If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0676083316022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.836675,"lon":-119.150651,"icon":""}]} |
Location: 02/16-33-067-08W6/2 | |
Location Alias: 02/16-33-67-08 W6M | |
Location Alias 2: 02/16-33-067-08 W6/02 | |
Province: Alberta | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: GAIN 102 HZ WAPITI 16-33-67-8 | |
Operator Name: Gain Energy Ltd. | |
License Number: 0490058 | |
License Date: 2018-07-18 | |
License Status: Amended | |
Spud Date: 2018-08-11 | |
Final Drill Date: 2018-08-20 | |
Well Total Depth: 2487 m | |
Surface Hole Latitude: 54.836675 | |
Surface Hole Longitude: -119.150651 |
Start Date | Depth (m) | Reason |
---|---|---|
2018-08-17 | 837 | Horizontal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-10-01 | Open Hole/Barefoot Completion | 2480.7 | 2487 | 0 |
2018-10-01 | Multi-Stage Fracture | 2417.2 | 2429.7 | 0 |
2018-10-01 | Multi-Stage Fracture | 2377.5 | 2377.6 | 0 |
2018-10-01 | Multi-Stage Fracture | 2326.7 | 2326.8 | 0 |
2018-10-01 | Multi-Stage Fracture | 2276.7 | 2276.8 | 0 |
2018-10-01 | Multi-Stage Fracture | 2225.8 | 2225.9 | 0 |
2018-10-01 | Multi-Stage Fracture | 2175.3 | 2175.4 | 0 |
2018-10-01 | Multi-Stage Fracture | 2124.4 | 2124.5 | 0 |
2018-10-01 | Multi-Stage Fracture | 2073.5 | 2073.6 | 0 |
2018-10-01 | Multi-Stage Fracture | 2023.3 | 2023.4 | 0 |
2018-10-01 | Multi-Stage Fracture | 1972.9 | 1973 | 0 |
2018-10-01 | Multi-Stage Fracture | 1922.5 | 1922.6 | 0 |
2018-10-01 | Multi-Stage Fracture | 1872 | 1872.1 | 0 |
2018-10-01 | Multi-Stage Fracture | 1821.6 | 1821.7 | 0 |
2018-10-01 | Multi-Stage Fracture | 1770.8 | 1770.9 | 0 |
2018-10-01 | Multi-Stage Fracture | 1720.4 | 1720.5 | 0 |
2018-10-01 | Multi-Stage Fracture | 1681 | 1681.1 | 0 |
2018-10-01 | Multi-Stage Fracture | 1630.6 | 1630.7 | 0 |
2018-10-01 | Multi-Stage Fracture | 1579.9 | 1580 | 0 |
2018-10-01 | Multi-Stage Fracture | 1529.6 | 1529.7 | 0 |
2018-10-01 | Multi-Stage Fracture | 1478.7 | 1478.8 | 0 |
2018-10-01 | Multi-Stage Fracture | 1427.5 | 1427.6 | 0 |
2018-10-01 | Multi-Stage Fracture | 1376.4 | 1376.5 | 0 |
2018-10-01 | Multi-Stage Fracture | 1325.2 | 1325.3 | 0 |
2018-10-01 | Multi-Stage Fracture | 1274.5 | 1274.6 | 0 |
For data sources see[4]
Start Date | End Date | Chemical Name | CAS Number | Purpose | Job Percentage | Supplier |
---|---|---|---|---|---|---|
10/01/2018 | 10/01/2018 | non-hazardous ingredients | Trade Secret | Bactericide/Biocide | 0.01 | Calfrac |
Crystalline Silica (Quartz) | 14808-60-7 | 10.1914 | Calfrac |
For data sources see[5]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
9/21/2018 | 10/4/2018 0:00 | Surface Water - River | 4281 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 1081 | 74.1 | 0.0 | 0.0 |
2019 | 813 | 223.7 | 0.0 | 0.0 |
For data sources see[7]