If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0625101013000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.355382,"lon":-115.425681,"icon":""}]} |
Location: 00/13-10-062-10W5/0 | |
Location Alias: 00/13-10-62-10 W5M | |
Location Alias 2: 00/13-10-062-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 062 | |
Meridian: 5 | |
Range: 10 | |
Section: 10 | |
County/Municipality: Woodlands County | |
Well Name: CPEC CARIBOU 13-10-62-10 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0418428 | |
License Date: 2010-02-09 | |
License Status: Suspension | |
Spud Date: 2010-02-17 | |
Final Drill Date: 2010-02-23 | |
Well Total Depth: 1604.00 m | |
Surface Hole Latitude: 54.355382 | |
Surface Hole Longitude: -115.425681 |
Date | Event |
---|---|
2010-02-09 | Obtained License |
2010-02-18 | Surface Casing Operation Performed |
2010-02-21 | Production Casing Operation Performed |
2010-02-22 | Well Log Performed |
2010-02-23 | Finished Drilling |
2010-02-23 | Well Mode changed to Drilled and Cased |
2010-02-24 | Rig Released |
2010-02-27 | Perforation Treatment Performed - Jet Perforation |
2010-03-04 | Perforation Treatment Performed - Fractured |
2010-03-08 | Well Began Production |
2010-03-08 | Well Fluid changed to Crude Oil |
2010-03-08 | Well Mode changed to Pumping |
2015-07-01 | Well Fluid changed to Crude Oil |
2015-07-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-27 | Perforation | 1546.00 | 1549.00 | 17 |
2010-03-04 | Fracture | 1546.00 | 1549.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 5529 | 0.0 | 0.0 | 0.0 |
2011 | 8437 | 0.0 | 0.0 | 0.0 |
2012 | 6068 | 0.0 | 0.0 | 0.0 |
2013 | 498 | 0.0 | 0.0 | 0.0 |
For data sources see[5]