X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0535022909000

Well Details

Well ID: 0535022909000
Loading map...
Location: 00/09-29-053-02W5/0
Location Alias: 00/09-29-53-02 W5M
Location Alias 2: 00/09-29-053-02 W5/00
Country: Canada
Province: Alberta
Township: 053
Meridian: 5
Range: 02
Section: 29
County/Municipality: Parkland County
Well Name: INVERNESS CARVEL 9-29-53-2
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0169734
License Date: 1994-08-22
License Status: RecCertified
Spud Date: 1994-09-23
Final Drill Date: 1994-09-28
Well Total Depth: 1459.00 m
Surface Hole Latitude: 53.606678
Surface Hole Longitude: -114.253501

For data sources see[1][2]

Well History

Date Event
1994-08-22 Obtained License
1994-09-23 Well Log Performed
1994-09-24 Surface Casing Operation Performed
1994-09-28 Finished Drilling
1994-09-28 Well Mode changed to Drilled and Cased
1994-09-29 Drill Stem Test Performed
1994-09-29 Well Log Performed
1994-09-30 Drill Stem Test Performed
1994-10-01 Drill Stem Test Performed
1994-10-02 Production Casing Operation Performed
1994-10-02 Rig Released
1994-10-27 Perforation Treatment Performed - Jet Perforation
1994-10-27 Well Log Performed
1994-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-01 Perforation Treatment Performed - Fractured
1994-11-01 Well Log Performed
1994-11-10 Perforation Treatment Performed - Fractured
1994-11-17 Well Began Production
1994-11-17 Well Fluid changed to Crude Oil
1994-11-17 Well Mode changed to Pumping
1999-10-15 Well Fluid changed to Crude Oil
1999-10-15 Well Mode changed to Suspended
2000-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-30 Plug Back Performed
2000-10-30 Well Log Performed
2000-11-01 Well Abandoned
2000-11-01 Well Fluid changed to Crude Oil
2000-11-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-10-27 Perforation 1422.00 1423.00 13
1994-10-27 Perforation 1424.50 1425.50 13
1994-10-27 Perforation 1426.50 1427.50 13
1994-10-29 Acid Treatment 1422.00 1427.50 0
1994-11-01 Fracture 1422.00 1427.50 0
1994-11-10 Fracture 1422.00 1427.50 0
2000-10-30 Packing Device Capped w/Cement 1407.00 1415.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 1005 0.0 0.0 0.0
1995 8089 0.0 0.0 0.0
1996 8448 0.0 0.0 0.0
1997 4912 0.0 0.0 0.0
1998 4052 0.0 0.0 0.0

For data sources see[5]

References