X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-005-30934

Well Details

Well ID: 37-005-30934
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: North Buffalo Township
Operator Name: SNYDER BROS INC
Well Pad ID: 146703
Farm/Lease Name: DANIEL J SMICIK ETUX 1M-71
License Status:
Spud Date:
Permit Date: 2011-11-21
Well Type: GAS
Unconventional Well: Y
Configuration: Vertical Well
Conservation: Yes
Latitude: 40.802531
Longitude: -79.656464

For data sources see[1][2][3]

Well History

Date Event
2011-11-21 New Permit Application
2012-02-14 Performed Spud Operation
2012-02-29 Drilling Completion
2012-04-24 Perforation
2014-04-15 NEWLY DRILLED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-04-24 2012-04-24 6,582 120,420

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 CLAY TREAT LT Superior Well Services Clay Control Choline chloride 67-48-1 80.00 0.05
ACID INHIBITOR 2 Superior Well Services Acid Corrosion Inhibitor
KR-153SL Superior Well Services Biocide Polyethylene glycol 25322-68-3 50.00 0.18
Diethylene glycol 111-46-6 3.50 0.01
Ethylene glycol 107-21-1 1.00 0.00365000
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20.00 0.07
Hydrochloric Acid Superior Well Services Cement/Formation Breakdown Water 7732-18-5 92.50 16.90
Hydrochloric acid 7647-01-0 7.50 1.37
Super 100NE Superior Well Services Surfactant/Foamer Isopropanol 67-63-0 30.00 2.94
2-Butoxyethanol 111-76-2 7.00 0.68
ICP-1000 Superior Well Services Iron Control Additive 1,2-Propylene glycol 57-55-6 50.00 0.36
ANIONIC COPOLYMER 50.00 0.36
WFR-3B Superior Well Services Friction Reducer Ethoxylated C12-16 alcohols 68551-12-2 4.00 0.26
Stoddard solvent 8052-41-3 10.00 0.65
1,2-Propylene glycol 57-55-6 25.00 1.63
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 1.96
ACID INHIBITOR 2 Superior Well Services Acid Corrosion
SUPER TSC Superior Well Services Paraffin & Scale Additive
ACID INHIBITOR 2 Superior Well Services Inhibitor
Propargyl alcohol 107-19-7 30.00 0.02
PROPRIETARY 7.00 0.00512000
2-Butoxyethanol 111-76-2 30.00 0.02
Isopropanol 67-63-0 30.00 0.02
SUPER TSC Superior Well Services Scale Control ANIONIC COPOLYMER 10.00 0.03
1,2,4-Butanetricarboxylic acid, 2-phosphono- 37971-36-1 10.00 0.03
ANIONIC POLYMER 10.00 0.03
1,2-Propylene glycol 57-55-6 50.00 0.18

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 SNYDER BROS INC 0.00 0 0.00 0 0.00 0
2012 SNYDER BROS INC 32,343.00 356 0.00 0 0.00 0
2013 SNYDER BROS INC 28,759.00 365 0.00 0 0.00 0
2014 SNYDER BROS INC 19,352.00 365 0.00 0 0.00 0
2015 SNYDER BROS INC 15,411.00 360 0.00 0 0.00 0
2016 SNYDER BROS INC 12,531.00 333 0.00 0 0.00 0
2017 SNYDER BROS INC 9,745.00 355 0.00 0 0.00 0
2018 SNYDER BROS INC 6,532.00 342 0.00 0 0.00 0
2019 SNYDER BROS INC 6,265.00 352 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 SNYDER BROS INC Produced Fluid 85.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2012 SNYDER BROS INC Drilling Fluid Waste 1,560.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 SNYDER BROS INC Fracing Fluid Waste 220.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW008
2012 SNYDER BROS INC Drilling Fluid Waste 85.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE EPA ID: 748-163
2012 SNYDER BROS INC Produced Fluid 60.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW008
2012 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2012 SNYDER BROS INC Produced Fluid 80.00 Bbl INJECTION DISPOSAL WELL 34-155-21893
2013 SNYDER BROS INC Produced Fluid 95.00 Bbl INJECTION DISPOSAL WELL 34-155-23795
2014 SNYDER BROS INC Produced Fluid 93.00 Bbl INJECTION DISPOSAL WELL 34-155-21447
2016 SNYDER BROS INC Produced Fluid 120.00 Bbl REUSE OTHER THAN ROAD SPREADING

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2011874 Primary Facility 2011-10-19 Routine/Complete Inspection No Violations Noted Met onsite with operator representative Tood Kunselman. Reviewed the proposed E&S plan and found that the plan, if implemented as and maintained as outlined, should effectively minimize accelerated erosion & sedimentation and prevent any adverse impacts to the wetland located near the well development area.
2042815 Primary Facility 2012-02-15 Routine/Complete Inspection No Violations Noted Site constructed. E&S ok, minor erosion control additions necessary, i.e. stabilization of culvert inlets and outlets.
2071132 Primary Facility 2012-05-22 Routine/Complete Inspection No Violations Noted Drilling complete. Well equipped and producing gas. Lined pit ok. 2 tanks onsite. Site not yet reclaimed.
2104450 Primary Facility 2012-10-02 Site Restoration No Violations Noted At the time of inspection the well appears to be drilled and equipped for production. The well apparatus and brine tank located onsite appear to be in sound condition. The site also appears to be regraded, seeded and mulched with very good vegetative growth. At the time of inspection the site appears to meet the 70% uniform vegetative coverage criteria for restoration. The Department also note that the perimeter BMPs have been removed.
2104937 Primary Facility 2012-10-03 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2116622 Primary Facility 2012-11-19 Site Restoration No Violations Noted Well tag present and well equipped for production. Two brine tanks located on-site and both appeared to be in sound condition. Site has been permanently stabilized. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site.
2511160 Primary Facility 2016-08-04 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Brine tanks located onsite and they appeared to be in sound condition.

For data sources see[8]

References