X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0534262512024"

m
m
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0534262512024
 
| Well ID: 0534262512024
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.60859600000003411, -113.71001199999994924 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.608596, -113.710012 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 02/12-25-053-26W4/4
 
| Location: 02/12-25-053-26W4/4
 +
|-
 +
| Location Alias: 02/12-25-53-26 W4M
 +
|-
 +
| Location Alias 2: 02/12-25-053-26 W4/04
 +
|-
 +
| Country: Canada
 +
|-
 +
| Province: Alberta
 +
|-
 +
| Township: 053
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 26
 +
|-
 +
| Section: 25
 +
|-
 +
| County/Municipality: [[Sturgeon County,_Alberta|Sturgeon County]]
 
|-
 
|-
 
| Well Name: DAYLIGHT 102 STAL-BLK 12-25-53-26
 
| Well Name: DAYLIGHT 102 STAL-BLK 12-25-53-26
 +
|-
 +
| Operator Name: [[Sinopec Daylight Energy Ltd.]]
 +
|-
 +
| License Number: 0012783
 
|-
 
|-
 
| License Date: 1956-12-11
 
| License Date: 1956-12-11
 
|-
 
|-
| Final Drilling Date: 1957-01-13
+
| License Status: Suspension
 +
|-
 +
| Spud Date: 1956-12-28
 +
|-
 +
| Final Drill Date: 1957-01-13
 +
|-
 +
| Well Total Depth: 1335.00 m
 +
|-
 +
| Surface Hole Latitude: 53.608596
 +
|-
 +
| Surface Hole Longitude: -113.710012
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Licensing Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref><ref>{{cite web
 +
| title = General Well Data File - Drilling Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1956-12-11
 +
| Obtained License
 +
|-
 +
| 1957-01-04
 +
| Drill Stem Test Performed
 +
|-
 +
| 1957-01-10
 +
| Drill Stem Test Performed
 +
|-
 +
| 1957-01-13
 +
| Finished Drilling
 +
|-
 +
| 1957-01-13
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1957-01-14
 +
| Production Casing Operation Performed
 +
|-
 +
| 1957-10-04
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1957-10-04
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1958-10-20
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1959-04-04
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1962-10-24
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1962-10-27
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1962-10-28
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1962-10-30
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1964-10-12
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1964-10-12
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1980-07-19
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1980-07-19
 +
| Perforation Treatment Performed - Open-Hole Completion
 +
|-
 +
| 1980-07-23
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1980-07-24
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1999-09-09
 +
| Well Log Performed
 +
|-
 +
| 1999-12-12
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1999-12-12
 +
| Plug Back Performed
 +
|-
 +
| 1999-12-12
 +
| Well Log Performed
 +
|-
 +
| 1999-12-15
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-12-15
 +
| Well Log Performed
 +
|-
 +
| 1999-12-20
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 2000-03-21
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2000-03-21
 +
| Plug Back Performed
 
|-
 
|-
| Total Depth: 1335.0m
+
| 2000-03-21
 +
| Well Log Performed
 
|-
 
|-
| Fluid Type: Not Applicable
+
| 2000-03-24
 +
| Perforation Treatment Performed - Jet Perforation
 
|-
 
|-
| Status: Abandoned Zone
+
| 2000-03-24
 +
| Well Log Performed
 
|-
 
|-
| Well Type: Not Applicable
+
| 2000-03-24
 +
| Well Mode changed to Drilled and Cased
 
|-
 
|-
| Configuration: Horizontal
+
| 2000-03-27
 +
| Well Log Performed
 
|-
 
|-
| Latitude: 53.60859600000003411
+
| 2001-09-20
 +
| Perforation Treatment Performed - Cement Squeeze
 
|-
 
|-
| Longitude: -113.71001199999994924
+
| 2001-09-20
 +
| Plug Back Performed
 
|-
 
|-
 +
| 2001-09-20
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2001-09-24
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2010-10-16
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2010-10-16
 +
| Plug Back Performed
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 +
<!--== Spud Table ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Spud Date
 +
!scope="col" | Contractor
 +
!scope="col" style="text-align: right;" | Rig Number
 +
!scope="col" style="text-align: right;" | New Projected Depth (m)
 +
!scope="col" | Activity Type
 +
|-
 +
|}-->
  
 +
<!--== Directional Drilling ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Start Date
 +
!scope="col" style="text-align: right;" | Depth (m)
 +
!scope="col" | Reason
 +
|-
 +
|}-->
 +
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Perforation Date
 +
!scope="col" | Perforation Type
 +
!scope="col" style="text-align: right;" | Interval Top (m)
 +
!scope="col" style="text-align: right;" | Interval Base (m)
 +
!scope="col" style="text-align: right;" | Number of Shots
 +
|-
 +
| 1957-10-04
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1327.70
 +
| style="text-align: right;" | 1335.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-10-12
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1237.50
 +
| style="text-align: right;" | 1239.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-07-19
 +
| Cement Plug
 +
| style="text-align: right;" | 1329.00
 +
| style="text-align: right;" | 1335.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-07-19
 +
| Open Hole/Barefoot Completion
 +
| style="text-align: right;" | 1327.00
 +
| style="text-align: right;" | 1329.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1980-07-23
 +
| Perforation
 +
| style="text-align: right;" | 1328.60
 +
| style="text-align: right;" | 1328.80
 +
| style="text-align: right;" | 12
 +
|-
 +
| 1980-07-24
 +
| Acid Treatment
 +
| style="text-align: right;" | 1327.00
 +
| style="text-align: right;" | 1329.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1999-12-12
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1312.00
 +
| style="text-align: right;" | 1320.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1999-12-12
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1222.00
 +
| style="text-align: right;" | 1230.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1999-12-15
 +
| Perforation
 +
| style="text-align: right;" | 1076.50
 +
| style="text-align: right;" | 1080.50
 +
| style="text-align: right;" | 18
 +
|-
 +
| 1999-12-20
 +
| Fracture
 +
| style="text-align: right;" | 1076.50
 +
| style="text-align: right;" | 1080.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-03-21
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 1062.00
 +
| style="text-align: right;" | 1070.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1957-10-04
 +
| Acid Treatment
 +
| style="text-align: right;" | 1327.70
 +
| style="text-align: right;" | 1335.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-03-24
 +
| Perforation
 +
| style="text-align: right;" | 417.00
 +
| style="text-align: right;" | 418.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 2000-03-24
 +
| Perforation
 +
| style="text-align: right;" | 420.50
 +
| style="text-align: right;" | 422.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 2001-09-20
 +
| Cement Squeeze
 +
| style="text-align: right;" | 417.00
 +
| style="text-align: right;" | 422.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2001-09-24
 +
| Perforation
 +
| style="text-align: right;" | 919.80
 +
| style="text-align: right;" | 922.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2001-09-24
 +
| Perforation
 +
| style="text-align: right;" | 924.00
 +
| style="text-align: right;" | 925.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2010-10-16
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 899.50
 +
| style="text-align: right;" | 909.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1958-10-20
 +
| Bullet Perforation
 +
| style="text-align: right;" | 1237.80
 +
| style="text-align: right;" | 1239.30
 +
| style="text-align: right;" | 16
 +
|-
 +
| 1959-04-04
 +
| Acid Treatment
 +
| style="text-align: right;" | 1237.80
 +
| style="text-align: right;" | 1239.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1962-10-24
 +
| Cement Squeeze
 +
| style="text-align: right;" | 1237.80
 +
| style="text-align: right;" | 1239.30
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1962-10-27
 +
| Perforation
 +
| style="text-align: right;" | 1237.50
 +
| style="text-align: right;" | 1239.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1962-10-28
 +
| Acid Treatment
 +
| style="text-align: right;" | 1237.50
 +
| style="text-align: right;" | 1239.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1962-10-30
 +
| Acid Treatment
 +
| style="text-align: right;" | 1237.50
 +
| style="text-align: right;" | 1239.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1964-10-12
 +
| Acid Treatment
 +
| style="text-align: right;" | 1237.50
 +
| style="text-align: right;" | 1239.00
 +
| style="text-align: right;" | 0
 +
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = ST37: List of Wells in Alberta
+
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2015-07-02
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2015-07-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
<!--== Water Sources ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Water Diversion Start Date
 +
!scope="col" | Water Diversion End Date
 +
!scope="col" | Water Source Type
 +
!scope="col" style="text-align: right;" | Total Water Volume (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 +
<!--== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" style="text-align: right;" | Total Production Hours
 +
!scope="col" style="text-align: right;" | Gas Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Oil Quantity (m<sup>3</sup>)
 +
!scope="col" style="text-align: right;" | Water Quantity (m<sup>3</sup>)
 +
|-
 +
|}-->
 +
 
 +
<!--== Occurences ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Occurence Date
 +
!scope="col" | Occurence Type
 +
!scope="col" style="text-align: right;" | Occurence Depth (m)
 +
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 +
|-
 +
|}-->
 +
 
 
==References==
 
==References==
 
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 19:51, 17 January 2021

Well Details

Well ID: 0534262512024
Loading map...
Location: 02/12-25-053-26W4/4
Location Alias: 02/12-25-53-26 W4M
Location Alias 2: 02/12-25-053-26 W4/04
Country: Canada
Province: Alberta
Township: 053
Meridian: 4
Range: 26
Section: 25
County/Municipality: Sturgeon County
Well Name: DAYLIGHT 102 STAL-BLK 12-25-53-26
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0012783
License Date: 1956-12-11
License Status: Suspension
Spud Date: 1956-12-28
Final Drill Date: 1957-01-13
Well Total Depth: 1335.00 m
Surface Hole Latitude: 53.608596
Surface Hole Longitude: -113.710012

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-12-11 Obtained License
1957-01-04 Drill Stem Test Performed
1957-01-10 Drill Stem Test Performed
1957-01-13 Finished Drilling
1957-01-13 Well Mode changed to Drilled and Cased
1957-01-14 Production Casing Operation Performed
1957-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-10-04 Perforation Treatment Performed - Open-Hole Completion
1958-10-20 Perforation Treatment Performed - Bullet Perforation
1959-04-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-10-24 Perforation Treatment Performed - Cement Squeeze
1962-10-27 Perforation Treatment Performed - Jet Perforation
1962-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-12 Perforation Treatment Performed - Cement Squeeze
1980-07-19 Perforation Treatment Performed - Cement Plug
1980-07-19 Perforation Treatment Performed - Open-Hole Completion
1980-07-23 Perforation Treatment Performed - Jet Perforation
1980-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-09-09 Well Log Performed
1999-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-12-12 Plug Back Performed
1999-12-12 Well Log Performed
1999-12-15 Perforation Treatment Performed - Jet Perforation
1999-12-15 Well Log Performed
1999-12-20 Perforation Treatment Performed - Fractured
2000-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-03-21 Plug Back Performed
2000-03-21 Well Log Performed
2000-03-24 Perforation Treatment Performed - Jet Perforation
2000-03-24 Well Log Performed
2000-03-24 Well Mode changed to Drilled and Cased
2000-03-27 Well Log Performed
2001-09-20 Perforation Treatment Performed - Cement Squeeze
2001-09-20 Plug Back Performed
2001-09-20 Well Mode changed to Abandoned Zone
2001-09-24 Perforation Treatment Performed - Jet Perforation
2010-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-16 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-10-04 Open Hole/Barefoot Completion 1327.70 1335.00 0
1964-10-12 Cement Squeeze 1237.50 1239.00 0
1980-07-19 Cement Plug 1329.00 1335.00 0
1980-07-19 Open Hole/Barefoot Completion 1327.00 1329.00 0
1980-07-23 Perforation 1328.60 1328.80 12
1980-07-24 Acid Treatment 1327.00 1329.00 0
1999-12-12 Packing Device Capped w/Cement 1312.00 1320.00 0
1999-12-12 Packing Device Capped w/Cement 1222.00 1230.00 0
1999-12-15 Perforation 1076.50 1080.50 18
1999-12-20 Fracture 1076.50 1080.50 0
2000-03-21 Packing Device Capped w/Cement 1062.00 1070.00 0
1957-10-04 Acid Treatment 1327.70 1335.00 0
2000-03-24 Perforation 417.00 418.00 14
2000-03-24 Perforation 420.50 422.00 14
2001-09-20 Cement Squeeze 417.00 422.00 0
2001-09-24 Perforation 919.80 922.50 17
2001-09-24 Perforation 924.00 925.50 17
2010-10-16 Packing Device Capped w/Cement 899.50 909.00 0
1958-10-20 Bullet Perforation 1237.80 1239.30 16
1959-04-04 Acid Treatment 1237.80 1239.30 0
1962-10-24 Cement Squeeze 1237.80 1239.30 0
1962-10-27 Perforation 1237.50 1239.00 13
1962-10-28 Acid Treatment 1237.50 1239.00 0
1962-10-30 Acid Treatment 1237.50 1239.00 0
1964-10-12 Acid Treatment 1237.50 1239.00 0

For data sources see[4]



References