If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Line 4: | Line 4: | ||
| style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.915197, -79.486266 | width=100% | height=100% }} | | style="width: 50%; height=100%; align=center" rowspan="14" | {{#display_map: 40.915197, -79.486266 | width=100% | height=100% }} | ||
|- | |- | ||
− | | County: [[Armstrong County, Pennsylvania|Armstrong]] | + | | County: [[wikipedia:Armstrong County, Pennsylvania|Armstrong]] |
|- | |- | ||
− | | Municipality: [[Washington Township, Armstrong County, Pennsylvania|Washington Township]] | + | | Municipality: [[wikipedia:Washington Township, Armstrong County, Pennsylvania|Washington Township]] |
|- | |- | ||
− | | Operator Name: [[SNYDER BROS INC]] | + | | Operator Name: [[wikipedia:SNYDER BROS INC|SNYDER BROS INC]] |
|- | |- | ||
| Farm/Lease Name: HEFFELFINGER-CROYLE UNIT 1M | | Farm/Lease Name: HEFFELFINGER-CROYLE UNIT 1M |
Well ID: 005-31059 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.915197,"lon":-79.486266,"icon":""}]} |
County: Armstrong | |
Municipality: Washington Township | |
Operator Name: SNYDER BROS INC | |
Farm/Lease Name: HEFFELFINGER-CROYLE UNIT 1M | |
First Permit Date: 2012-04-11 | |
Last Permit Date: 2012-04-11 | |
Spud Date: 2012-10-31 | |
Unconventional: Yes | |
Horizontal: No | |
Producing: Yes | |
Violations: None | |
Latitude: 40.915197 | |
Longitude: -79.486266 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2106470 | 2012-10-10 | No Violations Noted | Site constructed, drilling had not commenced at the time of the inspection. Access road and site E&S comtrols had been implemented as outlined in the onsite E&S plan. Drill pit constructed and properly lined. The E&S controls as implemented should effectively minimize accelerated erosion or sedimentation, provided the controls are properly maintained. | |
2111672 | 2012-10-31 | No Violations Noted | At the time of inspection the drill rig was onsite and in the process of setting up to start drilling The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. No observation of accelerated erosion and sedimentation in relation to the access road or well pad area at the time of inspection. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained. | |
2116620 | 2012-11-19 | No Violations Noted | Drilling had been completed at time of inspection, but not yet equipped for production. Drill pit located onsite and it contained both fluids and drill cuttings. Drill pit had more than the required two feet of line freeboard. E&S control BMPs properly maintained and no accelerated erosion or sedimentation issues were observed in relation to the well pad and access road. It was noted that the rock construction entrance would require restablishment. | |
2123196 | 2012-12-13 | No Violations Noted | Drilling had been completed at time of inspection, but not yet equipped for production. Drill pit located onsite and it contained both fluids and drill cuttings. Drill pit had more than the required two feet of line freeboard. E&S control BMPs properly maintained and no accelerated erosion or sedimentation issues were observed in relation to the well pad and access road. It was noted that the rock construction entrance would require restablishment prior to commencement of well stimulation activities. | |
2127654 | 2013-01-02 | No Violations Noted | Well had been drilled but not equipped for production. Site E&S controls had been implemented as outlined in the onsite E&S plan. Earth-moving equipment was active on site during the inspection, probably preparing the site for arrival of stimulation equipment. A rock pile was noted at the top of the access road apparently to be used to re-establish the rock-lined entryway as recommended in the previous inspection. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | DRILLING FLUID WASTE | 350.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW006 | CAES WATER TRMT & RECYCLING FAC | CLARION | PA |
2012-2 | DRILL CUTTINGS | 116.0 | Tons | ENCAPSULATION | ON SITE DISPOSAL PURSUANT TO 25 PA CODE 78.62 |