X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-019-21973"

m
m
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-019-21973
 
| Well ID: 34-019-21973
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.68375948, -81.15800565 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.683651931, -81.15770563 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Carroll County, Ohio|Carroll]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 
|-
 
|-
| Operator Name: [[ENERVEST OPERATING L]]
+
| County: [[Carroll_County,_Ohio|Carroll]]
 +
|-
 +
| Municipality: [[Brown_Township,_Carroll_County,_Ohio|Brown Township]]
 +
|-
 +
| Operator Name: [[ENERVEST OPERATING LLC]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: ROBERTSON BILL UNIT
 
|-
 
|-
| First Permit Date:  
+
| License Status: Producing
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2006-03-13
 
|-
 
|-
 
| Spud Date: 2006-04-20
 
| Spud Date: 2006-04-20
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[KILBARGER DRLG]]
 +
|-
 +
| Final Drill Date: 2006-04-25
 +
|-
 +
| Well Total Depth: 5426 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Producing
+
| Latitude: 40.683651931
 +
|-
 +
| Longitude: -81.15770563
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| APP
 +
| 2006-03-13
 +
| Proposed Formations:CLINTON, Issued Date:3/13/2006, Expired Date:3/13/2007 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
 +
|-
 +
| Original Spud
 +
| 2006-04-20
 +
| RBDMS Rec
 +
|-
 +
| Completed
 +
| 2006-04-25
 +
| RBDMS Rec
 +
|-
 +
| Reached Total Depth
 +
| 2006-04-25
 +
| RBDMS Rec
 +
|-
 +
| Completion Report Received
 +
| 2006-05-22
 +
| RBDMS Rec
 +
|-
 +
| Construction Permit Expires
 +
| 2007-03-13
 +
| RBDMS Rec
 
|-
 
|-
| Violations: 0
+
| Change of Owner
 +
| 2010-04-08
 +
| Operator changed from 6674, RANGE RESOURCES-APPALACHIA LLC to 7578, ENERVEST OPERATING LLC
 
|-
 
|-
| Latitude: 40.68375948
+
| Record Last Modified
 +
| 2017-02-15
 +
| RBDMS Rec
 
|-
 
|-
| Longitude: -81.15800565
+
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
| 2006-08-07
 +
| style="text-align: right;" | 5212
 +
| style="text-align: right;" | 5316
 +
| style="text-align: right;" | 34
 
|-
 
|-
 
|}
 
|}
== Production Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
== Stimulations Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Stimulation Date
!scope="col" | GAS QUANTITY
+
!scope="col" style="text-align: center"| Chemical Agent
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" style="text-align: center"| Fracking Fluid Volume
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
!scope="col" | OIL QUANTITY
+
!scope="col" style="text-align: center"| Fracking Company
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Comments
 
|-
 
|-
| 2006-0
 
| style="text-align:right;" | 4100.0
 
 
|  
 
|  
 +
| H2O
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 3682 Bbl
 +
| style="text-align: right;" | 0
 
|  
 
|  
 
|  
 
|  
| style="text-align:right;" | 3607.0
 
|
 
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2006
 +
| [[RANGE RESOURCES-APPALACHIA LLC]]
 +
| style="text-align: right;" | 4100
 +
| style="text-align: right;" | 3607
 +
| style="text-align: right;" | 214
 +
|-
 +
| 2007
 +
| [[RANGE RESOURCES-APPALACHIA LLC]]
 +
| style="text-align: right;" | 4103
 +
| style="text-align: right;" | 2162
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2008
 +
| [[RANGE RESOURCES-APPALACHIA LLC]]
 +
| style="text-align: right;" | 2751
 +
| style="text-align: right;" | 1425
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2009
 +
| [[RANGE RESOURCES-APPALACHIA LLC]]
 +
| style="text-align: right;" | 1987
 +
| style="text-align: right;" | 1069
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2010
 +
| [[ENERVEST OPERATING LLC]]
 +
| style="text-align: right;" | 1787
 +
| style="text-align: right;" | 858
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2011
 +
| [[ENERVEST OPERATING LLC]]
 +
| style="text-align: right;" | 1784
 +
| style="text-align: right;" | 626
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2012
 +
| [[ENERVEST OPERATING LLC]]
 +
| style="text-align: right;" | 1244
 +
| style="text-align: right;" | 624
 +
| style="text-align: right;" | 366
 +
|-
 +
| 2013
 +
| [[ENERVEST OPERATING LLC]]
 +
| style="text-align: right;" | 1405
 +
| style="text-align: right;" | 556
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2014
 +
| [[ENERVEST OPERATING LLC]]
 +
| style="text-align: right;" | 1336
 +
| style="text-align: right;" | 528
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2015
 +
| [[ENERVEST OPERATING LLC]]
 +
| style="text-align: right;" | 872
 +
| style="text-align: right;" | 448
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2016
 +
| [[ENERVEST OPERATING LLC]]
 +
| style="text-align: right;" | 836
 +
| style="text-align: right;" | 339
 +
| style="text-align: right;" | 366
 +
|-
 +
| 2017
 +
| [[ENERVEST OPERATING LLC]]
 +
| style="text-align: right;" | 1117
 +
| style="text-align: right;" | 408
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2018
 +
| [[ENERVEST OPERATING LLC]]
 +
| style="text-align: right;" | 1271
 +
| style="text-align: right;" | 283
 +
| style="text-align: right;" | 365
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 
|-
 
|-
| 2007-0
+
| 2006
| style="text-align:right;" | 4103.0
+
| [[RANGE RESOURCES-APPALACHIA LLC]]
|
+
| Brine
|
+
| style="text-align: right;" | 1140
|
+
| style="text-align: right;" | 214
| style="text-align:right;" | 2162.0
 
|
 
 
|-
 
|-
 +
| 2007
 +
| [[RANGE RESOURCES-APPALACHIA LLC]]
 +
| Brine
 +
| style="text-align: right;" | 630
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2008-0
+
| 2008
| style="text-align:right;" | 2751.0
+
| [[RANGE RESOURCES-APPALACHIA LLC]]
|
+
| Brine
|
+
| style="text-align: right;" | 420
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 1425.0
 
|
 
 
|-
 
|-
 +
| 2009
 +
| [[RANGE RESOURCES-APPALACHIA LLC]]
 +
| Brine
 +
| style="text-align: right;" | 140
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2010-0
+
| 2010
| style="text-align:right;" | 1787.0
+
| [[ENERVEST OPERATING LLC]]
|
+
| Brine
|
+
| style="text-align: right;" | 256
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 858.0
 
|
 
 
|-
 
|-
 +
| 2011
 +
| [[ENERVEST OPERATING LLC]]
 +
| Brine
 +
| style="text-align: right;" | 230
 +
| style="text-align: right;" |
 
|-
 
|-
| 2011-0
+
| 2012
| style="text-align:right;" | 1784.0
+
| [[ENERVEST OPERATING LLC]]
|
+
| Brine
|
+
| style="text-align: right;" | 0
|
+
| style="text-align: right;" | 366
| style="text-align:right;" | 626.0
 
|
 
 
|-
 
|-
 +
| 2013
 +
| [[ENERVEST OPERATING LLC]]
 +
| Brine
 +
| style="text-align: right;" | 207
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2012-0
+
| 2014
| style="text-align:right;" | 1244.0
+
| [[ENERVEST OPERATING LLC]]
|
+
| Brine
|
+
| style="text-align: right;" | 167
|
+
| style="text-align: right;" | 365
| style="text-align:right;" | 624.0
 
|
 
 
|-
 
|-
 +
| 2015
 +
| [[ENERVEST OPERATING LLC]]
 +
| Brine
 +
| style="text-align: right;" | 301
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2013-0
+
| 2016
| style="text-align:right;" | 1405.0
+
| [[ENERVEST OPERATING LLC]]
|
+
| Brine
|
+
| style="text-align: right;" | 203
|
+
| style="text-align: right;" | 366
| style="text-align:right;" | 556.0
 
|
 
 
|-
 
|-
 +
| 2017
 +
| [[ENERVEST OPERATING LLC]]
 +
| Brine
 +
| style="text-align: right;" | 138
 +
| style="text-align: right;" | 365
 
|-
 
|-
| 2014-0
+
| 2018
| style="text-align:right;" | 1336.0
+
| [[ENERVEST OPERATING LLC]]
| style="text-align:right;" | 365.0
+
| Brine
|  
+
| style="text-align: right;" | 192
|  
+
| style="text-align: right;" | 365
| style="text-align:right;" | 528.0
 
| style="text-align:right;" | 365.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - Production Table - Brine Data
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
|publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date =  2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
  | date = 2019-05-07
 +
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
+
|-
!scope="col" | VIOLATION COMMENT
+
| 0170078169
 +
| 2006-05-02
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Inspection revealed that the drilling pits have been completely fenced as required by HB278 rules. No violations at this time.
 +
|-
 +
| 0361279484
 +
| 2018-06-29
 +
| Production Wells
 +
| No Violations
 +
| The well was equipped with a pumping unit and was pumping at the time of inspection.  A  domestic connection with a digital meter was present at the well.  No violations were observed at the time of inspection.
 +
|-
 +
| 0364050880
 +
| 2006-04-27
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Inspection revealed that Kilbarger Drilling is moving off location . No violations at this time .
 +
|-
 +
| 0644060379
 +
| 2006-05-08
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Inspection revealed that drilling pits are completely covered and location graded . The drilling pits were solidified last Wednesday (05/03/06) and mostly covered at that time. No violations at this time.
 +
|-
 +
| 0703685226
 +
| 2006-05-03
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| On site to witness the soildification of the drilling pits as required by the drilling permit . Robexco is using a trac-hoe to mix the solidification material. Chem-Tech brought the solidification material earlier this morning (app. 24 tons of material for both the pits). Pits were full of materials so I advised the hoe operator ( Jon Eick ) that he could dig a couple of laterals to take care of the excess solidified material . No violations at this time .
 
|-
 
|-
 
| 1080027365
 
| 1080027365
 
| 2006-04-26
 
| 2006-04-26
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| Inspection revealed that Kilbarger Drilling has finished drilling the well and are running 4 1/2 casing at this time . Inspection of the drilling pits revealed that the pit liners are intact and the fluid levels are acceptable. No violations at this time.
 
| Inspection revealed that Kilbarger Drilling has finished drilling the well and are running 4 1/2 casing at this time . Inspection of the drilling pits revealed that the pit liners are intact and the fluid levels are acceptable. No violations at this time.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1119455005
 
| 1119455005
 
| 2006-04-10
 
| 2006-04-10
|  
+
| Drill / Deepen /  Reopen
| On site to check the status of the wellsite construction . Inspection revealed that they have finished building the location but haven't dug the drilling pits at this time . I inspected the silt fence and found that it has been properly installed along the entire south edge of the location . No violations at this time .
+
| No Violations
|
+
| On site to check the status of the wellsite construction . Inspection revealed that they have finished building the location but havent dug the drilling pits at this time . I inspected the silt fence and found that it has been properly installed along the entire south edge of the location . No violations at this time .
|
 
|
 
 
|-
 
|-
 +
| 1589994381
 +
| 2017-02-22
 +
| Production Wells
 +
| No Violations
 +
| The well is equipped with an electrically-driven pumpjack.  The production valves were in the open position nd a domestic connection with a meter and drip bottle were present at the well.  The tank battery consist of one 210 bbl production tank, one 50 bbl brine tank, one vertical separator, one drip bottle, and one meter run.  The dike surrounding the tank battery is in good repair.  The load line was equipped with plugs. Proper identification was posted at the well and tank battery. The lease road is stable.
 
|-
 
|-
 
| 1649776744
 
| 1649776744
 
| 2006-04-23
 
| 2006-04-23
|  
+
| Drill / Deepen /  Reopen
| Inspection revealed that Kilbarger Drilling is at 1663' at 10:25 am . Pit liners are intact and fluid levels are acceptable at this time . No violations at this time .
+
| No Violations
|
+
| Inspection revealed that Kilbarger Drilling is at 1663 at 10:25 am . Pit liners are intact and fluid levels are acceptable at this time . No violations at this time .
|
 
|
 
|-
 
|-
 
| -170078169
 
| 2006-05-02
 
|
 
| Inspection revealed that the drilling pits have been completely fenced as required by HB278 rules. No violations at this time.
 
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1751962838
 
| 1751962838
 
| 2006-04-24
 
| 2006-04-24
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| Inspection revealed that Kilbarger Drilling is at 3822 at noon . The daylight driller advised that they should be finishing the well on Wednesday afternoon sometime . No violations at this time .
 
| Inspection revealed that Kilbarger Drilling is at 3822 at noon . The daylight driller advised that they should be finishing the well on Wednesday afternoon sometime . No violations at this time .
|
 
|
 
|
 
 
|-
 
|-
 +
| 1764183823
 +
| 2018-02-03
 +
| Production Wells
 +
| No Violations
 +
| The well was equipped with an electrically-driven pumping unit.  No violations were observed at the well or tank battery at the time of inspection.
 
|-
 
|-
 
| 1940671212
 
| 1940671212
 
| 2006-04-20
 
| 2006-04-20
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| Inspection revealed that Kilbarger Drilling is moving on location and Robexco is digging the drilling pits with a trac-hoe. No violations at this time .
 
| Inspection revealed that Kilbarger Drilling is moving on location and Robexco is digging the drilling pits with a trac-hoe. No violations at this time .
|
 
|
 
|
 
|-
 
 
|-
 
|-
| -1941553738
+
| 1941553738
 
| 2006-05-01
 
| 2006-05-01
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| Inspection revealed that somebody has removed part of the fencing around the drilling pits . I called Rick Keppler ( Great Lakes Energy) and advised that the fencing must be installed immediately around the drilling pits. He advised that he was going to call somebody to install the fence ASAP . I advised that I would check the site later today or early tomorrow morning to see if the fencing has been installed .
 
| Inspection revealed that somebody has removed part of the fencing around the drilling pits . I called Rick Keppler ( Great Lakes Energy) and advised that the fencing must be installed immediately around the drilling pits. He advised that he was going to call somebody to install the fence ASAP . I advised that I would check the site later today or early tomorrow morning to see if the fencing has been installed .
|
 
|
 
|
 
|-
 
 
|-
 
|-
| -1998676509
+
| 1998676509
 
| 2012-05-21
 
| 2012-05-21
|  
+
| Preliminary Restoration
 +
| No Violations
 
| My inspection found a Preliminary Restoration is due for this well.  The Preliminary Restoration can be passed and the well is producing.  There are no violations noted at this time.
 
| My inspection found a Preliminary Restoration is due for this well.  The Preliminary Restoration can be passed and the well is producing.  There are no violations noted at this time.
|
 
|
 
|
 
|-
 
 
|-
 
|-
| -2097481884
+
| 2097481884
 
| 2006-05-24
 
| 2006-05-24
|  
+
| Production Wells
 +
| No Violations
 
| Inspection revealed that the well is in production at this time . No violations at this time.
 
| Inspection revealed that the well is in production at this time . No violations at this time.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2102710540
 
| 2102710540
 
| 2006-04-05
 
| 2006-04-05
|  
+
| Drill / Deepen /  Reopen
| Inspection revealed that Robertson Excavating is clearing and building the location. Rick Keppler (Great Lakes Energy) gave me prior notification about Robertson Excavating being ready to start working on the location today . A crew is loading debris (tires/trash) into trash dumpsters while a trac-hoe and dozer are building the location. They haven't started digging the drilling pits as of this time. Silt fence is being installed along the south edge of the location. No violations at this time. The drilling rig should be ready to move onto location next week . I will check the site on Monday to see if they have completed the location.
+
| No Violations
|
+
| Inspection revealed that Robertson Excavating is clearing and building the location. Rick Keppler (Great Lakes Energy) gave me prior notification about Robertson Excavating being ready to start working on the location today . A crew is loading debris (tires/trash) into trash dumpsters while a trac-hoe and dozer are building the location. They havent started digging the drilling pits as of this time. Silt fence is being installed along the south edge of the location. No violations at this time. The drilling rig should be ready to move onto location next week . I will check the site on Monday to see if they have completed the location.
|
 
|
 
 
|-
 
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 
|-
 
|-
| -364050880
+
|}-->
| 2006-04-27
 
|
 
| Inspection revealed that Kilbarger Drilling is moving off location . No violations at this time .
 
|
 
|
 
|
 
|-
 
|-
 
| 644060379
 
| 2006-05-08
 
|
 
| Inspection revealed that drilling pits are completely covered and location graded . The drilling pits were solidified last Wednesday (05/03/06) and mostly covered at that time. No violations at this time.
 
|
 
|
 
|
 
|-
 
|-
 
| 703685226
 
| 2006-05-03
 
|
 
| On site to witness the soildification of the drilling pits as required by the drilling permit . Robexco is using a trac-hoe to mix the solidification material. Chem-Tech brought the solidification material earlier this morning (app. 24 tons of material for both the pits). Pits were full of materials so I advised the hoe operator ( Jon Eick ) that he could dig a couple of laterals to take care of the excess solidified material . No violations at this time .
 
|
 
|
 
|
 
|-
 
|}
 
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Revision as of 08:25, 31 July 2019

Well Details

Well ID: 34-019-21973
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Brown Township
Operator Name: ENERVEST OPERATING LLC
Well Pad ID:
Farm/Lease Name: ROBERTSON BILL UNIT
License Status: Producing
License Date: 2006-03-13
Spud Date: 2006-04-20
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2006-04-25
Well Total Depth: 5426 ft
Configuration: Vertical
Latitude: 40.683651931
Longitude: -81.15770563

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2006-03-13 Proposed Formations:CLINTON, Issued Date:3/13/2006, Expired Date:3/13/2007 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Original Spud 2006-04-20 RBDMS Rec
Completed 2006-04-25 RBDMS Rec
Reached Total Depth 2006-04-25 RBDMS Rec
Completion Report Received 2006-05-22 RBDMS Rec
Construction Permit Expires 2007-03-13 RBDMS Rec
Change of Owner 2010-04-08 Operator changed from 6674, RANGE RESOURCES-APPALACHIA LLC to 7578, ENERVEST OPERATING LLC
Record Last Modified 2017-02-15 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-08-07 5212 5316 34

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 15 3682 Bbl 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2006 RANGE RESOURCES-APPALACHIA LLC 4100 3607 214
2007 RANGE RESOURCES-APPALACHIA LLC 4103 2162 365
2008 RANGE RESOURCES-APPALACHIA LLC 2751 1425 365
2009 RANGE RESOURCES-APPALACHIA LLC 1987 1069 365
2010 ENERVEST OPERATING LLC 1787 858 365
2011 ENERVEST OPERATING LLC 1784 626 0
2012 ENERVEST OPERATING LLC 1244 624 366
2013 ENERVEST OPERATING LLC 1405 556 365
2014 ENERVEST OPERATING LLC 1336 528 365
2015 ENERVEST OPERATING LLC 872 448 365
2016 ENERVEST OPERATING LLC 836 339 366
2017 ENERVEST OPERATING LLC 1117 408 365
2018 ENERVEST OPERATING LLC 1271 283 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2006 RANGE RESOURCES-APPALACHIA LLC Brine 1140 214
2007 RANGE RESOURCES-APPALACHIA LLC Brine 630 365
2008 RANGE RESOURCES-APPALACHIA LLC Brine 420 365
2009 RANGE RESOURCES-APPALACHIA LLC Brine 140 365
2010 ENERVEST OPERATING LLC Brine 256 365
2011 ENERVEST OPERATING LLC Brine 230
2012 ENERVEST OPERATING LLC Brine 0 366
2013 ENERVEST OPERATING LLC Brine 207 365
2014 ENERVEST OPERATING LLC Brine 167 365
2015 ENERVEST OPERATING LLC Brine 301 365
2016 ENERVEST OPERATING LLC Brine 203 366
2017 ENERVEST OPERATING LLC Brine 138 365
2018 ENERVEST OPERATING LLC Brine 192 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0170078169 2006-05-02 Drill / Deepen / Reopen No Violations Inspection revealed that the drilling pits have been completely fenced as required by HB278 rules. No violations at this time.
0361279484 2018-06-29 Production Wells No Violations The well was equipped with a pumping unit and was pumping at the time of inspection. A domestic connection with a digital meter was present at the well. No violations were observed at the time of inspection.
0364050880 2006-04-27 Drill / Deepen / Reopen No Violations Inspection revealed that Kilbarger Drilling is moving off location . No violations at this time .
0644060379 2006-05-08 Drill / Deepen / Reopen No Violations Inspection revealed that drilling pits are completely covered and location graded . The drilling pits were solidified last Wednesday (05/03/06) and mostly covered at that time. No violations at this time.
0703685226 2006-05-03 Drill / Deepen / Reopen No Violations On site to witness the soildification of the drilling pits as required by the drilling permit . Robexco is using a trac-hoe to mix the solidification material. Chem-Tech brought the solidification material earlier this morning (app. 24 tons of material for both the pits). Pits were full of materials so I advised the hoe operator ( Jon Eick ) that he could dig a couple of laterals to take care of the excess solidified material . No violations at this time .
1080027365 2006-04-26 Drill / Deepen / Reopen No Violations Inspection revealed that Kilbarger Drilling has finished drilling the well and are running 4 1/2 casing at this time . Inspection of the drilling pits revealed that the pit liners are intact and the fluid levels are acceptable. No violations at this time.
1119455005 2006-04-10 Drill / Deepen / Reopen No Violations On site to check the status of the wellsite construction . Inspection revealed that they have finished building the location but havent dug the drilling pits at this time . I inspected the silt fence and found that it has been properly installed along the entire south edge of the location . No violations at this time .
1589994381 2017-02-22 Production Wells No Violations The well is equipped with an electrically-driven pumpjack. The production valves were in the open position nd a domestic connection with a meter and drip bottle were present at the well. The tank battery consist of one 210 bbl production tank, one 50 bbl brine tank, one vertical separator, one drip bottle, and one meter run. The dike surrounding the tank battery is in good repair. The load line was equipped with plugs. Proper identification was posted at the well and tank battery. The lease road is stable.
1649776744 2006-04-23 Drill / Deepen / Reopen No Violations Inspection revealed that Kilbarger Drilling is at 1663 at 10:25 am . Pit liners are intact and fluid levels are acceptable at this time . No violations at this time .
1751962838 2006-04-24 Drill / Deepen / Reopen No Violations Inspection revealed that Kilbarger Drilling is at 3822 at noon . The daylight driller advised that they should be finishing the well on Wednesday afternoon sometime . No violations at this time .
1764183823 2018-02-03 Production Wells No Violations The well was equipped with an electrically-driven pumping unit. No violations were observed at the well or tank battery at the time of inspection.
1940671212 2006-04-20 Drill / Deepen / Reopen No Violations Inspection revealed that Kilbarger Drilling is moving on location and Robexco is digging the drilling pits with a trac-hoe. No violations at this time .
1941553738 2006-05-01 Drill / Deepen / Reopen No Violations Inspection revealed that somebody has removed part of the fencing around the drilling pits . I called Rick Keppler ( Great Lakes Energy) and advised that the fencing must be installed immediately around the drilling pits. He advised that he was going to call somebody to install the fence ASAP . I advised that I would check the site later today or early tomorrow morning to see if the fencing has been installed .
1998676509 2012-05-21 Preliminary Restoration No Violations My inspection found a Preliminary Restoration is due for this well. The Preliminary Restoration can be passed and the well is producing. There are no violations noted at this time.
2097481884 2006-05-24 Production Wells No Violations Inspection revealed that the well is in production at this time . No violations at this time.
2102710540 2006-04-05 Drill / Deepen / Reopen No Violations Inspection revealed that Robertson Excavating is clearing and building the location. Rick Keppler (Great Lakes Energy) gave me prior notification about Robertson Excavating being ready to start working on the location today . A crew is loading debris (tires/trash) into trash dumpsters while a trac-hoe and dozer are building the location. They havent started digging the drilling pits as of this time. Silt fence is being installed along the south edge of the location. No violations at this time. The drilling rig should be ready to move onto location next week . I will check the site on Monday to see if they have completed the location.

For data sources see[9]

References