X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0554251910000"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0554251910000
 
| Well ID: 0554251910000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 53.768964, -113.703685 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 53.768964, -113.703685 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/10-19-055-25W4/0
 
| Location: 00/10-19-055-25W4/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/10-19-055-25 W4/00
 
| Location Alias 2: 00/10-19-055-25 W4/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 055
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 25
 +
|-
 +
| Section: 19
 
|-
 
|-
 
| County/Municipality: [[Sturgeon County,_Alberta|Sturgeon County]]
 
| County/Municipality: [[Sturgeon County,_Alberta|Sturgeon County]]
Line 17: Line 27:
 
| Well Name: IMP MORINVILLE 10-19BQ-55-25
 
| Well Name: IMP MORINVILLE 10-19BQ-55-25
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Imperial Oil Limited]]
 
|-
 
|-
 
| License Number: 0006664
 
| License Number: 0006664
Line 29: Line 39:
 
| Final Drill Date: 1953-08-06
 
| Final Drill Date: 1953-08-06
 
|-
 
|-
| Well Total Depth: 1415.8 m
+
| Well Total Depth: 1415.80 m
 
|-
 
|-
 
| Surface Hole Latitude: 53.768964
 
| Surface Hole Latitude: 53.768964
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1953-06-30
 +
| Obtained License
 +
|-
 +
| 1953-07-13
 +
| Drill Stem Test Performed
 +
|-
 +
| 1953-07-19
 +
| Drill Stem Test Performed
 +
|-
 +
| 1953-07-22
 +
| Drill Stem Test Performed
 +
|-
 +
| 1953-07-25
 +
| Drill Stem Test Performed
 +
|-
 +
| 1953-08-02
 +
| Drill Stem Test Performed
 +
|-
 +
| 1953-08-05
 +
| Drill Stem Test Performed
 +
|-
 +
| 1953-08-06
 +
| Finished Drilling
 +
|-
 +
| 1953-08-07
 +
| Production Casing Operation Performed
 +
|-
 +
| 1953-08-10
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1953-08-11
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1953-08-11
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1953-08-13
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1953-08-14
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1953-08-14
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1953-08-14
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1953-08-15
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1953-08-16
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1953-08-18
 +
| Perforation Treatment Performed - Acid Wash - No Pressure
 +
|-
 +
| 1953-08-18
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1953-08-18
 +
| Perforation Treatment Performed - Bullet Perforation
 +
|-
 +
| 1953-09-01
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1959-09-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1959-09-10
 +
| Perforation Treatment Performed - Acid Squeeze - Press Used
 +
|-
 +
| 1959-12-07
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 1959-12-08
 +
| Well Abandoned
 +
|-
 +
| 1959-12-08
 +
| Well Mode changed to Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 180:
 
| 1953-08-10
 
| 1953-08-10
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1299.4
+
| style="text-align: right;" | 1299.40
| style="text-align: right;" | 1301.2
+
| style="text-align: right;" | 1301.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1953-08-10
 
| 1953-08-10
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1302.7
+
| style="text-align: right;" | 1302.70
| style="text-align: right;" | 1304.2
+
| style="text-align: right;" | 1304.20
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1953-08-11
 
| 1953-08-11
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1127.5
+
| style="text-align: right;" | 1127.50
| style="text-align: right;" | 1127.8
+
| style="text-align: right;" | 1127.80
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 1953-08-11
 
| 1953-08-11
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1083.9
+
| style="text-align: right;" | 1083.90
| style="text-align: right;" | 1086.3
+
| style="text-align: right;" | 1086.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1953-08-11
 
| 1953-08-11
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1299.4
+
| style="text-align: right;" | 1299.40
| style="text-align: right;" | 1304.2
+
| style="text-align: right;" | 1304.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1953-08-13
 
| 1953-08-13
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1127.5
+
| style="text-align: right;" | 1127.50
| style="text-align: right;" | 1127.8
+
| style="text-align: right;" | 1127.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1953-08-14
 
| 1953-08-14
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1127.5
+
| style="text-align: right;" | 1127.50
| style="text-align: right;" | 1127.8
+
| style="text-align: right;" | 1127.80
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 1953-08-14
 
| 1953-08-14
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1083.9
+
| style="text-align: right;" | 1083.90
| style="text-align: right;" | 1086.3
+
| style="text-align: right;" | 1086.30
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1953-08-14
 
| 1953-08-14
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1127.5
+
| style="text-align: right;" | 1127.50
| style="text-align: right;" | 1127.8
+
| style="text-align: right;" | 1127.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1953-08-14
 
| 1953-08-14
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1083.9
+
| style="text-align: right;" | 1083.90
| style="text-align: right;" | 1127.8
+
| style="text-align: right;" | 1127.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1953-08-15
 
| 1953-08-15
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1083.9
+
| style="text-align: right;" | 1083.90
| style="text-align: right;" | 1127.8
+
| style="text-align: right;" | 1127.80
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1953-08-16
 
| 1953-08-16
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1100.6
+
| style="text-align: right;" | 1100.60
| style="text-align: right;" | 1102.8
+
| style="text-align: right;" | 1102.80
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1953-08-16
 
| 1953-08-16
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1125.3
+
| style="text-align: right;" | 1125.30
| style="text-align: right;" | 1126.5
+
| style="text-align: right;" | 1126.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1953-08-18
 
| 1953-08-18
 
| Bullet Perforation
 
| Bullet Perforation
| style="text-align: right;" | 1125.3
+
| style="text-align: right;" | 1125.30
| style="text-align: right;" | 1126.5
+
| style="text-align: right;" | 1126.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1953-08-18
 
| 1953-08-18
| Acid Wash
+
| Acid Wash
| style="text-align: right;" | 1125.3
+
| style="text-align: right;" | 1125.30
| style="text-align: right;" | 1126.5
+
| style="text-align: right;" | 1126.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1953-08-18
 
| 1953-08-18
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1123.2
+
| style="text-align: right;" | 1123.20
| style="text-align: right;" | 1123.2
+
| style="text-align: right;" | 1123.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1959-09-09
 
| 1959-09-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1100.9
+
| style="text-align: right;" | 1100.90
| style="text-align: right;" | 1102.5
+
| style="text-align: right;" | 1102.50
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1959-09-10
 
| 1959-09-10
 
| Acid Treatment
 
| Acid Treatment
| style="text-align: right;" | 1100.9
+
| style="text-align: right;" | 1100.90
| style="text-align: right;" | 1102.5
+
| style="text-align: right;" | 1102.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1959-12-07
 
| 1959-12-07
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 1066.8
+
| style="text-align: right;" | 1066.80
| style="text-align: right;" | 1121.1
+
| style="text-align: right;" | 1121.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 190: Line 296:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  

Revision as of 14:35, 9 July 2020

Well Details

Well ID: 0554251910000
Loading map...
Location: 00/10-19-055-25W4/0
Location Alias: 00/10-19-55-25 W4M
Location Alias 2: 00/10-19-055-25 W4/00
Country: Canada
Province: Alberta
Township: 055
Meridian: 4
Range: 25
Section: 19
County/Municipality: Sturgeon County
Well Name: IMP MORINVILLE 10-19BQ-55-25
Operator Name: Imperial Oil Limited
License Number: 0006664
License Date: 1953-06-30
License Status: RecExempt
Spud Date: 1953-07-02
Final Drill Date: 1953-08-06
Well Total Depth: 1415.80 m
Surface Hole Latitude: 53.768964
Surface Hole Longitude: -113.703685

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-06-30 Obtained License
1953-07-13 Drill Stem Test Performed
1953-07-19 Drill Stem Test Performed
1953-07-22 Drill Stem Test Performed
1953-07-25 Drill Stem Test Performed
1953-08-02 Drill Stem Test Performed
1953-08-05 Drill Stem Test Performed
1953-08-06 Finished Drilling
1953-08-07 Production Casing Operation Performed
1953-08-10 Perforation Treatment Performed - Bullet Perforation
1953-08-11 Perforation Treatment Performed - Bullet Perforation
1953-08-11 Perforation Treatment Performed - Cement Squeeze
1953-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-08-14 Perforation Treatment Performed - Bullet Perforation
1953-08-14 Perforation Treatment Performed - Cement Squeeze
1953-08-15 Perforation Treatment Performed - Cement Squeeze
1953-08-16 Perforation Treatment Performed - Bullet Perforation
1953-08-18 Perforation Treatment Performed - Acid Wash - No Pressure
1953-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1953-08-18 Perforation Treatment Performed - Bullet Perforation
1953-09-01 Well Mode changed to Drilled and Cased
1959-09-09 Perforation Treatment Performed - Jet Perforation
1959-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-12-07 Perforation Treatment Performed - Cement Plug
1959-12-08 Well Abandoned
1959-12-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-08-10 Bullet Perforation 1299.40 1301.20 13
1953-08-10 Bullet Perforation 1302.70 1304.20 13
1953-08-11 Bullet Perforation 1127.50 1127.80 20
1953-08-11 Bullet Perforation 1083.90 1086.30 13
1953-08-11 Cement Squeeze 1299.40 1304.20 0
1953-08-13 Acid Treatment 1127.50 1127.80 0
1953-08-14 Bullet Perforation 1127.50 1127.80 20
1953-08-14 Bullet Perforation 1083.90 1086.30 13
1953-08-14 Acid Treatment 1127.50 1127.80 0
1953-08-14 Cement Squeeze 1083.90 1127.80 0
1953-08-15 Cement Squeeze 1083.90 1127.80 0
1953-08-16 Bullet Perforation 1100.60 1102.80 13
1953-08-16 Bullet Perforation 1125.30 1126.50 13
1953-08-18 Bullet Perforation 1125.30 1126.50 13
1953-08-18 Acid Wash 1125.30 1126.50 0
1953-08-18 Packing Device Capped w/Cement 1123.20 1123.20 0
1959-09-09 Perforation 1100.90 1102.50 13
1959-09-10 Acid Treatment 1100.90 1102.50 0
1959-12-07 Cement Plug 1066.80 1121.10 0

For data sources see[4]



References