X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30743"

m (Wiki moved page 005-30743 to 42-005-30743)
m
 
(12 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
{| class="wikitable" width="95%"
+
{| class="wikitable welldetails" width="95%"
| Well ID: 005-30743
+
| Well ID: 37-005-30743
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.808761, -79.574847 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.808761, -79.574847 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Armstrong County, Pennsylvania|Armstrong]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[East Franklin Township, Armstrong County, Pennsylvania|East Franklin Township]]
+
| State: Pennsylvania
 
|-
 
|-
| Operator Name: [[SNYDER BROS INC|SNYDER BROS INC]]
+
| County: [[Armstrong_County,_Pennsylvania|Armstrong]]
 +
|-
 +
| Municipality: [[East Franklin Township,_Armstrong_County,_Pennsylvania|East Franklin Township]]
 +
|-
 +
| Operator Name: [[SNYDER BROS INC]]
 +
|-
 +
| Well Pad ID: [[147038]]
 
|-
 
|-
 
| Farm/Lease Name: BVL - SOLOSKI 5-249
 
| Farm/Lease Name: BVL - SOLOSKI 5-249
 
|-
 
|-
| First Permit Date: 2010-12-09
+
| License Status:  
 
|-
 
|-
| Last Permit Date: 2010-12-09
+
| Spud Date:  
 
|-
 
|-
| Spud Date: 2011-03-07
+
| Permit Date: 2010-12-09
 
|-
 
|-
| Unconventional: Yes
+
| Well Type: GAS
 
|-
 
|-
| Horizontal: No
+
| Unconventional Well: Y
 
|-
 
|-
| Producing: Yes
+
| Configuration: Vertical Well
 
|-
 
|-
| Violations: None
+
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 40.808761
 
| Latitude: 40.808761
 
|-
 
|-
 
| Longitude: -79.574847
 
| Longitude: -79.574847
|-
 
 
|}
 
|}
__TOC__
+
For data sources see<ref>{{cite web
== Well Inspection Data ==
+
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Date
!scope="col" | DATE
+
!scope="col" | Event
!scope="col" | DESCRIPTION
 
!scope="col" | COMMENT
 
!scope="col" | VIOLATION ID
 
 
|-
 
|-
| 1973553
+
| 2010-12-09
| 2011-05-17
+
| New Permit Application
| No Violations Noted
+
|-
| Site ID sign and E&S plan located.  Site construction underway.  Earthmoving activities are being completed.  The pit is excavated and lined.  There are no E&S concerns on the access road or well site.
+
| 2011-03-07
|  
+
| Performed Spud Operation
 
|-
 
|-
 +
| 2011-03-16
 +
| Drilling Completion
 
|-
 
|-
| 1973555
+
| 2011-06-03
| 2011-04-18
+
| Perforation
| No Violations Noted
 
| Site ID sign and E&S plan located.  Site prep started, but not finished.  No crews or equipment on-site.  There are no E&S concerns on the access road or well site. 
 
 
 
This spud has been postponed until the rig is available. 
 
 
 
|  
 
 
|-
 
|-
 +
| 2013-05-15
 +
| NEWLY DRILLED
 
|-
 
|-
| 1976054
+
|}
| 2011-05-19
+
For data sources see<ref>{{cite web
| No Violations Noted
+
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
| Well shut in on 4 1/2" x 2" swage.
+
| date = 2020-02-27
Flowback pit finished being lined at time of inspection.  Met w/Operator rep Terry Miller.
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
7" x 4 1/2" annulus closed.
+
| accessdate = 2020-02-27 }}</ref>
Drilling pit lined and freeboard maintained.
+
<!--== Fracking Activities ==
 
+
==== Fracking Jobs ====
|  
+
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
| 2042402
+
|}-->
| 2012-02-10
+
 
| No Violations Noted
+
<!--== Stimulation Data ==
| Drilling was completed on 06/07/11.  Well appeared to be equipped for production.  Brine tanks located onsite and they appeared to be in sound condition.  Site had been properly regraded, seeded and mulched.  The operator should monitor the site to insure that 70% uniform vegetative cover is achieved.
+
{| class="wikitable sortable" width="95%"
|  
+
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
|}
+
|}-->
 +
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2012-2
+
| 2010
| style="text-align:right;" | 17313.0
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 180.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2011
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 20,687.00
 +
| style="text-align: right;" | 89
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2012-1
+
| 2012
| style="text-align:right;" | 24757.0
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 182.0
+
| style="text-align: right;" | 42,070.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 362
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2013
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 27,715.00
 +
| style="text-align: right;" | 361
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-2
+
| 2014
| style="text-align:right;" | 20687.0
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 89.0
+
| style="text-align: right;" | 20,619.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 352
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2015
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 15,186.00
 +
| style="text-align: right;" | 348
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2011-1
+
| 2016
| style="text-align:right;" | 0.0
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 12,468.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 357
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 12,152.00
 +
| style="text-align: right;" | 359
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2010-2
+
| 2018
| style="text-align:right;" | 0.0
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 11,030.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 331
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 9,117.00
 +
| style="text-align: right;" | 349
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Operator
!scope="col" | QUANTITY
+
!scope="col" | Waste Type
!scope="col" | UNITS
+
!scope="col" | Quantity
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Disposal Method
!scope="col" | WASTE FACILITY PERMIT ID
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY NAME
+
|-
!scope="col" | FACILITY CITY
+
| 2011
!scope="col" | FACILITY STATE
+
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 285.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21893
 
|-
 
|-
| 2012-2
+
| 2011
| PRODUCED FLUID
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 100.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 220.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123SW008
+
| PA0254185
| AQUATIC SYNTHESIS UNLIMITED, LLC (KAY ARENA)
 
| INDIANA
 
| PA
 
 
|-
 
|-
 +
| 2011
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 180.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23795
 
|-
 
|-
| 2011-2
+
| 2012
| PRODUCED FLUID
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 180.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 85.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-23795
+
| 34-155-23584
| PANDER #1 (SWIW #15)
 
| NEWTON FALLS
 
| OH
 
 
|-
 
|-
 +
| 2012
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 80.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21438
 
|-
 
|-
| 2011-2
+
| 2012
| PRODUCED FLUID
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 220.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 100.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0254185
+
| WMGR123SW008
| RESERVED ENVIRONMENTAL SERVICES
 
| MOUNT PLEASANT
 
| PA
 
 
|-
 
|-
 +
| 2013
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 194.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21438
 
|-
 
|-
| 2011-2
+
| 2014
| PRODUCED FLUID
+
| [[SNYDER BROS INC]]
| style="text-align:right;" | 285.0
+
| Produced Fluid
| Bbl
+
| style="text-align: right;" | 50.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-155-21893
+
| 34-155-21438
| WOLF #1 DISP WELL (PANDER RAY TRUCKING INC)
+
|-
| NEWTON FALLS
+
| 2015
| OH
+
| [[SNYDER BROS INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 120.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW009
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 1973553
 +
| Primary Facility
 +
| 2011-05-17
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Site ID sign and E&S plan located.  Site construction underway.  Earthmoving activities are being completed.  The pit is excavated and lined.  There are no E&S concerns on the access road or well site.
 
|-
 
|-
 +
| 1973555
 +
| Primary Facility
 +
| 2011-04-18
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Site ID sign and E&S plan located.  Site prep started, but not finished.  No crews or equipment on-site.  There are no E&S concerns on the access road or well site.
 
|-
 
|-
| 2012-1
+
| 1976054
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 80.0
+
| 2011-05-19
| Bbl
+
| Drilling/Alteration
| INJECTION DISPOSAL WELL
+
| No Violations Noted
| 34-155-21438
+
| Well shut in on 4 1/2" x 2" swage.
| KLEESE #1 (SWIW #18) - KLEESE DEVELOPMENT ASSOCS
 
| VIENNA
 
| OH
 
 
|-
 
|-
 +
| 2042402
 +
| Primary Facility
 +
| 2012-02-10
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Drilling was completed on 06/07/11.  Well appeared to be equipped for production.  Brine tanks located onsite and they appeared to be in sound condition.  Site had been properly regraded, seeded and mulched.  The operator should monitor the site to insure that 70% uniform vegetative cover is achieved.
 
|-
 
|-
| 2012-1
+
| 2473342
| PRODUCED FLUID
+
| Primary Facility
| style="text-align:right;" | 85.0
+
| 2016-04-11
| Bbl
+
| Site Restoration
| INJECTION DISPOSAL WELL
+
| No Violations Noted
| 34-155-23584
+
| Well appeared to be equipped for production.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.  Brine tank located onsite and it appeared to be in sound condition.  The majority of the vegetation had attained 70% vegetative cover.
| KOONTZ #1 DISPOSAL WELL
 
| WARREN
 
| OH
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
{{Reflist}}
+
<references/>
 
 
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 +
[[Category:Pennsylvania Wells]]

Latest revision as of 08:57, 21 May 2020

Well Details

Well ID: 37-005-30743
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: East Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 147038
Farm/Lease Name: BVL - SOLOSKI 5-249
License Status:
Spud Date:
Permit Date: 2010-12-09
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.808761
Longitude: -79.574847

For data sources see[1][2][3]

Well History

Date Event
2010-12-09 New Permit Application
2011-03-07 Performed Spud Operation
2011-03-16 Drilling Completion
2011-06-03 Perforation
2013-05-15 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 SNYDER BROS INC 0.00 0 0.00 0 0.00 0
2011 SNYDER BROS INC 20,687.00 89 0.00 0 0.00 0
2012 SNYDER BROS INC 42,070.00 362 0.00 0 0.00 0
2013 SNYDER BROS INC 27,715.00 361 0.00 0 0.00 0
2014 SNYDER BROS INC 20,619.00 352 0.00 0 0.00 0
2015 SNYDER BROS INC 15,186.00 348 0.00 0 0.00 0
2016 SNYDER BROS INC 12,468.00 357 0.00 0 0.00 0
2017 SNYDER BROS INC 12,152.00 359 0.00 0 0.00 0
2018 SNYDER BROS INC 11,030.00 331 0.00 0 0.00 0
2019 SNYDER BROS INC 9,117.00 349 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 SNYDER BROS INC Produced Fluid 285.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2011 SNYDER BROS INC Produced Fluid 220.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2011 SNYDER BROS INC Produced Fluid 180.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2012 SNYDER BROS INC Produced Fluid 85.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2012 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2012 SNYDER BROS INC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW008
2013 SNYDER BROS INC Produced Fluid 194.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2014 SNYDER BROS INC Produced Fluid 50.00 Bbl INJECTION DISPOSAL WELL 34-155-21438
2015 SNYDER BROS INC Produced Fluid 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1973553 Primary Facility 2011-05-17 Routine/Complete Inspection No Violations Noted Site ID sign and E&S plan located. Site construction underway. Earthmoving activities are being completed. The pit is excavated and lined. There are no E&S concerns on the access road or well site.
1973555 Primary Facility 2011-04-18 Routine/Complete Inspection No Violations Noted Site ID sign and E&S plan located. Site prep started, but not finished. No crews or equipment on-site. There are no E&S concerns on the access road or well site.
1976054 Primary Facility 2011-05-19 Drilling/Alteration No Violations Noted Well shut in on 4 1/2" x 2" swage.
2042402 Primary Facility 2012-02-10 Routine/Complete Inspection No Violations Noted Drilling was completed on 06/07/11. Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Site had been properly regraded, seeded and mulched. The operator should monitor the site to insure that 70% uniform vegetative cover is achieved.
2473342 Primary Facility 2016-04-11 Site Restoration No Violations Noted Well appeared to be equipped for production. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Brine tank located onsite and it appeared to be in sound condition. The majority of the vegetation had attained 70% vegetative cover.

For data sources see[7]

References