X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-31281"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-31281
 
| Well ID: 37-005-31281
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.869167, -79.566011 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.869167, -79.566011 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 02/13/2017
+
| Spud Date: 2017-02-13
 
|-
 
|-
| Permit Date: 1/31/2017
+
| Permit Date: 2017-01-31
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 45: Line 45:
 
  | accessdate = 2019-05-16 }}</ref><ref>{{cite web
 
  | accessdate = 2019-05-16 }}</ref><ref>{{cite web
 
  | title = Oil and Gas Well Pad Report
 
  | title = Oil and Gas Well Pad Report
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-05-20
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Operator Name
 
!scope="col" | Gas Quantity (mcf)
 
!scope="col" | Gas Production Days
 
!scope="col" | Oil Quantity (bbl)
 
!scope="col" | Oil Production Days
 
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Production Days
 
|-
 
| 2017
 
| [[SNYDER BROS INC]]
 
| style="text-align: right;" | 112,425.00
 
| style="text-align: right;" | 10
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2018
 
| [[SNYDER BROS INC]]
 
| style="text-align: right;" | 1,512,171.00
 
| style="text-align: right;" | 231
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2019
 
| [[SNYDER BROS INC]]
 
| style="text-align: right;" | 434,756.00
 
| style="text-align: right;" | 90
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Production Reports
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-03-31
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Disposal Method
 
!scope="col" | Waste Facility ID
 
|-
 
| 2017-04
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 321.22 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2017-04
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 2,120.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2017-06
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 117.99 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2017-07
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 775.19 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2017-08
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 37.50 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2017-09
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 72.53 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2017-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,002.86 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2017-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 90.03 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 65.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2017-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 525.20 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-11
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 2.48 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2017-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 8,246.90 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2017-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 313.90 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23196
 
|-
 
| 2017-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,685.20 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2017-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 647.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-12
 
| Produced Fluid (in Tons) RWC 802
 
| style="text-align: right;" | 46.32 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2018-01
 
| Filter Socks (in Tons) RWC 812
 
| style="text-align: right;" | 1.37 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2018-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 8,329.50 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 63.80 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23196
 
|-
 
| 2018-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 93.80 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23223
 
|-
 
| 2018-01
 
| Produced Fluid (in Tons) RWC 802
 
| style="text-align: right;" | 8.86 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2018-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 4,500.30 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 3,496.20 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-03
 
| Produced Fluid (in Tons) RWC 802
 
| style="text-align: right;" | 2.44 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2018-03
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 3.95 Tons
 
| LANDFILL
 
| 100585
 
|-
 
| 2018-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,182.80 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 37.50 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2018-05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,268.30 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,494.30 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 130.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 468.20 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 787.80 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,105.40 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,196.70 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 262.60 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,310.50 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 102.50 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2018-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,422.10 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2018-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 150.10 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-24079
 
|-
 
| 2018-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,068.20 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2019-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,685.60 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,205.40 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-099-23158
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 18.80 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-155-23223
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Waste Reports
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-03-31
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Inspection Category
 
!scope="col" | Inspection Date
 
!scope="col" | Inspection Type
 
!scope="col" | Inspection Result
 
!scope="col" | Inspection Comments
 
|-
 
| 2562482
 
| Primary Facility
 
| 2017-02-16
 
| Drilling/Alteration
 
| No Violations Noted
 
| Drilling permit on site-log book up to date-6'x6' cellar in place-Rocky Mt. conductor Rig drilled-ran 84' of new 24" pipe. Hit H2O @ 58'. Site looked ok.
 
|-
 
| 2563719
 
| Primary Facility
 
| 2017-02-21
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| Site had been constructed in accordance with the E&S plan contained within the ESCGP.  All E&S controls appeared to be functioning properly.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.  Drilling had commenced but was not ongoing at the time of the inspection.
 
|-
 
| 2582529
 
| Primary Facility
 
| 2017-04-13
 
| Drilling/Alteration
 
| No Violations Noted
 
| Rig resumed drilling 4/10/2017. Ran 866' of 13 3/8" casing-cemented with 704 sks cement-got 25 bbl return. Drilling @ 886' at time of inspection. Drilling log information up to date-all equipment on site looked ok.
 
|-
 
| 2604743
 
| Primary Facility
 
| 2017-06-16
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| Drilling for the Dynamite 2H is anticipated to begin on or about 06/19/17.  Drilling was ongoing on the well pad for the Dynamite 3H.  Secondary containment onsite and it appeared to be in sound condition.  Drill cutting waste containers were onsite on the secondary containment. Drill cuttings are being hauled off-site for disposal.  All E&S controls had been properly implemented and maintained.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
 
|-
 
| 2612504
 
| Primary Facility
 
| 2017-07-06
 
| Drilling/Alteration
 
| No Violations Noted
 
| The Rig was tripping pipe out of the hole getting ready to run and cement 5' production casing at the time of this inspection. Daily drilling info and all equipment on site looked ok.
 
|-
 
| 2619505
 
| Primary Facility
 
| 2017-07-27
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| Drilling had been completed, work was ongoing to prep the site for well stimulation activities.  Well pad secondary containment had been inspected and patched as necessary after removal of the drilling equipment.  All site and access road erosion controls appeared to be functioning properly and there was no observed accelerated erosion or sedimentation in relation to the site or access road.
 
|-
 
| 2626440
 
| Primary Facility
 
| 2017-08-14
 
| Drilling/Alteration
 
| No Violations Noted
 
| Upper manual valve not operating properly. All existing valves will remain on well until HCR can be opened. An extra manual MV will be installed on top to provide an extra barrier.
 
|-
 
| 2626480
 
| Primary Facility
 
| 2017-08-15
 
| Drilling/Alteration
 
| No Violations Noted
 
| Operator waiting on CUD to arrive from Oklahoma to drill out stuck Canary valve. All existing valves will remain on well until HCR can be opened. An extra manual MV will be installed on top to provide an extra barrier.
 
|-
 
| 2628204
 
| Primary Facility
 
| 2017-08-21
 
| Drilling/Alteration
 
| No Violations Noted
 
| This well still has the Canary frac stack well head on it. CUD drilled out top stuck valve but something is plugging well bore at 9' below surface. Well frac is on hold for the time being and is shut in with 3 levels of valve protection.
 
|-
 
| 2630654
 
| Primary Facility
 
| 2017-08-28
 
| Drilling/Alteration
 
| No Violations Noted
 
| The frac crew was waiting on the snubbing unit to remove an unknown object 9' below the surface inside this well bore at the time of this inspection.
 
|-
 
| 2641947
 
| Primary Facility
 
| 2017-09-29
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| Well stimulation equipment is slated to be brought onsite and well stimulation activities resume for the Dynamite 1H beginning Monday October 2, 2017.  All site and access erosion controls had been implemented and maintained as outlined in the E&S Plan contained within the ESCGP.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
 
|-
 
| 2645785
 
| Primary Facility
 
| 2017-10-11
 
| Drilling/Alteration
 
| No Violations Noted
 
| At the time of this inspection Keane is set up and just finished fracking stage 42 of the planned 55 stages to be fracked on this well. All site information and all equipment on site looked ok.
 
|-
 
| 2648464
 
| Primary Facility
 
| 2017-10-17
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| All erosion controls for the site and access road had been implemented and maintained as outlined in the E&S plan.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.  Secondary containment was located onsite, set in place and maintained as outlined in the Containment plan.  Well stimulation activities had been completed.  Work was underway to prepare the site and set-up the equipment necessary for drilling out the frac plugs.
 
|-
 
| 2665260
 
| Primary Facility
 
| 2017-11-29
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| At time of inspection, well is drilled and has been stimulated. The remaining three wells on the pad are also drilled and have been stimulated. On-site contractors appear to be preparing and maintaining equipment for the production of the wells.
 
|-
 
| 2680912
 
| Primary Facility
 
| 2018-01-10
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| At time of inspection, well 1H is drilled and appears equipped for production. Wells 2H, 3H, and 4H are also drilled and appear equipped for production.
 
|-
 
| 2709844
 
| Primary Facility
 
| 2018-03-26
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
 
|-
 
| 2724365
 
| Primary Facility
 
| 2018-04-18
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| At time of inspection, well 1H is drilled and appears equipped for production. Wells 2H, 3H, and 4H are also drilled and appear equipped for production.
 
|-
 
| 2743236
 
| Primary Facility
 
| 2018-06-13
 
| Routine/Partial Inspection
 
| No Violations Noted
 
| At time of inspection, well 1H is drilled and appears equipped for production. Wells 2H, 3H, and 4H are also drilled and appear equipped for production.
 
|-
 
| 2766733
 
| Primary Facility
 
| 2018-08-23
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
 
|-
 
| 2818432
 
| Primary Facility
 
| 2018-12-17
 
| Site Restoration
 
| No Violations Noted
 
| Inspection conducted in response to Post Drilling Restoration Report received by Department.
 
Well appears to be in production. Well head surrounded by cement barriers. Three brine tanks located on site.
 
This restoration report has been reviewed and is approved.
 
|-
 
| 2821022
 
| Primary Facility
 
| 2019-01-02
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.
 
|-
 
|}
 
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Violation ID
 
!scope="col" | Violation Date
 
!scope="col" | Date Resolved
 
!scope="col" | Violation Code
 
!scope="col" | Violation Type
 
!scope="col" | Violation Comments
 
|-
 
|}-->
 
<!--==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Violation ID
 
!scope="col" | Penalty ID
 
!scope="col" | Penalty Code
 
!scope="col" | Penalty Status
 
!scope="col" | Penalty Date
 
!scope="col" | Enforcement Date
 
!scope="col" | Penalty Amount
 
!scope="col" | Amount Collected
 
|-
 
|}-->
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Compliance Report
 
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-05-20
 
| date = 2019-05-20
Line 567: Line 60:
 
|-
 
|-
 
| 1
 
| 1
| 08/07/2017
+
| 2017-08-07
| 10/13/2017
+
| 2017-10-13
 
| style="text-align: right;" | 6430
 
| style="text-align: right;" | 6430
 
| style="text-align: right;" | 17,938,700.0
 
| style="text-align: right;" | 17,938,700.0
Line 897: Line 390:
 
| style="text-align: right;" | 93.093
 
| style="text-align: right;" | 93.093
 
|-
 
|-
| quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides
+
| quaternary ammonium compounds,<br/> benzyl-C12-16-alkyldimethyl, chlorides
 
| 68424-85-1
 
| 68424-85-1
 
| style="text-align: right;" | 5.3
 
| style="text-align: right;" | 5.3
Line 995: Line 488:
 
| style="text-align: right;" | 1009.12
 
| style="text-align: right;" | 1009.12
 
|-
 
|-
| quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides
+
| quaternary ammonium compounds,<br/> benzyl-C12-16-alkyldimethyl, chlorides
 
| 68424-85-1
 
| 68424-85-1
 
| style="text-align: right;" | 5.3
 
| style="text-align: right;" | 5.3
Line 1,041: Line 534:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 112,425.00
 +
| style="text-align: right;" | 10
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 1,512,171.00
 +
| style="text-align: right;" | 231
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[SNYDER BROS INC]]
 +
| style="text-align: right;" | 434,756.00
 +
| style="text-align: right;" | 90
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 1,262.23 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 2.48 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Tons) RWC 802
 +
| style="text-align: right;" | 46.32 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Drilling Fluid Waste (in Barrels) RWC 803
 +
| style="text-align: right;" | 2,230.03 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24079
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 8,246.90 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Drill Cuttings (in Tons) RWC 810
 +
| style="text-align: right;" | 1,214.40 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 3,753.06 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24079
 +
|-
 +
| 2017
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 313.90 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23196
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 63.80 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23196
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 1,180.40 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Tons) RWC 802
 +
| style="text-align: right;" | 11.30 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 93.80 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23223
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 30,842.50 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Filter Socks (in Tons) RWC 812
 +
| style="text-align: right;" | 1.37 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 3.95 Tons
 +
| LANDFILL
 +
| 100585
 +
|-
 +
| 2018
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 290.10 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-24079
 +
|-
 +
| 2019
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 2,891.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-099-23158
 +
|-
 +
| 2019
 +
| [[SNYDER BROS INC]]
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 18.80 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-155-23223
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2562482
 +
| Primary Facility
 +
| 2017-02-16
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Drilling permit on site-log book up to date-6'x6' cellar in place-Rocky Mt. conductor Rig drilled-ran 84' of new 24" pipe. Hit H2O @ 58'. Site looked ok.
 +
|-
 +
| 2563719
 +
| Primary Facility
 +
| 2017-02-21
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Site had been constructed in accordance with the E&S plan contained within the ESCGP.  All E&S controls appeared to be functioning properly.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.  Drilling had commenced but was not ongoing at the time of the inspection.
 +
|-
 +
| 2582529
 +
| Primary Facility
 +
| 2017-04-13
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Rig resumed drilling 4/10/2017. Ran 866' of 13 3/8" casing-cemented with 704 sks cement-got 25 bbl return. Drilling @ 886' at time of inspection. Drilling log information up to date-all equipment on site looked ok.
 +
|-
 +
| 2604743
 +
| Primary Facility
 +
| 2017-06-16
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Drilling for the Dynamite 2H is anticipated to begin on or about 06/19/17.  Drilling was ongoing on the well pad for the Dynamite 3H.  Secondary containment onsite and it appeared to be in sound condition.  Drill cutting waste containers were onsite on the secondary containment. Drill cuttings are being hauled off-site for disposal.  All E&S controls had been properly implemented and maintained.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
 +
|-
 +
| 2612504
 +
| Primary Facility
 +
| 2017-07-06
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| The Rig was tripping pipe out of the hole getting ready to run and cement 5' production casing at the time of this inspection. Daily drilling info and all equipment on site looked ok.
 +
|-
 +
| 2619505
 +
| Primary Facility
 +
| 2017-07-27
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Drilling had been completed, work was ongoing to prep the site for well stimulation activities.  Well pad secondary containment had been inspected and patched as necessary after removal of the drilling equipment.  All site and access road erosion controls appeared to be functioning properly and there was no observed accelerated erosion or sedimentation in relation to the site or access road.
 +
|-
 +
| 2626440
 +
| Primary Facility
 +
| 2017-08-14
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Upper manual valve not operating properly. All existing valves will remain on well until HCR can be opened. An extra manual MV will be installed on top to provide an extra barrier.
 +
|-
 +
| 2626480
 +
| Primary Facility
 +
| 2017-08-15
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Operator waiting on CUD to arrive from Oklahoma to drill out stuck Canary valve. All existing valves will remain on well until HCR can be opened. An extra manual MV will be installed on top to provide an extra barrier.
 +
|-
 +
| 2628204
 +
| Primary Facility
 +
| 2017-08-21
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| This well still has the Canary frac stack well head on it. CUD drilled out top stuck valve but something is plugging well bore at 9' below surface. Well frac is on hold for the time being and is shut in with 3 levels of valve protection.
 +
|-
 +
| 2630654
 +
| Primary Facility
 +
| 2017-08-28
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| The frac crew was waiting on the snubbing unit to remove an unknown object 9' below the surface inside this well bore at the time of this inspection.
 +
|-
 +
| 2641947
 +
| Primary Facility
 +
| 2017-09-29
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| Well stimulation equipment is slated to be brought onsite and well stimulation activities resume for the Dynamite 1H beginning Monday October 2, 2017.  All site and access erosion controls had been implemented and maintained as outlined in the E&S Plan contained within the ESCGP.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.
 +
|-
 +
| 2645785
 +
| Primary Facility
 +
| 2017-10-11
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| At the time of this inspection Keane is set up and just finished fracking stage 42 of the planned 55 stages to be fracked on this well. All site information and all equipment on site looked ok.
 +
|-
 +
| 2648464
 +
| Primary Facility
 +
| 2017-10-17
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| All erosion controls for the site and access road had been implemented and maintained as outlined in the E&S plan.  There was no observed accelerated erosion or sedimentation in relation to the site or access road.  Secondary containment was located onsite, set in place and maintained as outlined in the Containment plan.  Well stimulation activities had been completed.  Work was underway to prepare the site and set-up the equipment necessary for drilling out the frac plugs.
 +
|-
 +
| 2665260
 +
| Primary Facility
 +
| 2017-11-29
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At time of inspection, well is drilled and has been stimulated. The remaining three wells on the pad are also drilled and have been stimulated. On-site contractors appear to be preparing and maintaining equipment for the production of the wells.
 +
|-
 +
| 2680912
 +
| Primary Facility
 +
| 2018-01-10
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At time of inspection, well 1H is drilled and appears equipped for production. Wells 2H, 3H, and 4H are also drilled and appear equipped for production.
 +
|-
 +
| 2709844
 +
| Primary Facility
 +
| 2018-03-26
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
 +
|-
 +
| 2724365
 +
| Primary Facility
 +
| 2018-04-18
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At time of inspection, well 1H is drilled and appears equipped for production. Wells 2H, 3H, and 4H are also drilled and appear equipped for production.
 +
|-
 +
| 2743236
 +
| Primary Facility
 +
| 2018-06-13
 +
| Routine/Partial Inspection
 +
| No Violations Noted
 +
| At time of inspection, well 1H is drilled and appears equipped for production. Wells 2H, 3H, and 4H are also drilled and appear equipped for production.
 +
|-
 +
| 2766733
 +
| Primary Facility
 +
| 2018-08-23
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
 +
|-
 +
| 2818432
 +
| Primary Facility
 +
| 2018-12-17
 +
| Site Restoration
 +
| No Violations Noted
 +
| Inspection conducted in response to Post Drilling Restoration Report received by Department.
 +
Well appears to be in production. Well head surrounded by cement barriers. Three brine tanks located on site.
 +
This restoration report has been reviewed and is approved.
 +
|-
 +
| 2821022
 +
| Primary Facility
 +
| 2019-01-02
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.
 +
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>

Revision as of 06:40, 20 August 2019

Well Details

Well ID: 37-005-31281
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: East Franklin Township
Operator Name: SNYDER BROS INC
Well Pad ID: 153958
Farm/Lease Name: DYNAMITE 1H
License Status: Active
Spud Date: 2017-02-13
Permit Date: 2017-01-31
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.869167
Longitude: -79.566011

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-08-07 2017-10-13 6430 17,938,700.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Producers Service Corp / Keane Proppant Silica Substrate 14808-60-7 100 9.30403 15,510,500.0
SI-1171 Producers Service Corp Scale Inhibitor Copolymer of Maleic and Acrylic Acid 52255-49-9 10 0.000145608 242.739
DETA phosphonate 15827-60-8 3 0.00004368 72.822
Phosphino Carboxylic Acid Polymer 71050-62-9 3 0.00004368 72.822
Hexamethylene Triamine Penta 34690-00-1 3 0.00004368 72.822
7.5% HCL Keane Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0315153 52538.2
Water 7732-18-5 92.5 0.388689 647971
Water Snyder Brothers Carrier/Base Fluid Water 7732-18-5 100 89.7974 149,698,000.0
KSI-19NW Keane Scale Inhibitor Methanol 67-56-1 30 0.00447503 7460.18
15% HCL Producers Service Corp / Keane Acidizing Hydrochloric Acid 7647-01-0 15 0.055782 92992.5
KAI-12 Keane Acid Inhibitor isoproyl alcohol 67-63-0 5 0.00005584 93.093
ethylbenzene 100-41-4 1 0.00001117 18.619
Fatty imidazoline 61790-69-0 5 0.00005584 93.093
xylene 1330-20-7 5 0.00005584 93.093
Methanol 67-56-1 90 0.00100516 1675.67
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00005584 93.093
prop-2-yn-1-ol 107-19-7 5 0.00005584 93.093
BIO CLEAR 1430 Producers Service Corp Biocide Dimethylamine 68439-70-3 0.5 0.00000740 12.334
Glutaraldehyde 111-30-8 20 0.000295953 493.373
Alkyl dimethyl benzyl ammonium chloride 68424-85-1 5 0.00007399 123.343
NEFE-180 Producers Service Corp Corrosion Inhibitor/Iron Control Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00000793 13.218
Fatty Acids, tall oil 61790-12-3 5 0.00000793 13.218
2-Ethylhexanol 104-76-7 10 0.00001586 26.437
2-Propyn-1-ol 107-19-7 5 0.00000793 13.218
Methanol 67-56-1 35 0.00005550 92.529
Acetic Acid 64-19-7 65 0.000103079 171.84
Coconut oil acid diethanolamine 68603-42-9 5 0.00000793 13.218
Other Chemical(s) Listed Above See Trade Name(s) List Dimethylamine 68439-70-3 0.5 0.00000740 12.334
ammonium chloride 12125-02-9 1.5 0.00100035 1667.65
oleic acid diethanolamide 93-83-4 1.5 0.00100035 1667.65
2-Ethylhexanol 104-76-7 10 0.00001586 26.437
alcohols, C12-16, ethoxylated 68551-12-2 1 0.0006669 1111.77
Water 7732-18-5 92.5 0.388689 647971
Phosphino Carboxylic Acid Polymer 71050-62-9 3 0.00004368 72.822
Alkyl dimethyl benzyl ammonium chloride 68424-85-1 5 0.00007399 123.343
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.013338 22235.4
ethylbenzene 100-41-4 1 0.00001117 18.619
Fatty Acids, tall oil 61790-12-3 5 0.00000793 13.218
isoproyl alcohol 67-63-0 5 0.00005584 93.093
Alcohols, ethoxylated 68439-50-9 3.1 0.000403839 673.227
Methanol 67-56-1 35 0.00005550 92.529
DETA phosphonate 15827-60-8 3 0.00004368 72.822
Alcohols, ethoxylated 68002-97-1 3.1 0.000403839 673.227
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00000793 13.218
prop-2-yn-1-ol 107-19-7 5 0.00005584 93.093
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000403297 672.323
Fatty imidazoline 61790-69-0 5 0.00005584 93.093
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00005584 93.093
xylene 1330-20-7 5 0.00005584 93.093
Coconut oil acid diethanolamine 68603-42-9 5 0.00000793 13.218
Hexamethylene Triamine Penta 34690-00-1 3 0.00004368 72.822
didecyldimethylammonium chloride 7173-51-5 8 0.000605325 1009.12
Alcohols, ethoxylated 68551-12-2 3.1 0.000403839 673.227
2-Propyn-1-ol 107-19-7 5 0.00000793 13.218
KFR-16FW Keane Friction Reducer ammonium chloride 12125-02-9 1.5 0.00100035 1667.65
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.013338 22235.4
Water 7732-18-5 60 0.040014 66706.1
alcohols, C12-16, ethoxylated 68551-12-2 1 0.0006669 1111.77
oleic acid diethanolamide 93-83-4 1.5 0.00100035 1667.65
MBC-516 Keane Biocide didecyldimethylammonium chloride 7173-51-5 8 0.000605325 1009.12
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000403297 672.323
glutaral 111-30-8 26.7 0.00202788 3380.61
STIMLUBE F Producers Service Corp Friction Reducer Petroleum Distallates 64742-47-8 30 0.00390812 6515.1
Alcohols, ethoxylated 68439-50-9 3.1 0.000403839 673.227
Alcohols, ethoxylated 68002-97-1 3.1 0.000403839 673.227
Alcohols, ethoxylated 68551-12-2 3.1 0.000403839 673.227

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SNYDER BROS INC 112,425.00 10 0.00 0 0.00 0
2018 SNYDER BROS INC 1,512,171.00 231 0.00 0 0.00 0
2019 SNYDER BROS INC 434,756.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2017 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 1,262.23 Bbl REUSE (AT WELL PAD)
2017 SNYDER BROS INC Synthetic Liner Materials (in Tons) RWC 806 2.48 Tons LANDFILL 100585
2017 SNYDER BROS INC Produced Fluid (in Tons) RWC 802 46.32 Tons LANDFILL 100585
2017 SNYDER BROS INC Drilling Fluid Waste (in Barrels) RWC 803 2,230.03 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 8,246.90 Bbl INJECTION DISPOSAL WELL 34-099-23158
2017 SNYDER BROS INC Drill Cuttings (in Tons) RWC 810 1,214.40 Tons LANDFILL 100585
2017 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 3,753.06 Bbl INJECTION DISPOSAL WELL 34-155-24079
2017 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 313.90 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 63.80 Bbl INJECTION DISPOSAL WELL 34-155-23196
2018 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 1,180.40 Bbl REUSE (AT WELL PAD)
2018 SNYDER BROS INC Produced Fluid (in Tons) RWC 802 11.30 Tons LANDFILL 100585
2018 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 93.80 Bbl INJECTION DISPOSAL WELL 34-155-23223
2018 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 30,842.50 Bbl INJECTION DISPOSAL WELL 34-099-23158
2018 SNYDER BROS INC Filter Socks (in Tons) RWC 812 1.37 Tons LANDFILL 100585
2018 SNYDER BROS INC Synthetic Liner Materials (in Tons) RWC 806 3.95 Tons LANDFILL 100585
2018 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 290.10 Bbl INJECTION DISPOSAL WELL 34-155-24079
2019 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 2,891.00 Bbl INJECTION DISPOSAL WELL 34-099-23158
2019 SNYDER BROS INC Produced Fluid (in Barrels) RWC 802 18.80 Bbl INJECTION DISPOSAL WELL 34-155-23223

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2562482 Primary Facility 2017-02-16 Drilling/Alteration No Violations Noted Drilling permit on site-log book up to date-6'x6' cellar in place-Rocky Mt. conductor Rig drilled-ran 84' of new 24" pipe. Hit H2O @ 58'. Site looked ok.
2563719 Primary Facility 2017-02-21 Routine/Complete Inspection No Violations Noted Site had been constructed in accordance with the E&S plan contained within the ESCGP. All E&S controls appeared to be functioning properly. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Drilling had commenced but was not ongoing at the time of the inspection.
2582529 Primary Facility 2017-04-13 Drilling/Alteration No Violations Noted Rig resumed drilling 4/10/2017. Ran 866' of 13 3/8" casing-cemented with 704 sks cement-got 25 bbl return. Drilling @ 886' at time of inspection. Drilling log information up to date-all equipment on site looked ok.
2604743 Primary Facility 2017-06-16 Routine/Complete Inspection No Violations Noted Drilling for the Dynamite 2H is anticipated to begin on or about 06/19/17. Drilling was ongoing on the well pad for the Dynamite 3H. Secondary containment onsite and it appeared to be in sound condition. Drill cutting waste containers were onsite on the secondary containment. Drill cuttings are being hauled off-site for disposal. All E&S controls had been properly implemented and maintained. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2612504 Primary Facility 2017-07-06 Drilling/Alteration No Violations Noted The Rig was tripping pipe out of the hole getting ready to run and cement 5' production casing at the time of this inspection. Daily drilling info and all equipment on site looked ok.
2619505 Primary Facility 2017-07-27 Routine/Complete Inspection No Violations Noted Drilling had been completed, work was ongoing to prep the site for well stimulation activities. Well pad secondary containment had been inspected and patched as necessary after removal of the drilling equipment. All site and access road erosion controls appeared to be functioning properly and there was no observed accelerated erosion or sedimentation in relation to the site or access road.
2626440 Primary Facility 2017-08-14 Drilling/Alteration No Violations Noted Upper manual valve not operating properly. All existing valves will remain on well until HCR can be opened. An extra manual MV will be installed on top to provide an extra barrier.
2626480 Primary Facility 2017-08-15 Drilling/Alteration No Violations Noted Operator waiting on CUD to arrive from Oklahoma to drill out stuck Canary valve. All existing valves will remain on well until HCR can be opened. An extra manual MV will be installed on top to provide an extra barrier.
2628204 Primary Facility 2017-08-21 Drilling/Alteration No Violations Noted This well still has the Canary frac stack well head on it. CUD drilled out top stuck valve but something is plugging well bore at 9' below surface. Well frac is on hold for the time being and is shut in with 3 levels of valve protection.
2630654 Primary Facility 2017-08-28 Drilling/Alteration No Violations Noted The frac crew was waiting on the snubbing unit to remove an unknown object 9' below the surface inside this well bore at the time of this inspection.
2641947 Primary Facility 2017-09-29 Routine/Complete Inspection No Violations Noted Well stimulation equipment is slated to be brought onsite and well stimulation activities resume for the Dynamite 1H beginning Monday October 2, 2017. All site and access erosion controls had been implemented and maintained as outlined in the E&S Plan contained within the ESCGP. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2645785 Primary Facility 2017-10-11 Drilling/Alteration No Violations Noted At the time of this inspection Keane is set up and just finished fracking stage 42 of the planned 55 stages to be fracked on this well. All site information and all equipment on site looked ok.
2648464 Primary Facility 2017-10-17 Routine/Complete Inspection No Violations Noted All erosion controls for the site and access road had been implemented and maintained as outlined in the E&S plan. There was no observed accelerated erosion or sedimentation in relation to the site or access road. Secondary containment was located onsite, set in place and maintained as outlined in the Containment plan. Well stimulation activities had been completed. Work was underway to prepare the site and set-up the equipment necessary for drilling out the frac plugs.
2665260 Primary Facility 2017-11-29 Routine/Complete Inspection No Violations Noted At time of inspection, well is drilled and has been stimulated. The remaining three wells on the pad are also drilled and have been stimulated. On-site contractors appear to be preparing and maintaining equipment for the production of the wells.
2680912 Primary Facility 2018-01-10 Routine/Complete Inspection No Violations Noted At time of inspection, well 1H is drilled and appears equipped for production. Wells 2H, 3H, and 4H are also drilled and appear equipped for production.
2709844 Primary Facility 2018-03-26 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
2724365 Primary Facility 2018-04-18 Routine/Partial Inspection No Violations Noted At time of inspection, well 1H is drilled and appears equipped for production. Wells 2H, 3H, and 4H are also drilled and appear equipped for production.
2743236 Primary Facility 2018-06-13 Routine/Partial Inspection No Violations Noted At time of inspection, well 1H is drilled and appears equipped for production. Wells 2H, 3H, and 4H are also drilled and appear equipped for production.
2766733 Primary Facility 2018-08-23 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The annulus is open. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
2818432 Primary Facility 2018-12-17 Site Restoration No Violations Noted Inspection conducted in response to Post Drilling Restoration Report received by Department.

Well appears to be in production. Well head surrounded by cement barriers. Three brine tanks located on site. This restoration report has been reviewed and is approved.

2821022 Primary Facility 2019-01-02 Routine/Complete Inspection No Violations Noted This well is tagged and in production with the annulus open. The well head casing, piping, production set equipment, containment dike and tank battery look ok.

For data sources see[7]

References