If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-003-00696 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.36459,"lon":-79.96061,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Allegheny | |
Municipality: Baldwin Township | |
Operator Name: EQT PROD CO | |
Well Pad ID: | |
Farm/Lease Name: JOHN WALLACE | |
License Status: Plugged and Abandoned | |
Spud Date: 2016-01-07 | |
Permit Date: | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: No | |
Latitude: 40.364590 | |
Longitude: -79.960610 |
Date | Event |
---|---|
1916-01-01 | NEWLY DRILLED |
1916-03-14 | Drilling Completion |
2018-07-24 | Begin Plugging |
2019-02-07 | Finished Plugging |
2019-08-09 | Fully Plugged |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
1991 | EQUITRANS INC | 5216.00 | 363 | 0.00 | 0 | 0.00 | 0 |
1994 | EQUITABLE GAS CO | 4,860.00 | 365 | 0.00 | 0 | 0.00 | 0 |
1995 | EQUITABLE GAS CO | 5,905.00 | 365 | 0.00 | 0 | 0.00 | 0 |
1996 | EQUITABLE GAS CO | 6030 | 365 | 0.00 | 0 | 0.00 | 0 |
1997 | EQUITABLE GAS CO | 5389 | 365 | 0.00 | 0 | 0.00 | 0 |
1998 | EQUITABLE GAS CO | 6220 | 365 | 0.00 | 0 | 0.00 | 0 |
1999 | EQUITABLE GAS CO | 7328 | 365 | 0.00 | 0 | 0.00 | 0 |
2000 | EQUITABLE GAS CO | 7258 | 365 | 0.00 | 0 | 0.00 | 0 |
2001 | EQUITABLE GAS CO | 6864 | 365 | 0.00 | 0 | 0.00 | 0 |
2004 | EQUITABLE GAS CO | 4780 | 366 | 0.00 | 0 | 0.00 | 0 |
2010 | EQUITABLE GAS CO | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | EQUITABLE GAS CO | 4,403.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2012 | EQUITABLE GAS CO | 4,053.00 | 336 | 0.00 | 0 | 0.00 | 0 |
2013 | EQUITABLE GAS CO | 3,667.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2014 | PEOPLES NATURAL GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | PEOPLES NATURAL GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | PEOPLES NATURAL GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | EQT PROD CO | 2,042.00 | 184 | 0.00 | 0 | 0.00 | 0 |
2018 | EQT PROD CO | 4,078.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2756988 | Primary Facility | 2018-07-27 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | This well is being set up for the plugging rig. The well was killed to control leaking gas. The well was not leaking at the time of this inspection. |
2761061 | Primary Facility | 2018-08-07 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | At the time of inspection the Operator was installing secondary containment in preparation for the for well plugging operations to begin. The E&S plan was on site. The well tag was affixed to the well. The PPC plan was not on site. The ER plan was not on site. The Waste control and disposal plan was not on site. The Department recommends the the PPC plan, ER plan and Waste Control and Disposal plan be placed on site prior to the commencement of plugging operation begins. |
2761638 | Primary Facility | 2018-08-08 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | The site, E&S, and the well are all in good condition. The plugging rig is not yet on the pad. |
2762310 | Primary Facility | 2018-08-09 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Hydrocarbon Well Services has a rig on the pad to plug this well. Crews are preparing the site and the rig is still down. |
2763549 | Primary Facility | 2018-08-14 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Hydrocarbon Well Services is preparing to run 1" tubing inside the 2" to TD. The 1" will be used as the cement string. There is 2,082' of 2" with a HW Packer. |
2766053 | Primary Facility | 2018-08-20 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Hydrocarbon has been flushing water down an 1." String to try and clean out below the 2" packer. So far they have not made any progress. The packer is set at 2,082'. They are open to 2,206'. The original TD for this well is 3,298'. |
2766778 | Primary Facility | 2018-08-23 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Hydrocarbon WEll Services has been cleaning out open hole below a 2" packer at 2,307'. The 2" packer is set in open hole at 2,082'. It appears the bottom section of this hole has been plugged. Hydrocarbon is going to get a sample of the very hard material at 2,307' to see if it is cement. |
2779833 | Primary Facility | 2018-09-18 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | The 2" pipe was cut at its free point (740'). An effort was made to run a grout string along the remaining 2" but it was not possible. A bigger rig might be needed to drill to the packer |
2786772 | Primary Facility | 2018-10-10 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Site will be enlarged for a bigger rig to complete this plug job. The smaller service rig was not set up to drill out obstructions in the well. There are not any workers on the site. |
2802668 | Primary Facility | 2018-11-14 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Hydrocarbon is putting down padding to set their rig on. Rig should be up tomorrow. |
2804260 | Primary Facility | 2018-11-15 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Hydrocarbon has set up a bigger service rig to finish plugging this well. At this time they are waiting on gravel for their work area. |
2807572 | Primary Facility | 2018-11-28 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Hydrocarbon is set up to remove or drill out stuck tubing and packer. The packer is set at 2,082' with severed tubing on top of it. KLX is on the site to supply the proper tools and instruct the plugging crew on their use. |
2808790 | Primary Facility | 2018-11-29 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Hydrocarbon is setting up equipment to run washover pipe. They plan to drill through an obstruction a few hundred feet down the well where the severed tubing top is located. |
2810270 | Primary Facility | 2018-12-04 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Hydrocarbon is drilling with wash-over pipe at a depth of 720'. There were some obstructions from 450' to 520' but they were not solid plugs. |
2822919 | Primary Facility | 2019-01-07 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | Hydrocarbon is cleaning out above 2" open-hole packer. The well is cemented below the packer. After the hole is clear they will cement up to the 7" casing. |
2842691 | Primary Facility | 2019-02-21 | Routine/Complete Inspection | No Violations Noted | This well was plugged. The marker has been raised to remain above ground after the site has been reclaimed. Excavators are working on the site restoration. |
For data sources see[6]