X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-021-20890

Well Details

Well ID: 37-021-20890
Loading map...
Country: United States
State: Pennsylvania
County: Cambria
Municipality: Chest Township
Operator Name: DORSO LP
Well Pad ID:
Farm/Lease Name: LEIDEN/K&J UNIT 1
License Status: Active
Spud Date: 10/29/2003
Permit Date: 8/16/2003
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.705415
Longitude: -78.648167

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2004 DORSO LLC 16,059.00 306 0.00 0.00
2005 DORSO LLC 29,648.00 365 0.00 0.00
2006 DORSO LP 19,336.00 365 0.00 0.00
2007 DORSO LP 13,426.00 365 0.00 0.00
2008 DORSO LP 10,343.00 365 0.00 0.00
2009 DORSO LP 8,906.00 365 0.00 0.00
2010 DORSO LP 9,016.00 365 0.00 0.00
2011 DORSO LP 8,650.00 365 0.00 0.00
2012 DORSO LP 6,766.00 365 0.00 0.00
2013 DORSO LP 6,299.00 365 0.00 0.00
2014 DORSO LP 5,888.00 365 0.00 0.00
2015 DORSO LP 4,302.00 365 0.00 0.00
2016 DORSO LP 3,261.00 304 0.00 0.00
2017 DORSO LP 1,874.00 273 0.00 0.00
2018 DORSO LP 3,397.00 365 0.00 0.00

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1890109 Primary Facility 06/03/2010 Site Restoration No Violations Noted At the time of inspection, the well was drilled and in production. Well properly tagged. Brine tank appeared sound. No accelerated erosion or sedimentation issues were noted in relation to well site or access road. Well pad was rocked and surrounding areas were adequately restored with at least 70% successful vegetative growth.
1890460 Primary Facility 06/09/2010 Routine/Complete Inspection No Violations Noted According to records, well was completed on 10/31/03 to depth of 3790 ft and has been permitted since 08/16/03. WRAC was submitted and approved on 12/05/03. Well tag information present at the site. Well head completed with 8¿ pipe reduced to 4¿ and reduced to 2¿ production line. Production equipment consisted of separator (150 psi), data logger (150 psi/100 psi), and 100 bbl brine tank (< 20 bbl fluid). No E&S issues and no IW issues during inspection surrounding the production well. No signs of gas leak at the well head and lines
2624286 Primary Facility 2017-08-09 Routine/Complete Inspection No Violations Noted system running. no issues at the site.

For data sources see[5]

References