If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-015-20118 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.672523,"lon":-76.364501,"icon":""}]} |
County: Bradford | |
Municipality: Asylum Township | |
Operator Name: CHESAPEAKE APPALACHIA LLC | |
Well Pad ID: 148990 | |
Farm/Lease Name: OTTEN 626935 1H | |
First Permit Date: 2008-12-04 | |
Last Permit Date: 2008-12-04 | |
Spud Date: 2008-12-21 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: 9 | |
Latitude: 41.672523 | |
Longitude: -76.364501 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1809640 | 2009-07-01 | Outstanding Violations - No Viols Req'd | See Insp ID 1822480, past viols corrected. MBC 9/1/09
On 2/19/09, I inspected the site and noted that uncontained drilling fluids were located on the surface of the well pad and also located off-site, downgradient of the fill slope. In addition, portions of the site were not properly stabilized in accordance with Chapter 102 regulations. The 2/19/09 inspection was inputted under # 1770903. John Ryder accompanied me during this inspection. We verified that the previously spilled drilling fluids had been excavated as previously indicated. However, the fill slope was not properly stabilized and the silt fence at the base of the fill slope was not properly installed to minimize erosion potential. I spoke with Brad Wittrock of Chesapeake regarding the outstanding Chapter 102 violations. Brad indicated that the violations will be corrected by next week. I will reinspect to verify. |
|
1822480 | 2009-08-21 | No Violations Noted | Former spill areas checked, all appeared to be in order. Past violations/problems cited at inspection IDs 1770903 and 1809640 corrected. MBC 9/1/09 | |
1764739 | 2009-01-16 | Viol(s) Noted & Immediately Corrected | 554891 | |
1770903 | 2009-02-19 | Violation(s) Noted | See Insp ID 1822480, past viols corrected. MBC 9/1/09 | 556855 |
1770903 | 2009-02-19 | Violation(s) Noted | See Insp ID 1822480, past viols corrected. MBC 9/1/09 | 556856 |
1770903 | 2009-02-19 | Violation(s) Noted | See Insp ID 1822480, past viols corrected. MBC 9/1/09 | 556856 |
1770903 | 2009-02-19 | Violation(s) Noted | See Insp ID 1822480, past viols corrected. MBC 9/1/09 | 556857 |
1770903 | 2009-02-19 | Violation(s) Noted | See Insp ID 1822480, past viols corrected. MBC 9/1/09 | 556857 |
1770903 | 2009-02-19 | Violation(s) Noted | See Insp ID 1822480, past viols corrected. MBC 9/1/09 | 556858 |
1770903 | 2009-02-19 | Violation(s) Noted | See Insp ID 1822480, past viols corrected. MBC 9/1/09 | 556858 |
1891642 | 2010-06-15 | Violation(s) Noted | Brine spill outside of secondary containment | 589558 |
1891642 | 2010-06-15 | Violation(s) Noted | Brine spill outside of secondary containment | 589559 |
1891642 | 2010-06-15 | Violation(s) Noted | Brine spill outside of secondary containment | 589560 |
1907469 | 2010-08-19 | Violation(s) Noted | Waste all over ground at site | 593640 |
1909923 | 2010-08-31 | No Violations Noted | ||
1964804 | 2011-04-11 | No Violations Noted | 1500# prod, 200# ann. | |
1978600 | 2011-06-07 | No Violations Noted | A complaint was filed to the Department regarding potential contamination at this site. Conducted an inspection of the site with Sean VanFleet Solid Waste Specilaist, North Central Region. We noted a small area of standing water below a cleanout in the pipeline area relatively close to th site entrance. The area was approximately 1 to 2 feet in diameter and the volume of water was approximately 2 to 3 gallons. We used an EXTECH meter to obtain a conductivity reading of the water. The meter read (OL) which means over the limit in conductivity. We performed sampling analysis of the water using SAC 046. We also noted E&S issues off the NE corner of the pad behind the production tanks. The berm was noted to contain accelerated erosion causing an erosion channel in this area. E&S issues will be referred to Gene Rickard, Water Quality Specialist, who will conduct a follow up inspection of the site. |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2012-2 | 180239.0 | 181.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-1 | 210272.0 | 182.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-2 | 189613.0 | 136.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-1 | 291392.0 | 176.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-2 | 396078.0 | 174.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-3 | 775588.0 | 295.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 240735.0 | 133.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2012-2 | PRODUCED FLUID | 58.5 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING | |||
2010-3 | FRACING FLUID WASTE | 5415.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | PA | ||
2011-1 | FRACING FLUID WASTE | 63.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR DRILLING OR PLUGGING | PA | ||
2011-2 | FRACING FLUID WASTE | 86.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE OF BRINE TO FRAC A WELL | |||
2012-1 | PRODUCED FLUID | 173.0 | Bbl | REUSE OTHER THAN ROAD SPREADING | REUSE FOR HYDRAULIC FRACTURING |