X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-031-22979"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-031-22979
 
| Well ID: 37-031-22979
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.039063, -79.272762 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.039063, -79.272762 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 3/27/1998
+
| Spud Date: 1998-03-27
 
|-
 
|-
 
| Permit Date:  
 
| Permit Date:  
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 317
 
| style="text-align: right;" | 317
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2000
 
| 2000
Line 74: Line 99:
 
| style="text-align: right;" | 361
 
| style="text-align: right;" | 361
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2001
 
| 2001
Line 83: Line 108:
 
| style="text-align: right;" | 359
 
| style="text-align: right;" | 359
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2002
 
| 2002
Line 92: Line 117:
 
| style="text-align: right;" | 363
 
| style="text-align: right;" | 363
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
Line 101: Line 126:
 
| style="text-align: right;" | 359
 
| style="text-align: right;" | 359
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
Line 110: Line 135:
 
| style="text-align: right;" | 352
 
| style="text-align: right;" | 352
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
Line 119: Line 144:
 
| style="text-align: right;" | 352
 
| style="text-align: right;" | 352
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
Line 128: Line 153:
 
| style="text-align: right;" | 359
 
| style="text-align: right;" | 359
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
Line 137: Line 162:
 
| style="text-align: right;" | 309
 
| style="text-align: right;" | 309
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 146: Line 171:
 
| style="text-align: right;" | 238
 
| style="text-align: right;" | 238
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 155: Line 180:
 
| style="text-align: right;" | 250
 
| style="text-align: right;" | 250
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 164: Line 189:
 
| style="text-align: right;" | 285
 
| style="text-align: right;" | 285
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 173: Line 198:
 
| style="text-align: right;" | 258
 
| style="text-align: right;" | 258
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 182: Line 207:
 
| style="text-align: right;" | 249
 
| style="text-align: right;" | 249
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 191: Line 216:
 
| style="text-align: right;" | 309
 
| style="text-align: right;" | 309
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 200: Line 225:
 
| style="text-align: right;" | 347
 
| style="text-align: right;" | 347
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 209: Line 234:
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 364
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 218: Line 243:
 
| style="text-align: right;" | 343
 
| style="text-align: right;" | 343
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 227: Line 252:
 
| style="text-align: right;" | 354
 
| style="text-align: right;" | 354
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 236: Line 261:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 250: Line 275:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 255: Line 281:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2011-0
+
| 2011
 +
| [[TEXAS KEYSTONE INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 75.00 Bbl
 
| style="text-align: right;" | 75.00 Bbl
Line 261: Line 288:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2012-0
+
| 2012
 +
| [[TEXAS KEYSTONE INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 165.00 Bbl
 
| style="text-align: right;" | 165.00 Bbl
Line 267: Line 295:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2013-0
+
| 2013
 +
| [[TEXAS KEYSTONE INC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 292: Line 321:
 
| 220098
 
| 220098
 
| Primary Facility
 
| Primary Facility
| 04/01/1998
+
| 1998-04-01
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 299: Line 328:
 
| 220201
 
| 220201
 
| Primary Facility
 
| Primary Facility
| 04/13/1998
+
| 1998-04-13
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 306: Line 335:
 
| 220435
 
| 220435
 
| Primary Facility
 
| Primary Facility
| 06/01/1998
+
| 1998-06-01
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 313: Line 342:
 
| 2306094
 
| 2306094
 
| Primary Facility
 
| Primary Facility
| 09/16/2014
+
| 2014-09-16
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 332: Line 361:
 
| 111598
 
| 111598
 
| 04/01/1998
 
| 04/01/1998
| 04/02/1998
+
| 1998-04-01
 
| 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling
 
| 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling
 
| Administrative
 
| Administrative
Line 356: Line 385:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 16:40, 21 August 2019

Well Details

Well ID: 37-031-22979
Loading map...
Country: United States
State: Pennsylvania
County: Clarion
Municipality: Redbank Township
Operator Name: DIVERSIFIED OIL & GAS LLC
Well Pad ID:
Farm/Lease Name: LOIS WYANT 4
License Status: Active
Spud Date: 1998-03-27
Permit Date:
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.039063
Longitude: -79.272762

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1999 TEXAS KEYSTONE INC 13,315.00 317 0.00 0 0.00 0
2000 TEXAS KEYSTONE INC 21,390.00 361 0.00 0 0.00 0
2001 TEXAS KEYSTONE INC 19,345.00 359 0.00 0 0.00 0
2002 TEXAS KEYSTONE INC 14,551.00 363 0.00 0 0.00 0
2003 TEXAS KEYSTONE INC 13,049.00 359 0.00 0 0.00 0
2004 TEXAS KEYSTONE INC 10,645.00 352 0.00 0 0.00 0
2005 TEXAS KEYSTONE INC 9,640.00 352 0.00 0 0.00 0
2006 TEXAS KEYSTONE INC 8,398.00 359 0.00 0 0.00 0
2007 TEXAS KEYSTONE INC 6,495.00 309 0.00 0 0.00 0
2008 TEXAS KEYSTONE INC 5,749.00 238 0.00 0 0.00 0
2009 TEXAS KEYSTONE INC 6,293.00 250 0.00 0 0.00 0
2010 TEXAS KEYSTONE INC 6,401.00 285 0.00 0 0.00 0
2011 TEXAS KEYSTONE INC 4,761.00 258 0.00 0 0.00 0
2012 TEXAS KEYSTONE INC 3,140.00 249 0.00 0 0.00 0
2013 TEXAS KEYSTONE INC 2,599.00 309 0.00 0 0.00 0
2014 TEXAS KEYSTONE INC 3,285.00 347 0.00 0 0.00 0
2015 TEXAS KEYSTONE INC 3,955.00 364 0.00 0 0.00 0
2016 DIVERSIFIED OIL & GAS LLC 3,834.00 343 0.00 0 0.00 0
2017 DIVERSIFIED OIL & GAS LLC 3,821.00 354 0.00 0 0.00 0
2018 DIVERSIFIED OIL & GAS LLC 1,213.00 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 TEXAS KEYSTONE INC Produced Fluid (in Barrels) 75.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012 TEXAS KEYSTONE INC Produced Fluid (in Barrels) 165.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2013 TEXAS KEYSTONE INC Produced Fluid (in Barrels) 80.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
220098 Primary Facility 1998-04-01 Drilling/Alteration Violation(s) Noted
220201 Primary Facility 1998-04-13 Drilling/Alteration No Violations Noted
220435 Primary Facility 1998-06-01 Routine/Complete Inspection No Violations Noted
2306094 Primary Facility 2014-09-16 Routine/Complete Inspection No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
220098 111598 04/01/1998 1998-04-01 201G - Failure to post permit number, operator name, address, telephone number in a conspicuous manner at the site during drilling Administrative

For data sources see[6]

References