X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-31059"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-31059
 
| Well ID: 37-005-31059
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.915197, -79.486266 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.915197, -79.486266 | width=100% | height=100% }}  
 
|-
 
|-
 
| County: [[Armstrong County, Pennsylvania|Armstrong]]
 
| County: [[Armstrong County, Pennsylvania|Armstrong]]
Line 9: Line 9:
 
| Municipality: [[Washington Township, Armstrong County, Pennsylvania|Washington Township]]
 
| Municipality: [[Washington Township, Armstrong County, Pennsylvania|Washington Township]]
 
|-
 
|-
| Operator Name: [[SNYDER BROS INC|SNYDER BROS INC]]
+
| Operator Name: [[SNYDER BROS INC]]
 
|-
 
|-
| Well Pad ID: [[146254]]
+
| Well Pad ID: [[146254|146254]]
 
|-
 
|-
 
| Farm/Lease Name: HEFFELFINGER-CROYLE UNIT 1M
 
| Farm/Lease Name: HEFFELFINGER-CROYLE UNIT 1M
Line 25: Line 25:
 
| Horizontal: No
 
| Horizontal: No
 
|-
 
|-
| Producing: Yes
+
| Well Status: ACTIVE
 
|-
 
|-
| Violations: None
+
| Violations: 0
 
|-
 
|-
 
| Latitude: 40.915197
 
| Latitude: 40.915197
Line 34: Line 34:
 
|-
 
|-
 
|}
 
|}
== Inspection Data ==
+
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | PERIOD
!scope="col" | DATE
+
!scope="col" | GAS QUANTITY
!scope="col" | DESCRIPTION
+
!scope="col" | GAS PRODUCTION DAYS
!scope="col" | COMMENT
+
!scope="col" | CONDENSATE QUANTITY
!scope="col" | VIOLATION ID
+
!scope="col" | CONDENSATE PRODUCTION DAYS
 +
!scope="col" | OIL QUANTITY
 +
!scope="col" | OIL PRODUCTION DAYS
 
|-
 
|-
| 2106470
+
| 2012-1
| 2012-10-10
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| Site constructed, drilling had not commenced at the time of the inspection. Access road and site E&S comtrols had been implemented as outlined in the onsite E&S plan.  Drill pit constructed and properly lined.  The E&S controls as implemented should effectively minimize accelerated erosion or sedimentation, provided the controls are properly maintained.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2111672
+
| 2012-2
| 2012-10-31
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| At the time of inspection the drill rig was onsite and in the process of setting up to start drilling  The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. No observation of accelerated erosion and sedimentation in relation to the access road or well pad area at the time of inspection. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2116620
+
| 2013-1
| 2012-11-19
+
| style="text-align:right;" | 0.0
| No Violations Noted
+
| style="text-align:right;" | 0.0
| Drilling had been completed at time of inspection, but not yet equipped for production. Drill pit located onsite and it contained both fluids and drill cuttings.  Drill pit had more than the required two feet of line freeboard.  E&S control BMPs properly maintained and no accelerated erosion or sedimentation issues were observed in relation to the well pad and access road.  It was noted that the rock construction entrance would require restablishment.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2123196
+
| 2013-2
| 2012-12-13
+
| style="text-align:right;" | 12908.0
| No Violations Noted
+
| style="text-align:right;" | 117.0
| Drilling had been completed at time of inspection, but not yet equipped for production. Drill pit located onsite and it contained both fluids and drill cuttings.  Drill pit had more than the required two feet of line freeboard.  E&S control BMPs properly maintained and no accelerated erosion or sedimentation issues were observed in relation to the well pad and access road.  It was noted that the rock construction entrance would require restablishment prior to commencement of well stimulation activities.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
 
|-
 
|-
| 2127654
+
| 2014-1
| 2013-01-02
+
| style="text-align:right;" | 9510.0
| No Violations Noted
+
| style="text-align:right;" | 178.0
| Well had been drilled but not equipped for production. Site E&S controls had been implemented as outlined in the onsite E&S plan. Earth-moving equipment was active on site during the inspection, probably preparing the site for arrival of stimulation equipment. A rock pile was noted at the top of the access road apparently to be used to re-establish the rock-lined entryway as recommended in the previous inspection.
+
| style="text-align:right;" | 0.0
|  
+
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
|-
 
|-
|}
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | PERIOD
 
!scope="col" | GAS QUANTITY
 
!scope="col" | GAS PRODUCTION DAYS
 
!scope="col" | CONDENSATE QUANTITY
 
!scope="col" | CONDENSATE PRODUCTION DAYS
 
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2012-2
+
| 2014-2
 +
| style="text-align:right;" | 7227.0
 +
| style="text-align:right;" | 184.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-02
 +
| style="text-align:right;" | 1068.0
 +
| style="text-align:right;" | 28.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 96: Line 107:
 
|-
 
|-
 
|-
 
|-
| 2012-1
+
| 2015-01
 +
| style="text-align:right;" | 825.0
 +
| style="text-align:right;" | 25.0
 +
| style="text-align:right;" | 0.0
 +
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 +
|-
 +
|-
 +
| 2015-03
 +
| style="text-align:right;" | 986.0
 +
| style="text-align:right;" | 31.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
Line 105: Line 125:
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Production Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
 +
| accessdate = 2015-05-27 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 116: Line 142:
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
!scope="col" | FACILITY STATE
 +
|-
 +
| 2012-2
 +
| DRILL CUTTINGS
 +
| style="text-align:right;" | 116.0
 +
| Tons
 +
| ON SITE ENCAPSULATION
 +
|
 +
| ON SITE DISPOSAL PURSUANT TO 25 PA CODE 78.62
 +
|
 +
| PA
 +
|-
 
|-
 
|-
 
| 2012-2
 
| 2012-2
Line 128: Line 165:
 
|-
 
|-
 
|-
 
|-
| 2012-2
+
| 2013-2
| DRILL CUTTINGS
+
| FRACING FLUID WASTE
| style="text-align:right;" | 116.0
+
| style="text-align:right;" | 910.0
| Tons
+
| Bbl
| ENCAPSULATION
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW006
 +
| CAES WATER TRMT & RECYCLING FAC
 +
| CLARION
 +
| PA
 +
|-
 +
|-
 +
| 2013-2
 +
| FRACING FLUID WASTE
 +
| style="text-align:right;" | 490.0
 +
| Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 +
|
 +
|
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 673.0
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21438
 +
| KLEESE #1 (SWIW #18)
 +
| VIENNA
 +
| OH
 +
|-
 +
|-
 +
| 2013-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 266.0
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 155-23223
 +
| NATALE #2 (SWIW #29)
 +
| VIENNA
 +
| OH
 +
|-
 +
|-
 +
| 2014-1
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 100.0
 +
| Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW009
 +
| RES WATER BUTLER
 +
|
 +
| PA
 +
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 93.0
 +
| Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-21447
 +
| KLEESE #2 (SWIW #19)
 +
| VIENNA
 +
| OH
 +
|-
 +
|-
 +
| 2014-2
 +
| PRODUCED FLUID
 +
| style="text-align:right;" | 110.0
 +
| Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW005
 +
| RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER
 +
|
 +
| PA
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Oil and Gas Historical Waste Report
 +
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
 +
| accessdate = 2015-05-26 }}</ref>
 +
== Inspection Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | INSPECTION ID
 +
!scope="col" | DATE
 +
!scope="col" | DESCRIPTION
 +
!scope="col" | COMMENT
 +
!scope="col" | VIOLATION ID
 +
!scope="col" | VIOLATION CODE
 +
!scope="col" | VIOLATION_COMMENT
 +
|-
 +
| 2106470
 +
| 2012-10-10
 +
| No Violations Noted
 +
| Site constructed, drilling had not commenced at the time of the inspection.  Access road and site E&S comtrols had been implemented as outlined in the onsite E&S plan.  Drill pit constructed and properly lined.  The E&S controls as implemented should effectively minimize accelerated erosion or sedimentation, provided the controls are properly maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2111672
 +
| 2012-10-31
 +
| No Violations Noted
 +
| At the time of inspection the drill rig was onsite and in the process of setting up to start drilling  The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan.  No observation of accelerated erosion and sedimentation in relation to the access road or well pad area at the time of inspection. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2116620
 +
| 2012-11-19
 +
| No Violations Noted
 +
| Drilling had been completed at time of inspection, but not yet equipped for production.  Drill pit located onsite and it contained both fluids and drill cuttings.  Drill pit had more than the required two feet of line freeboard.  E&S control BMPs properly maintained and no accelerated erosion or sedimentation issues were observed in relation to the well pad and access road.  It was noted that the rock construction entrance would require restablishment.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2123196
 +
| 2012-12-13
 +
| No Violations Noted
 +
| Drilling had been completed at time of inspection, but not yet equipped for production.  Drill pit located onsite and it contained both fluids and drill cuttings.  Drill pit had more than the required two feet of line freeboard.  E&S control BMPs properly maintained and no accelerated erosion or sedimentation issues were observed in relation to the well pad and access road.  It was noted that the rock construction entrance would require restablishment prior to commencement of well stimulation activities.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2127654
 +
| 2013-01-02
 +
| No Violations Noted
 +
| Well had been drilled but not equipped for production. Site E&S controls had been implemented as outlined in the onsite E&S plan. Earth-moving equipment was active on site during the inspection, probably preparing the site for arrival of stimulation equipment. A rock pile was noted at the top of the access road apparently to be used to re-establish the rock-lined entryway as recommended in the previous inspection.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2142582
 +
| 2013-02-20
 +
| No Violations Noted
 +
| Well shut in on 4 1/2ï¾” x 2 swage.  Waiting on frac.  Pit lined and freeboard maintained.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2173590
 +
| 2013-06-07
 +
| No Violations Noted
 +
| Drilling appeared to have been completed.  Site and access road erosion controls appeared to be functioning properly and there was no eviedence of accelerated erosion or sedimentation.  Drill pit located onsite and it contained fluids, drill cuttings and it had more than the required two feet of lined freeboard.
 +
|
 +
|
 +
|
 +
|-
 +
|-
 +
| 2340601
 +
| 2015-02-03
 +
| No Violations Noted
 +
| Well appeared to be equipped for production. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Brine tanks located onsite and they appeared to be in sound condition.
 
|  
 
|  
| ON SITE DISPOSAL PURSUANT TO 25 PA CODE 78.62
 
 
|  
 
|  
 
|  
 
|  
 
|-
 
|-
 
|}
 
|}
==References==
+
For data sources see<ref>{{cite web
{{Reflist}}
+
| title = Oil and Gas Historical Inspection Report
 
+
| publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2015-05-26
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
 +
| accessdate = 2015-05-27 }}</ref>
 +
== References ==
 +
{{reflist}}
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Wells]]
 
[[Category:Wells]]

Revision as of 21:38, 25 June 2015

Well Details

Well ID: 37-005-31059
Loading map...
County: Armstrong
Municipality: Washington Township
Operator Name: SNYDER BROS INC
Well Pad ID: 146254
Farm/Lease Name: HEFFELFINGER-CROYLE UNIT 1M
First Permit Date: 2012-04-11
Last Permit Date: 2012-04-11
Spud Date: 2012-10-31
Unconventional: Yes
Horizontal: No
Well Status: ACTIVE
Violations: 0
Latitude: 40.915197
Longitude: -79.486266

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2012-1 0.0 0.0 0.0 0.0 0.0 0.0
2012-2 0.0 0.0 0.0 0.0 0.0 0.0
2013-1 0.0 0.0 0.0 0.0 0.0 0.0
2013-2 12908.0 117.0 0.0 0.0 0.0 0.0
2014-1 9510.0 178.0 0.0 0.0 0.0 0.0
2014-2 7227.0 184.0 0.0 0.0 0.0 0.0
2015-02 1068.0 28.0 0.0 0.0 0.0 0.0
2015-01 825.0 25.0 0.0 0.0 0.0 0.0
2015-03 986.0 31.0 0.0 0.0 0.0 0.0

For data sources see[1]

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2012-2 DRILL CUTTINGS 116.0 Tons ON SITE ENCAPSULATION ON SITE DISPOSAL PURSUANT TO 25 PA CODE 78.62 PA
2012-2 DRILLING FLUID WASTE 350.0 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW006 CAES WATER TRMT & RECYCLING FAC CLARION PA
2013-2 FRACING FLUID WASTE 910.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW006 CAES WATER TRMT & RECYCLING FAC CLARION PA
2013-2 FRACING FLUID WASTE 490.0 Bbl REUSE OTHER THAN ROAD SPREADING REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
2013-2 PRODUCED FLUID 673.0 Bbl INJECTION DISPOSAL WELL 34-155-21438 KLEESE #1 (SWIW #18) VIENNA OH
2013-2 PRODUCED FLUID 266.0 Bbl INJECTION DISPOSAL WELL 155-23223 NATALE #2 (SWIW #29) VIENNA OH
2014-1 PRODUCED FLUID 100.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009 RES WATER BUTLER PA
2014-2 PRODUCED FLUID 93.0 Bbl INJECTION DISPOSAL WELL 34-155-21447 KLEESE #2 (SWIW #19) VIENNA OH
2014-2 PRODUCED FLUID 110.0 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005 RESERVED ENV SVC HEMPFIELD TWP RESIDUAL WASTE OPER PA

For data sources see[2]

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
2106470 2012-10-10 No Violations Noted Site constructed, drilling had not commenced at the time of the inspection. Access road and site E&S comtrols had been implemented as outlined in the onsite E&S plan. Drill pit constructed and properly lined. The E&S controls as implemented should effectively minimize accelerated erosion or sedimentation, provided the controls are properly maintained.
2111672 2012-10-31 No Violations Noted At the time of inspection the drill rig was onsite and in the process of setting up to start drilling The Erosion and Sedimentation plan was onsite and all BMPs appear to implemented and maintained as outline in the E&S plan. No observation of accelerated erosion and sedimentation in relation to the access road or well pad area at the time of inspection. The drill pit located onsite appears to be in sound condition with the required 2 feet of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure site stability and BMPs are maintained.
2116620 2012-11-19 No Violations Noted Drilling had been completed at time of inspection, but not yet equipped for production. Drill pit located onsite and it contained both fluids and drill cuttings. Drill pit had more than the required two feet of line freeboard. E&S control BMPs properly maintained and no accelerated erosion or sedimentation issues were observed in relation to the well pad and access road. It was noted that the rock construction entrance would require restablishment.
2123196 2012-12-13 No Violations Noted Drilling had been completed at time of inspection, but not yet equipped for production. Drill pit located onsite and it contained both fluids and drill cuttings. Drill pit had more than the required two feet of line freeboard. E&S control BMPs properly maintained and no accelerated erosion or sedimentation issues were observed in relation to the well pad and access road. It was noted that the rock construction entrance would require restablishment prior to commencement of well stimulation activities.
2127654 2013-01-02 No Violations Noted Well had been drilled but not equipped for production. Site E&S controls had been implemented as outlined in the onsite E&S plan. Earth-moving equipment was active on site during the inspection, probably preparing the site for arrival of stimulation equipment. A rock pile was noted at the top of the access road apparently to be used to re-establish the rock-lined entryway as recommended in the previous inspection.
2142582 2013-02-20 No Violations Noted Well shut in on 4 1/2ï¾” x 2 swage. Waiting on frac. Pit lined and freeboard maintained.
2173590 2013-06-07 No Violations Noted Drilling appeared to have been completed. Site and access road erosion controls appeared to be functioning properly and there was no eviedence of accelerated erosion or sedimentation. Drill pit located onsite and it contained fluids, drill cuttings and it had more than the required two feet of lined freeboard.
2340601 2015-02-03 No Violations Noted Well appeared to be equipped for production. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Brine tanks located onsite and they appeared to be in sound condition.

For data sources see[3]

References