1432.00
 +
| style="text-align: right;" | 1444.10
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-09-17
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1432.00
 +
| style="text-align: right;" | 1491.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-09-20
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1432.00
 +
| style="text-align: right;" | 1491.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1956-08-21
 +
| Acid Treatment
 +
| style="text-align: right;" | 1341.10
 +
| style="text-align: right;" | 1347.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-09-22
 +
| Perforation
 +
| style="text-align: right;" | 1429.80
 +
| style="text-align: right;" | 1431.60
 +
| style="text-align: right;" | 6
 +
|-
 +
| 1979-09-23
 +
| Acid Treatment
 +
| style="text-align: right;" | 1429.80
 +
| style="text-align: right;" | 1431.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-04-01
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1417.00
 +
| style="text-align: right;" | 1425.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-04-01
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1315.00
 +
| style="text-align: right;" | 1323.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1996-04-01
 +
| Perforation
 +
| style="text-align: right;" | 1054.00
 +
| style="text-align: right;" | 1058.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1999-03-02
 +
| Perforation
 +
| style="text-align: right;" | 1124.70
 +
| style="text-align: right;" | 1127.20
 +
| style="text-align: right;" | 14
 +
|-
 +
| 1999-08-14
 +
| Fracture
 +
| style="text-align: right;" | 1124.70
 +
| style="text-align: right;" | 1127.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-01-23
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1104.00
 +
| style="text-align: right;" | 1112.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2015-01-24
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1037.00
 +
| style="text-align: right;" | 1045.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1956-10-03
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1389.90
 +
| style="text-align: right;" | 1440.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1956-10-06
 +
| Cement Plug
 +
| style="text-align: right;" | 1373.70
 +
| style="text-align: right;" | 1440.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1956-10-08
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1389.90
 +
| style="text-align: right;" | 1442.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1956-10-08
 +
| Cement Plug
 +
| style="text-align: right;" | 1414.30
 +
| style="text-align: right;" | 1442.60
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1956-10-08
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1389.90
 +
| style="text-align: right;" | 1414.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1956-10-16
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1389.90
 +
| style="text-align: right;" | 1525.20
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1956-10-20
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1389.90
 +
| style="text-align: right;" | 1525.20
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Perforation/Treatment Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
| 2000
 +
| style="text-align: right;" | 5521
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2001
 +
| style="text-align: right;" | 7947
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2002
 +
| style="text-align: right;" | 7296
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2003
 +
| style="text-align: right;" | 7044
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2004
 +
| style="text-align: right;" | 6621
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2005
 +
| style="text-align: right;" | 7828
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2006
 +
| style="text-align: right;" | 8269
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2007
 +
| style="text-align: right;" | 8219
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2008
 +
| style="text-align: right;" | 7793
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2009
 +
| style="text-align: right;" | 7318
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2010
 +
| style="text-align: right;" | 8665
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
| 2011
 +
| style="text-align: right;" | 3793
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Well Production Data - All Alberta
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-25
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
| 2014-06-29
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
| 2015-01-25
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 19:50, 17 January 2021

Well Details

Well ID: 0534262505004
Loading map...
Location: 00/05-25-053-26W4/4
Location Alias: 00/05-25-53-26 W4M
Location Alias 2: 00/05-25-053-26 W4/04
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 25
County/Municipality: Sturgeon County
Well Name: DAYLIGHT STAL-BLK 5-25-53-26
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0011835
License Date: 1956-07-12
License Status: Suspension
Spud Date: 1956-07-16
Final Drill Date: 1956-10-16
Well Total Depth: 1525.20 m
Surface Hole Latitude: 53.605291
Surface Hole Longitude: -113.710471

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-07-12 Obtained License
1956-07-28 Drill Stem Test Performed
1956-07-30 Drill Stem Test Performed
1956-08-01 Drill Stem Test Performed
1956-08-03 Drill Stem Test Performed
1956-08-04 Drill Stem Test Performed
1956-08-05 Drill Stem Test Performed
1956-08-07 Drill Stem Test Performed
1956-08-09 Drill Stem Test Performed
1956-08-12 Drill Stem Test Performed
1956-08-13 Drill Stem Test Performed
1956-08-15 Well Mode changed to Drilled and Cased
1956-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-08-21 Perforation Treatment Performed - Bullet Perforation
1956-08-22 Rig Released
1956-10-03 Perforation Treatment Performed - Open-Hole Completion
1956-10-04 Drill Stem Test Performed
1956-10-06 Perforation Treatment Performed - Cement Plug
1956-10-08 Drill Stem Test Performed
1956-10-08 Perforation Treatment Performed - Cement Plug
1956-10-08 Perforation Treatment Performed - Open-Hole Completion
1956-10-10 Drill Stem Test Performed
1956-10-11 Drill Stem Test Performed
1956-10-12 Drill Stem Test Performed
1956-10-13 Drill Stem Test Performed
1956-10-14 Drill Stem Test Performed
1956-10-15 Drill Stem Test Performed
1956-10-16 Drill Stem Test Performed
1956-10-16 Finished Drilling
1956-10-16 Perforation Treatment Performed - Open-Hole Completion
1956-10-20 Drill Stem Test Performed
1956-10-20 Liner Casing Operation Performed
1956-10-20 Perforation Treatment Performed - Cement Squeeze
1956-10-30 Perforation Treatment Performed - Jet Perforation
1956-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-07-10 Perforation Treatment Performed - Acid Wash - No Pressure
1962-07-10 Perforation Treatment Performed - Jet Perforation
1962-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-11 Perforation Treatment Performed - Cement Squeeze
1979-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-14 Perforation Treatment Performed - Cement Squeeze
1979-09-17 Perforation Treatment Performed - Cement Squeeze
1979-09-20 Perforation Treatment Performed - Cement Squeeze
1979-09-22 Perforation Treatment Performed - Jet Perforation
1979-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-03-26 Well Log Performed
1996-03-30 Well Log Performed
1996-04-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-04-01 Perforation Treatment Performed - Jet Perforation
1996-04-01 Plug Back Performed
1997-03-29 Well Log Performed
1999-03-02 Perforation Treatment Performed - Jet Perforation
1999-03-02 Well Log Performed
1999-03-02 Well Mode changed to Drilled and Cased
1999-08-14 Perforation Treatment Performed - Fractured
2000-03-15 Well Began Production
2000-03-15 Well Fluid changed to Gas
2000-03-15 Well Mode changed to Flowing
2012-04-01 Well Fluid changed to Gas
2012-04-01 Well Mode changed to Suspended
2014-06-27 Well Log Performed
2014-06-28 Well Log Performed
2014-06-29 Well Log Performed
2015-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-01-23 Plug Back Performed
2015-01-23 Well Log Performed
2015-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-01-24 Plug Back Performed
2015-01-24 Well Fluid changed to Gas
2015-01-24 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-08-21 Bullet Perforation 1341.10 1347.20 13
1956-10-30 Perforation 1432.00 1444.10 13
1956-10-31 Acid Treatment 1432.00 1444.10 0
1962-07-10 Perforation 1489.30 1491.10 7
1962-07-10 Acid Wash 1489.30 1491.10 0
1962-07-11 Acid Treatment 1489.30 1491.10 0
1979-09-11 Cement Squeeze 1489.30 1491.10 0
1979-09-13 Acid Treatment 1432.00 1444.10 0
1979-09-14 Cement Squeeze 1432.00 1444.10 0
1979-09-17 Cement Squeeze 1432.00 1491.00 0
1979-09-20 Cement Squeeze 1432.00 1491.00 0
1956-08-21 Acid Treatment 1341.10 1347.20 0
1979-09-22 Perforation 1429.80 1431.60 6
1979-09-23 Acid Treatment 1429.80 1431.60 0
1996-04-01 Packing Device Capped w/Cement 1417.00 1425.00 0
1996-04-01 Packing Device Capped w/Cement 1315.00 1323.00 0
1996-04-01 Perforation 1054.00 1058.00 13
1999-03-02 Perforation 1124.70 1127.20 14
1999-08-14 Fracture 1124.70 1127.20 0
2015-01-23 Packing Device Capped w/Cement 1104.00 1112.00 0
2015-01-24 Packing Device Capped w/Cement 1037.00 1045.00 0
1956-10-03 Open Hole/Barefoot Completion 1389.90 1440.20 0
1956-10-06 Cement Plug 1373.70 1440.20 0
1956-10-08 Open Hole/Barefoot Completion 1389.90 1442.60 0
1956-10-08 Cement Plug 1414.30 1442.60 0
1956-10-08 Open Hole/Barefoot Completion 1389.90 1414.30 0
1956-10-16 Open Hole/Barefoot Completion 1389.90 1525.20 0
1956-10-20 Cement Squeeze 1389.90 1525.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 5521 0.0 0.0 0.0
2001 7947 0.0 0.0 0.0
2002 7296 0.0 0.0 0.0
2003 7044 0.0 0.0 0.0
2004 6621 0.0 0.0 0.0
2005 7828 0.0 0.0 0.0
2006 8269 0.0 0.0 0.0
2007 8219 0.0 0.0 0.0
2008 7793 0.0 0.0 0.0
2009 7318 0.0 0.0 0.0
2010 8665 0.0 0.0 0.0
2011 3793 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-06-29 No Incident Encountered 0.00 0.00
2015-01-25 No Incident Encountered 0.00 0.00

For data sources see[6]

References